US 281 South Comal
Skip to main content

US 281 South Comal

From East Borgfeld Drive to SH 46

Draft Environmental Assessment and Public Hearing with Virtual Option

In Person: Tuesday, Oct. 6, 2026, from 5 to 7 p.m. CT

Virtual: Tuesday, Oct. 6, 2026

Hearing details

Public comment deadline All comments must be received on or before Wednesday, Oct. 21, 2026.
In-person details Tuesday, Oct. 6, 2026
5 to 7 p.m. CT
Bulverde Methodist Church – Community Center
28300 US 281
San Antonio, Texas 78260
Virtual details

The virtual option will consist of the same pre-recorded video presentation delivered at the public hearing and will include both audio and visual components. The presentation will be posted online by Tuesday, Oct. 6, 2026.

If you do not have internet access, you may call the Project Consultant at 210-349-3273 between the hours of 8 a.m. and 5 p.m., Monday through Friday, to ask questions and access project materials during the project development process.

Purpose The purpose of the proposed US 281 South Comal project is to relieve traffic congestion, improve mobility and enhance safety on US 281 within the project limits.
Description

TxDOT proposes to convert US 281 from East Borgfeld Drive to SH 46 from an existing four-lane divided roadway to a six-lane divided freeway with new HOV lanes, controlled access via entrance and exit ramps, one-way frontage roads, grade separations, operational improvements at intersections, drainage accommodations and 10-foot shared-use paths. The existing right-of-way width ranges from approximately 225 to 315 feet. The proposed project would require the acquisition of approximately 104.5 acres of new right of way and 2.9 acres of permanent easements, resulting in a proposed right-of-way width ranging from approximately 238 to 460 feet. The proposed project limits extend approximately 6.7 miles along US 281.

The proposed project would, subject to final design considerations, require additional right of way and potentially displace nine businesses. Relocation assistance is available for displaced persons and businesses. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for right-of-way acquisition and construction, can be obtained by calling the Project Consultant at 210-349-3273.

The proposed project is anticipated to impact one property protected under Section 4(f) of the Department of Transportation Act of 1966: the Uecker-Hitzfelder Ranch, located at 3715 FM 1863. The Uecker-Hitzfelder Ranch is recommended eligible for listing in the National Register of Historic Places. The proposed project would require approximately 1.99 acres of right of way from the 39.4-acre property. The proposed right-of-way acquisition would reduce a portion of the field/pasture zone; however, the domestic and agricultural zones containing the buildings and structures would remain intact. The Uecker-Hitzfelder Cemetery would also remain intact. TxDOT anticipates making a de minimis impact determination for this use under Section 4(f) of the Department of Transportation Act of 1966.

The proposed project would involve work within a floodplain. In addition, the project would occur within the Edwards Aquifer recharge and contributing zones.

The draft EA, any maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday from 8 a.m. and 5 p.m. at the TxDOT San Antonio District Office, located at 4615 NW Loop 410, San Antonio, Texas 78229; for an appointment, please call the Project Consultant at 210-349-3273. Meeting materials will also be available in hard copy form for review at the public hearing.

Accessibility The public hearing with a virtual option will be conducted in English. If you need an interpreter or document translator because English is not your primary language, or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you are a person who requires an accommodation to attend and participate in the public hearing or virtual option, please contact the Project Consultant at 210-349-3273 no later than 4 p.m. CT, Thursday, Oct. 1, 2026. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.
Meeting materials
How to make a comment

Comments from the public regarding the proposed project are requested and may be submitted either in writing or verbally at the open house or by:

  • Mail:
    TxDOT US 281 South Comal Project Team
    c/o Poznecki-Camarillo, LLC
    4801 Northwest Loop 410
    Ste. 108
    San Antonio, TX 78229
  • Email: as shown in the notice
  • Voicemail: 210-319-4938

All comments must be received on or before Wednesday, Oct. 21, 2026. Responses to written comments received and public testimony provided will be available online once they have been prepared.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT.

Posted: Aug. 27, 2026