SH 7 at Lanana Creek bridge replacement
Skip to main content
SH 7 at Lanana Creek bridge replacement

Project overview

TxDOT is proposing to replace the existing bridge on SH 7 (Main St) at La Nana Creek , which is adjacent to the La Nana Creek Trail and Master Gardeners Demonstration Garden, a City of Nacogdoches park.

Proposed improvements

The project would be designed to enhance safety by meeting current design standards and would include:

  • Removing the existing bridge
  • Constructing a new bridge with four 12-foot-wide travel lanes, two four-foot-wide shoulders, and 6-foot-wide sidewalks in each direction
  • Providing bridge barrier rails that will separate vehicle and pedestrian traffic
  • Accommodating users of the Lanana Creek Trail by increasing clearance underneath the bridge

Project timeline

  • Environmental studies began in spring 2023. Environmental approval was completed in February 2025
  • Right-of-way acquisition began in winter 2025 and are anticipated to be completed in winter 2027
  • The detailed engineering plans, environmental permitting, and utility relocations are expected to be completed by winter 2028
  • Construction is anticipated to begin in Spring 2029

Downloads

Virtual public hearing