US 271 from Loop 286 to SH 37
In-person public meeting with virtual option
Virtual: Tuesday, Nov. 15, 2022 at 5 p.m. through Friday, Dec. 2, 2022 at 11:59 p.m.
In-person: Tuesday, Nov. 15, 2022, 5 to 7 p.m.
Public comment deadline | All comments must be received on or before Friday, December 2, 2022. |
Virtual details | The virtual public meeting will be posted below beginning Tuesday, November 15, 2022 at 5 p.m., and will remain online through Friday, December 2, 2022 at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience. Additionally, TxDOT is providing an in-person meeting for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting. |
In-person details | Tuesday, November 15, 2022 5-7 p.m. Prairiland High School Cafeteria 466 FM 196 S Pattonville, TX 75468 |
Purpose | TxDOT Paris District is proposing to improve US 271 from Loop 286 to SH 37 in Lamar and Red River counties, Texas. |
Description | The proposed improvements to US 271 include the following:
|
Accessibility | TxDOT makes every reasonable effort to accommodate the needs of the public. The virtual public meeting will be presented in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you need interpretation or translation services, or you are a person with a disability who requires an accommodation to participate in the meetings, please contact 903-737-9282 no later than Thursday, November 10, 2022. Advance notice is required as services and accommodations require time to arrange. |
Meeting materials |
Schematics
|
How to make a comment | Comments must be postmarked or otherwise received by Friday, December 2, 2022.
|
Memorandum of Understanding | The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT. |
Posted: Oct. 27, 2022