Construction and maintenance agreement requirements
TxDOT routinely enters into construction and maintenance agreements with railroad companies, which provide TxDOT license and permission to perform work within railroad right of way. A separate Contractor Right-of-Entry agreement will then be executed between the contractor and railroad company to allow the contractor onto railroad right of way.
As a part of these agreements, completion of guidance and procedural documents related to the development of C&M agreements between TxDOT and various railroad companies is required, including:
Schematic examples | Format |
---|---|
New Overpass Schematic | New Overpass |
Widened At-Grade Crossing Schematic | Widened At-Grade Crossing |
Widened Underpass Schematic | Widened Underpass |
Exhibit "A" examples | Format |
---|---|
New Overpass | New Overpass |
Widened At-Grade Crossing | Widened At-Grade Crossing |
Widened Underpass | Widened Underpass |
Joint Right-of-Way Usage | Joint Right-of-Way Usage |
Other documentation for design approval examples | Format |
---|---|
Proposed Construction Project Photos |
Proposed Construction Project Photos |
Design Conformance to Railroad Guidelines Report for Overpass Projects | Design Conformance to Railroad Guidelines Report (for Overpass Projects) |
Overhead Checklist for KCS Railway for Overpass Projects | Overhead Checklist for KCS Railway (for Overpass Projects) XLSX |
Boring Logs for Bridge Projects | Boring Logs (for Bridge Projects) |
Typical Selection Report for Underpass Projects | Typical Selection Report (for Underpass Projects) |
Hydraulics Analysis | Hydraulics Analysis |
Track Outage (Absolute Work Window) | Track Outage (Absolute Work Window) |
Railroad Scope of Work Matrix | Railroad Scope of Work Matrix XLSX |
Real estate | Format |
---|---|
Metes and Bounds Property Description - Example | Metes and Bounds Property Description - Example |
Sample Area Map for UPRR and BNSF Projects |
Sample Area Map for UPRR and BNSF Projects |
Pipe and wire crossings and encroachments on railroad right-of-way | Format |
---|---|
Union Pacific Railroad Pipeline Forms | Union Pacific Railroad Pipeline Forms HTML |
Union Pacific Railroad Wireline Forms | Union Pacific Railroad Wireline Forms HTML |
Pipeline Cooper E-80 Loading Calculations - Example |
Pipeline Cooper E-80 Loading Calculations |
Traffic signal pre-emption | Format |
---|---|
Traffic Signal Layout – Example | Traffic Signal Pre-emption |
Existing Traffic Signal Timing Data - Example | Existing Traffic Signal Timing Data – Example |
Pre-emption Form (TxDOT Form 2304) | Pre-emption Form (TxDOT Form 2304) HTML |
Railroad grade separation projects that remove an active warning device | Format |
---|---|
Procedures | Procedures |
Theoretical Structure | Theoretical Structure |
Railroad Five Percent Cost Estimate | Railroad Five Percent Cost Estimate XLS |