TxDOT Brownwood District is proposing to reconfigure the US 190 (Plum Street) intersection and reconstruct the roadway to include a continuous center-turn lane, curb and gutter, illumination, sidewalks, and drainage improvements between Sulphur Creek and the Burnet County Line in Lampasas County.

Proposed Project Benefits

  • Improve the safety and mobility of US 190 (Plum St.) intersection
  • Increase mobility; approximately 7,800 vehicles per day travel this roadway each day including  truck traffic - traffic is projected to increase to nearly 11,000 vehicles per day by 2037

Proposed Improvements

  • Reconstruct and widen pavement
  • Improve intersections
  • Improve drainage
  • Add sidewalks and illumination
  • Add a center turn lane for vehicles making left-hand turning movements 

This project requires utility relocation and right of way (ROW); however, that amount has not been determined at this point.

Estimated Timeline

  • Public Meeting - late Fall 2019
  • Public Meeting - Spring 2020
  • Potential Public Hearing - Spring 2020
  • Finalize Construction Plans once approved – Summer 2020
  • Estimated Environmental Clearance - Late 2020 
  • Begin right of way acquisition process - Late 2020 
  • Utility adjustments/relocations - Fall 2020  - Spring 2022
  • Construction contract awarded: Summer 2022
  • Construction duration: To be Determined