FM 2720 improvement project from SH 21 to SH 142
Skip to main content

FM 2720 improvement project from SH 21 to SH 142

Virtual public meeting with in-person option

Virtual: Thursday, June 1, 2023, at 5 p.m. CT

In-person: Thursday June 1, 2023, from 5 p.m. to 7 p.m. CT

Presentation
Public comment deadline All comments must be received on or before July 3, 2023, 11:59 p.m. (extended from previous deadline of June 16, 2023), to be included in the official record of the public meeting.
Virtual details A pre-recorded video presentation will be accessible on this web page beginning at 5 p.m. on Thursday, June 1, 2023, and will remain online through Monday, July 3, 2023.
In-person details The in-person option will be held on Thursday, June 1, 2023, from 5 p.m. to 7 p.m. at Lockhart Junior High School, 500 City Line Road, Lockhart, TX 78644.
Purpose

The purpose of the virtual public meeting is to receive public comment on the proposed improvements to FM 2720 in Hays and Caldwell Counties, TX. The virtual public meeting will consist of a pre-recorded video presentation and will include both audio and visual components. The presentation will be available online at 5 p.m. on Thursday, June 1, 2023.

TxDOT is also providing and in-person option for individuals who would like to participate in person instead of online. In person attendees will be able to view the same presentation delivered in the online public meeting, review public materials, ask questions of TxDOT staff and/or consultants, and leave written comments.

Description

The proposed project would improve 7.2 miles of FM 2720 from SH 21 to SH 142 in Hays and Caldwell counties, including intersection improvements at CR 235. The purpose of the proposed project is to enhance safety, improve connectivity and improve mobility by providing additional roadway capacity to meet current and future traffic demands due to population growth and increased traffic volumes. Throughout the project limits, the existing roadway is two lanes.

Proposed improvements would:

  • Widen to a four-lane undivided roadway with a center two-way left-turn lane from SH 21 to south of CR 228.
  • Widen to a four-lane divided roadway from south of CR 228 to just south of CR 235.
  • Widen to a two-lane roadway with a center two-way left-turn lane from south of CR 235 to SH 142.
  • Separate travel lanes by adding a two-way left-turn lane or grassy median with cable barrier.
  • Add right-turn lanes at various intersections.
  • Add safety improvements to the intersection at CR 235.
  • Upgrade the signal at SH 21 and FM 2720.

Additional right of way would be required; however, no residential or non-residential displacements are anticipated at this time.

Accessibility The virtual and in-person public meeting will be conducted in English. If you need an interpreter or document translator, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires accommodation to attend and participate in the virtual public meeting, please contact the public involvement specalist at 512-832-7060 no later than 4 p.m. CT, Friday, May 26, 2023. Please be aware that advance notice is required as some services and accommodations may require time to arrange.
Meeting materials
How to make a comment

Written comments may be submitted by the following methods.

Comments must be received or postmarked by Monday, July 3, 2023, 11:59 p.m. (deadline extended from Friday, June 16, 2023), to be included in the official record of the public meeting.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.

Posted: May 15, 2023