Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Proposed improvements from Eagle Parkway to US 81/US 287 include:

  • 10-lane facility with three 12-foot general purpose lanes in each direction plus auxiliary lanes
  • 10-foot wide inside and outside shoulders
  • Two 12-foot wide managed (toll) lanes in each direction, with 10-foot wide outside and 4-foot wide inside shoulders
  • Direct connectors from IH 35W to SH 170

Proposed improvements from US 81/ US 287 to Basswood Boulevard include:

  • 12-lane facility with four 12-foot general purpose lanes in each direction plus auxiliary lanes
  • 10-foot wide inside and outside shoulders
  • Two 12-foot wide managed (toll) lanes in each direction with 10-foot wide outside and 4-foot wide inside shoulders
  • Direct connectors to/from US 81/US 287 from IH 35W managed (toll) lanes

Proposed improvements from Basswood Boulevard to IH 820 include:

  • 14-lane facility with four 12-foot general purpose lanes in each direction plus auxiliary lanes
  • 10-foot wide inside and outside shoulders
  • Three 12-foot wide managed (toll) lanes in each direction with 10-foot wide outside and 4-foot wide inside shoulders

Additional proposed corridor improvements from Eagle Parkway to IH 820 include:

  • Discontinuous frontage roads with one 12-foot wide inside lane and one 14-foot wide outside shared lane for bicyclists
  • 6-foot wide sidewalks for pedestrians

The I-35W project is part of the North Tarrant Express (NTE) Master Development Plan (MDP).