SH 6 Reconstruction - Gorman
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


TxDOT is proposing to make improvements to SH 6 in Gorman, from 0.18 mile north of Crescent Street to the Comanche County line. The proposed SH 6 reconstruction improvements include concrete curbs, gutters, and sidewalks added or upgraded throughout the length of the project. All sidewalks would conform to ADA requirements (Americans with Disabilities Act).

Project Development Phases and Anticipated Schedule

  • Developed preliminary schematic designs for proposed project
  • Conducted first Public Meeting: Nov. 15, 2018
  • Began project design based on public feedback
  • Reviewed preliminary design plans
  • Conducted second Public Meeting: Feb. 19, 2019
  • Incorporated additional public feedback and finalized project design Spring 2021:
    Begin utility relocations and finalize right-of-way acquisition
  • Contract Letting: Fall/Winter 2022
  • Upon Approval, construction Begins: Estimated Spring 2023
  • Projected project cost: Approximately $14 million

Get Involved

Downloads

Contact Us

TxDOT Brownwood District
2495 Highway 183 N.
Brownwood, TX 76802
(325) 643-0415
Email

 

Copyright 2021  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701