FM 835 Bridge Replacement Project
Skip to main content

FM 835 Bridge Replacement Project

Virtual public meeting with in-person option

Virtual: Thursday, Jan. 22, 2026, at 5 p.m. through Friday, Feb. 6, 2026, at 11:59 p.m. CT

In-person: Thursday, Jan. 22, 2026, from 5:30 p.m. to 7 p.m. CT

Public comment deadline Comments must be received or postmarked by Friday, Feb. 6, 2026, to be part of the official public meeting record.
Virtual details

The virtual public meeting will be available on this page by 5 p.m. CT on Thursday, Jan. 22, 2026. The virtual public meeting will consist of a pre-recorded video presentation and will include both audio and visual components. The presentation, materials and exhibits available here are the same as those presented at the in-person option.

Please note that the presentation will not be available on the website until the date and time listed above. If you do not have internet access, you may leave a voicemail for the TxDOT Projects Team at 806-748-4450 to ask questions and request access to project materials.

In-person details

Thursday, Jan. 22, 2026
5:30 to 7 p.m. CT

TxDOT Lubbock District Office
Mesquite Training Center
135 Slaton Rd.
Lubbock, TX 79404

The in-person option will be held in an presentation-first format where attendees will be able to hear a presentation then view meeting materials and ask staff questions at the conclusion of presentation. Both virtual and in-person meeting materials will be the same.

Purpose The purpose of the public meeting is to share detour and project information as well as gather public input on the proposed improvements to the intersection of FM 835 and Olive Street. 
Description

The proposed FM 835 bridge replacement project crosses the North Fork Double Mountain Fork Brazos River. The improvements consist of replacing the bridge structure and improving the intersection of Olive Street at FM 835.

The proposed project, subject to final design considerations, does not require right-of-way acquisitions or displacements.

Accessibility

TxDOT makes every reasonable effort to accommodate the needs of the public. The public meeting will be presented in English. If you have a special communication accommodation or need for an interpreter, a request can be made. If you have a disability and need assistance, special arrangements can also be made to accommodate most needs. Please contact the TxDOT Lubbock District Public Information Officer at 806-748-4472, no later than 4 p.m. CT, Monday, Jan. 19, 2026. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange. 

La reunion publica se llevara a cabo en ingles. Si usted necesita un interprete o un traductor de documentos porque su idioma principal no es el ingles o tiene alguna dificultad para comunicarse eficazmente en ingles, se le proporcionara uno. Si usted tiene alguna discapacidad y necesita ayuda, se pueden hacer arreglos especiales para atender la mayoría de las necesidades. Si necesita servicios de interpretación o traducción, o si es una persona con discapacidad que requiere adaptaciones para asistir y participar en la reunión pública, comuníquese con el Equipo de Proyectos de TxDOT dejando un mensaje de voz al 806-748-4450 a más tardar a las 4 p.m. (hora central) del lunes 19 de enero de 2026. Tenga en cuenta que se requiere aviso previo, ya que algunos servicios y adaptaciones pueden requerir tiempo para que el Departamento de Transporte de Texas los organice.

Meeting Materials
How to make a comment

For both the virtual public meeting and the in-person option, the public may provide comments in the following ways:

  • Mail:
    TxDOT Lubbock District Office
    c/o Environmental
    135 Slaton Rd.
    Lubbock, TX 79404
  • Email: LBB_PROJECTS@txdot.gov please include "FM 835 Bridge Replacement" in the subject line
  • Voicemail: 806-748-4450 – please include your name, address and comment

Comments must be received or postmarked by Friday, Feb. 6, 2026, to be part of the official public meeting record.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT.

Posted: Dec. 1, 2025