Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


SH 199 at I-820 Interchange

The Texas Department of Transportation is conducting a study for proposed improvements on State Highway (SH) 199 from Hodgkins Road to Skyline Drive and on I-820 from Navajo Trail to Marine Creek Parkway (including the SH 199/Interstate 820 Interchange).  This proposed project will improve mobility, capacity and safety. The study includes mainlane improvements, direct connect ramps to and from SH 199 and I-820, entrance and exit ramp adjustments, frontage road/cross streets and pedestrian/bicycle facilities.

Public meetings and an opportunity for a public hearing will be conducted to collect input that will be used to develop the project in a way that minimizes impacts to the community.

The estimated project cost is $284 million, and construction could start as early as 2024.

Downloads

Contact Us

Fort Worth District Office
2501 SW Loop 820
Fort Worth, TX 76133
(817) 370-6500

Email

SH 199 Interchange Project Manager
Phone: 817-370-6560