SH 105 Widening Project
Skip to main content

SH 105 Widening Project

From SH 249 to SH 6

In-person public meeting

In-person: Thursday, June 11, 2026, from 4:30 p.m. to 6:30 p.m. CT

Meeting details

Public comment deadline All comments must be received on or before Monday, June 29, 2026.
Public meeting details

Thursday, June 11, 2026
4:30 p.m. to 6:30 p.m.

Grimes County Fairgrounds – Main Hall
5220 FM 3455,
Navasota, Texas 77868

Attendees will be able to come and go as they please to review informational displays and ask questions of staff in an open house format. On the day of the public meeting, the information presented will be made available online on this webpage.

Purpose The Texas Department of Transportation (TxDOT) – Bryan District is proposing improvements to SH 105 from SH 249 to SH 6 in Grimes County, Texas.  This notice advises the public that the project team will be conducting an in-person public meeting on the proposed project.  
Description

The proposed improvements include the construction of a direct-connect interchange at the intersection of SH 105 and SH 6. The direct-connect interchange would connect SH 105 westbound to SH 6 northbound and SH 6 southbound to SH 105 eastbound. Updates to the working design include modification of the FM 362 intersection to remain at-grade, construction of one-way frontage roads along the corridor, and a new overpass at County Road 410.  The project length is approximately 6.5 miles.  

Any environmental documentation or studies, maps and drawings showing the project location and design, tentative construction schedules and other information regarding the proposed project are on file and available for inspection by appointment only Monday through Friday between 8 a.m. and 5 p.m. at TxDOT Bryan District Office, 2591 North Earl Rudder Freeway, Bryan, TX 77803, 979-778-2165.

Accessibility The public meeting will be conducted in English. If you need an interpreter or translator because English is not your primary language or have difficulty communicating in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or are a person with a disability who requires accommodation to attend and participate in the public meeting, please contact the Bryan District Public Information Officer at (979) 778-9764 no later than 4 p.m. CT, Monday, June 8, 2026.
Meeting materials
How to make a comment

Comments from the public regarding the proposed plan are requested and can be submitted in the following ways:

  • Mail: TxDOT Bryan District Office
    Attn: SH 19 Intersection Improvements
    2591 North Earl Rudder Freeway
    Bryan, TX 77803
  • Email: BRY_PublicComment@txdot.gov

All comments must be received on or before Monday, June 29, 2026.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT

Posted: May 27, 2026