US 377 in Hood County
Skip to main content

US 377 in Hood County

Virtual public meeting with in-person option

Virtual: Thursday, Nov. 17, 2022 at 6 p.m. through Wednesday, Dec. 7, 2022 at 11:59 p.m.

In-person: Thursday, Nov. 17, 2022 6 to 8 p.m.

Virtual Public Meeting Presentations

Public comment deadline

All comments must be received on or before Wednesday, December 7, 2022. 

Virtual details

The virtual public meeting will be posted below beginning Thursday, Nov. 17, 2022 at 6 p.m., and will remain online through Wednesday, Dec. 7, 2022 at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person meeting for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public meeting.

In-person details Thursday, Nov. 17, 2022
6-8 p.m.
Lake Granbury Conference Center
621 E. Pearl St.
Granbury, TX 76048
Purpose

TxDOT Fort Worth District is proposing improvements to US 377 from Holmes Drive to 3,000 feet north of FM 167 (Fall Creek Highway), a distance of approximately 9 miles, in the City of Granbury, Hood County, Texas.

Description

US 377 between Holmes Drive and SH 144 would be converted from a rural highway to a four-lane urban highway with a raised median, enclosed drainage and curbs where appropriate. The proposed project would:

  • Reconstruct and widen US 377, from SH 144 to north of FM 167 (Fall Creek Highway), from a four-lane divided highway to a six-lane divided highway with a raised, concrete-paved or vegetated median
  • Include improvements are also proposed along SH 144 from Autumn Ridge Road to FM 51 (Paluxy Road) (CSJ 0080-03-049), a distance of approximately 0.4 mile
  • Include improvements to cross street intersections, ramps and driveway connections
  • Add shared-use paths in each direction to accommodate bicyclists and pedestrians, signalization, and drainage improvements

The proposed project would, subject to final design considerations, require approximately 26 acres of additional right of way (ROW) and 3.4 acres of permanent drainage easements. The proposed project would potentially displace eight commercial structures and three other non-commercial/non- residential structures, including one historical marker. The project has the potential to be constructed in phases, with the SH 144 from Autumn Ridge Road to FM 51 (Paluxy Road) improvements being completed during the first phase of construction.

Accessibility The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact Jillian North at 817-370-6817, no later than 4 p.m. CT, Monday, November 14, 2022. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials

Schematics

How to make a comment

Comments must be postmarked or otherwise received by Wednesday, Dec. 7, 2022.

  • Mail:
    TxDOT Fort Worth District Office
    Attn: Dr. Francis A. Smith, P.E.
    2501 SW Loop 820
    Fort Worth, TX 76133
  • Email: as described in the notice.
Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.