FM 548 from SH 66 to Crenshaw Road
Skip to main content

FM 548 from SH 66 to Crenshaw Road

Virtual public meeting with in-person option

Virtual: Tuesday, May 21, 2024, 5:30 p.m. through Wednesday, June 5, 2024, at 11:59 p.m.

In-person open house: Tuesday, May 21, 2024, 5:30 p.m. to 7:30 p.m.

Public comment deadline All comments must be received on or before Wednesday, June 5, 2024 by 11:59 p.m.
Virtual details The virtual public meeting materials will be posted to the project website and will consist of a pre-recorded video presentation that includes both audio and video components, along with other exhibits. The virtual public meeting is not a live event. If you do not have internet access, you may call (214) 320-6628 between the hours of 8 a.m. and 5 p.m. Monday through Friday, to ask questions and access study materials. Please note the materials will not be available until Tuesday, May 21, 2024, at 5:30 p.m.
In-person details Tuesday, May 21, 2024
5:30 - 7:30 p. m. (Open House)
Ouida Baley Middle School
1310 SH-66
Royse City, TX 75189
Purpose TxDOT is proposing to improve FM 548 from SH 66 to South of Crenshaw Road in Royse City in Rockwall County, Texas. The purpose of the proposed project is to enhance the various mobility, access management and roadway safety aspects along FM 548.
Description

The proposed project reconstructs and widens FM 548 from a two-lane rural roadway to a four-lane divided urban roadway. The proposed project would include accommodations for pedestrians and bicyclists. The project would extend for a length of approximately 2.97 miles along FM 548 from SH 66 in Royse City to south of Crenshaw Road in Rockwall County, Texas. The existing Right-of-Way width (ROW) varies from 60 feet-wide to 100 feet-wide and the proposed Right-of-Way width (ROW) varies from 70 feet-wide to 145 feet-wide along the project corridor.

The proposed project would, subject to final design considerations, require additional ROW and have a potential displacement or relocation of two business locations and one residential location. Relocation assistance is available for displaced persons and businesses. The proposed ROW is approximately 13.24 acres. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for ROW acquisition and construction, can be obtained from the TxDOT district office by calling (214) 320-6675 or on the project website.

The proposed project would potentially involve construction in wetlands. The proposed project would also potentially involve an action in a floodplain.

Accessibility The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the TxDOT Public Information Office at (214) 320-4480 no later than 4 p.m., Thursday, May 16, 2024. Advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials
How to make a comment

Comments from the public regarding the proposed project are requested and may be submitted by:

  • Mail:
    TxDOT Dallas District Office
    c/o Nelson Underwood, P.E. ; RE: FM 548
    4777 East Highway 80
    Mesquite, TX 75150
  • Email: as shown in the notice

All comments must be received on or before Wednesday, June 5, 2024, to be included in the official public meeting record. 

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.