The Texas Department of Transportation (TxDOT) Lubbock district is preparing to complete construction and rehabilitation of the US 87 bridge crossing at FM 41, from .75 miles north of FM 41 to .75 miles south of FM 41 in Lubbock County, Texas. In addition to completing the bridge at US 87 and FM 41, work would include the rehabilitation of the service roads, address drainage concerns, and improve the roadway surface in the project limits.

Project purpose

The project is being performed to allow supplemental funding and opportunities to address drainage issues identified during the previous construction project.

Project status/Proposed timeline

TxDOT is preparing to let this project in December 2025.

Proposed detours

Improvements to the pavement surfaces will require modification to the travel pattern during construction. This includes on- and off-ramps, redesign of the intersection, drainage enhancements and driveway repairs.

Public outreach

All activities performed with public outreach include stakeholders, community members, and access for review by the public.