SH 7 at Lanana Creek bridge replacement
Skip to main content

SH 7 at Lanana Creek bridge replacement

Project overview

TxDOT is proposing to replace the existing bridge on SH 7 (Main St) at La Nana Creek , which is adjacent to the La Nana Creek Trail and Master Gardeners Demonstration Garden, a City of Nacogdoches park.

Proposed improvements

The project would be designed to enhance safety by meeting current design standards and would include:

  • Removing the existing bridge
  • Constructing new bridge with four 12-foot-wide travel lanes, two 4-foot-wide shoulders, and 6-foot-wide sidewalks in each direction
  • Providing bridge rails that will separate vehicular and pedestrian traffic
  • Accommodating users of the Lanana Creek Trail by increasing clearance underneath the bridge

Project timeline

  • PS&E design: spring 2023 to summer 2025
  • Environmental clearance: spring 2023 to fall 2024
  • Right-of-way acquisition and parcel clearing: winter 2024 to winter 2025
  • Utility relocations: winter 2025 to summer 2026
  • Construction begins: summer 2026