36A North Project
I-10 to US 290
Virtual public scoping meeting with in-person open houses
Virtual: Tuesday, July 14, 2026, by 5 p.m. CT
In-person open houses: Tuesday, July 14, and Thursday, July 16, 2026, from 5 to 7 p.m. CT
| Public comment deadline | All comments must be received or postmarked by Friday, July 31, 2026, to be included in the official public hearing doucmentation. |
| Virtual details | The virtual public scoping meeting will be available starting on Tuesday, July 14, 2026, by 5 p.m. The virtual public scoping meeting will consist of a pre-recorded video presentation and will include both audio and visual components. Please note that the presentation will not be available on the website until the time and date listed above. If you do not have internet access, you may call 713-802-5199 between the hours of 8 a.m. to 5 p.m., Monday through Friday, to ask questions and access project materials during the project development process. Formal comments may be provided by mail or email as explained below. |
| In-person details | Additionally, TxDOT is providing in-person open house options for individuals who would like to participate in person. In-person attendees will be able to view the same pre-recorded presentation as posted online, review hard copies of project materials, ask questions, and submit written comments in any language. The in-person open house public scoping meetings will be held on: Tuesday, July 14, 2026 Thursday, July 16, 2026 |
| Purpose | The purpose of the proposed 36A North Project is to improve north-south mobility between I-10 and US 290 within the study area. |
| Description | At this public scoping meeting, members of the public will view the range of alternatives, which includes multiple preliminary alignment alternatives within a study area that is approximately 20 to 25 miles in length from I-10 to US 290. The study area boundaries generally coincide with the Waller County jurisdictional boundaries, while avoiding the primary land holdings of the Coastal Prairie Conservancy to the greatest extent practicable. It is anticipated that all preliminary alignment alternatives would require right-of-way acquisition. The project is in the early stages of development, and a preferred alternative has not been selected. The project team seeks input on the alternatives as well as any potential environmental constraints, anticipated permits or other authorizations, and any significant issues that should be analyzed in depth in the Environmental Impact Statement (EIS). The public scoping meeting will also provide an opportunity for the public to review and comment on draft procedural documents that will provide the foundation for the EIS, such as the Draft Coordination Plan and Schedule, Draft Purpose and Need, and Draft Methodologies and Level of Detail for Analyzing Alternatives. The project team seeks feedback on any resources that may occur within the study area that are protected under Section 4(f) of the Department of Transportation Act of 1966. The project team will avoid and minimize impacts to these properties as much as possible. The proposed project could involve construction in wetlands and actions in a floodplain. Potential impacts will be determined as the project development process progresses. Any environmental documentation or studies, any maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for review by appointment Monday through Friday between the hours of 8 a.m. and 5 p.m. Please contact the TxDOT Public Engagement Coordinator, at 713-802-5199 or by email as shown in the notice. |
| Accessibility | The public scoping meetings will be conducted in English and Spanish. If you need an interpreter or document translator because English or Spanish is not your primary language or have difficulty communicating effectively in English or Spanish, one will be provided to you free of charge. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the public scoping meetings, please contact the TxDOT Public Engagement Coordinator, at 713-802-5199 or by email as shown in the notice no later than 4 p.m., Thursday, July 9, 2026. Please be aware that advance notice is required as some services and accommodations may require time for the project team to arrange. English: Please call 713-802-5199 to request special accommodations or if you have need for interpretation/translation. Español (Spanish): Llame al 713-802-5199 para solicitar adaptaciones especiales o si usted necesita interpretación o traducción. 中文 (繁体) (Mandarin [traditional Chinese]): 如出席和参与会议需要特殊照顧或需要口譯/筆譯,請撥打 713-802-5199. 中文 (简体) (Mandarin [simplified Chinese]): 如出席和参与会议需要特殊照顾或需要口译/翻译,请拨打 713-802-5199. Kiswahili (Swahili): Tafadhali piga simu namba 713-802-5199 ili kuomba urekebishaji maalum au ikiwa unahitaji ukalimani au tafsiri. Tiếng Việt (Vietnamese): Xin hãy gọi 713-802-5199 nếu bạn cần sự hỗ trợ đặc biệt hoặc người phiên dịch. Kreyòl ayisyen (Haitian Creole): Tanpri rele 713-802-5199 pou mande aranjman espesyal oubyen si ou bezwen entèprèt oubyen tradiktè. |
| Meeting materials | |
| How to make a comment | Written comments from the public regarding the proposed project are requested and may be submitted in any language by:
All comments must be received or postmarked by July 31, 2026. |
| Memorandum of understanding | The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT. |
Posted: June 26, 2026