Public Hearing - I-30 Frontage Roads Improvement Project
Skip to main content

Public Hearing - I-30 Frontage Roads Improvement Project

Where:

Terrace Room at Hella Shrine
2121 Rowlett Road
Garland, TX 75043 (Map)

When:

Thursday, May 31, 2018
Open House - 6 p.m.
Formal Hearing - 7 p.m.

Purpose:

The purpose of the hearing is to present the proposed construction of a continuous six-lane frontage road system crossing Lake Ray Hubbard along I-30, between Bass Pro Drive and Dalrock Road, in Garland and Rowlett, Texas, respectively. 

Description:

The proposed project includes constructing a continuous six-lane frontage road system crossing Lake Ray Hubbard along I-30, between Bass Pro Drive and Dalrock Road, in Garland and Rowlett, Texas, respectively.  The length of the proposed project is approximately 2.24 miles.  The improvements also include the construction of a new five-lane bridge for Bayside Drive (two lanes traveling southbound and three lanes traveling northbound) with left-turn lanes, a southbound Dalrock bypass, the reconstruction of the interchange at Dalrock Road to include a one-way Dalrock Road direct connector roadway from the eastbound I-30 frontage roads to northbound Dalrock Road, and associated ramp modifications. The project would include barrier-separated sidewalks located along the westbound outer lane of the frontage road for pedestrian accommodation, and a wide shared-use path would be constructed along the eastbound outer frontage road lane (also barrier separated) for both bicyclists and pedestrian accommodation. The shared-use path would connect with the existing/planned shared-use facilities in the cities of Garland, Rowlett, and Rockwall as a part of the Regional Veloweb per North Central Texas Council of Governments (NCTCOG) plans. At Bayside Drive bridge a sidewalk would be constructed along the northbound outer lane, and a shared-use path would be constructed along the southbound outer lane of the Bayside Drive bridge for both bicyclists and pedestrian accommodation. Both the sidewalk and shared-use path would connect with planned developments to be located north and south of IH 30.

Special accommodations: TxDOT makes every reasonable effort to accommodate the needs of the public. The open house and hearing will be conducted in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please call the TxDOT Dallas District Public Information Office at (214) 320-4480 at least two working days prior to the meeting. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange.

The environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been carried-out by TxDOT pursuant to 23 U.S.C 327 and a Memorandum of Understanding dated December 16, 2014, and executed by the Federal Highway Administration and TxDOT. 

Comments must be received on or before Friday, June 15, 2018 to be a part of the official record.

Contact:

TxDOT Dallas District
Public Information Office
(214) 320-4480
Email

Posted April 27, 2018