The Texas Department of Transportation Beaumont District is proposing to reconstruct FM 565 from SH 99 to SH 146 on the east side of Baytown in Chambers County, Texas.
Proposed Benefits
The proposed project is anticipated to improve safety, enhance mobility and reduce congestion.
Proposed Improvements
The approximately 2.9 mile project includes:
The project would require additional right of way from SH 146 to FM 1405; exact amount of right of way has yet to be determined. The project costs approximately $39 million.
In addition, the public may also learn more about the FM 565 “S-Curve” project – a nearby project that’s currently underway. The FM 565 “S-Curve” project proposes to realign and eliminate the “S” curve to meet current design standards, from approximately 1.02 miles west of FM 2354 to 0.36 miles east of FM 1405.
Get Involved
TxDOT encourages the public to provide their comments during an online comment opportunity period beginning Friday, Aug. 2, 2019 to Friday, Sept. 6, 2019:
Downloads
Contact Us
TxDOT Beaumont District
8350 Eastex Freeway
Beaumont, TX 77708
(409) 898-5732
Email
Copyright 2019
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701