Virtual Public Meeting with In-Person Option - I-30 East Corridor
Skip to main content

Virtual Public Meeting with In-Person Option - I-30 East Corridor

Where:

The virtual public meeting will be posted beginning Tuesday, June 8, 2021 at 4 p.m.

When:

The virtual public meeting will begin on Tuesday, June 8, 2021 at 4 p.m. This is not a live event and can be viewed any time beginning Tuesday, June 8, 2021 at 4 p.m. through Wednesday, June 23, 2021. All comments must be received on or before Wednesday, June 23, 2021.

Additionally, TxDOT is providing an in-person option for individuals who would like to participate in person instead of online. In-person attendees will be able to view the same presentation delivered in the online public meeting which will be playing on a screen, review hard copies of project materials, ask questions of TxDOT staff and/or consultants from a socially distanced approach, and leave written comments. The in- person option will be held on Tuesday, June 8, 2021 from 4 PM to 8 PM at the Fair Park Coliseum at 1438 Coliseum Drive, Dallas, Texas 75210. Attendance at the in-person option will be by appointment only. Individuals wishing to attend the in-person option must sign up or call (833) 933-0443 and leave a message and a staff member will return your call to schedule your appointment.

Purpose:

TxDOT in conjunction with the city of Dallas, is proposing reconstruction and widening of the I-30 East Corridor from I-345/I-45 to Broadway Boulevard in Dallas County, Texas. This notice advises the public that TxDOT will be conducting an online virtual public meeting on the western portion of the overall I-30 East Corridor Project with an in-person option. The segment of the I-30 East Corridor that is the subject of the public meeting extends from I-345/I-45 to Ferguson Road. 

Description:

The proposed improvements would include ten general purpose lanes (five in each direction), two reversible managed lanes, discontinuous two to three lane frontage roads in each direction, and reconstruction of ramps and bridge structures. The proposed I-30 main lanes and managed lanes would be depressed from I-345/I-45 to Dolphin Road. Accommodations for bicycle and pedestrian travel along the project corridor are a component of project development.

The proposed Right of Way typically ranges from 308 to 505 feet in width. The proposed improvements would require additional ROW.

Special Accommodations:

The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact Patrick Clarke, the Dallas District Public Information Officer, at (214) 320-4483 no later than 4 PM, Thursday, June 3, 2021. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

Memorandum of Understanding:

The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Contact:

TxDOT Dallas District
Public Information Office
(214) 320-4480
Email

Posted: May 21, 2021