US 81/287
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Avondale-Haslet Road to I-35W

TxDOT is proposing the following improvements to US 81/287 from south of Avondale-Haslet Road to I-35W:   

  • Add one inside mainlane in each direction
  • Construct continuous one-way frontage roads
  • Convert existing two-way frontage roads to one-way frontage roads
  • Reconstruct existing interchanges
  • Reconstruct Willow Springs Road to cross under the US 81/287 mainlanes
  • Construct interchange at Heritage Trace Parkway
  • Connect Wagley Robertson Road to the proposed frontage roads
  • Adjust entrance and exit ramp locations.

Additional right of way will be required to accommodate this proposed seven-mile project. The project is not currently funded for construction. The approximate construction cost is $200 million.

Downloads

Rhome to Avondale-Haslet Road

TxDOT is proposing the following improvements to US 81/287 from north of Pioneer Road in Rhome to south of Avondale Haslet Road:

  • Add and reconstruct frontage roads
  • Convert the existing frontage roads to a continuous one-way, two-lane design
  • Add left-turn lanes at cross streets
  • Provide bicycle and pedestrian accommodations
  • Construct interchange at County Road 4840
  • Construct interchange at Ramhorn Hill Road
  • Construct interchange at future Northstar Parkway
  • Construct new direct connectors at SH 114
  • Add operational improvements to existing cross streets, mainlanes, ramps, and auxiliary lanes

Additional right of way will be required to accommodate this proposed 10-mile project. The project is not currently funded for construction. The approximate construction cost is $200 million.

Downloads

Contact Us
Fort Worth District Office
2501 SW Loop 820
Fort Worth, TX 76133
(817) 370-6500

Email

 

 

Copyright 2022  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701