US 377 in Hood County
Virtual public meeting
Virtual: Tuesday, May 4, 2021, by 6 p.m.
Public comment deadline | All comments must be received on or before Wednesday, May 19, 2021. |
When | Tuesday, May 4, 2021 The pre-recorded presentation video will be available for comment by 6 p.m. |
Where | The pre-recorded presentations will be available beginning Tuesday, May 4, 2021, at 6 p.m. and it will be available for comment until Wednesday, May 19, 2021, at 11:59 p.m. |
Purpose | TxDOT Fort Worth District is proposing improvements to US 377 from Holmes Drive to 3,000 feet north of FM 167 (Fall Creek Highway), a distance of approximately nine miles, and SH 144 from Autumn Ridge Road to FM 51 (Paluxy Road), a distance of approximately 0.4 miles, in the city of Granbury, Hood County, Texas. All comments must be received on or before Wednesday, May 19, 2021. |
Description | The proposed project design would reconstruct and widen US 377 from a four-lane divided highway to a six-lane divided highway with a raised, concrete median. The project would plan for adding capacity to US 377 from Holmes Drive to 3,000 feet north of FM 167, and would improve cross street interchanges, ramps and driveway connections. The proposed project also includes the addition of shared-use paths in each direction for bicycle and pedestrian accommodations, and drainage improvements along the corridor. A breakout project for early implementation would include improvements to the US 377/SH 144 interchange from FM 51 to the north end of the Brazos River Bridge, and SH 144 from Autumn Ridge Road to FM 51. The proposed project would, subject to final design considerations, require additional right-of-way and potentially displace residences and non-residential structures. |
Accessibility | The virtual public meeting will be conducted in English and Spanish. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting, please contact Jillian North at 817-370-6817 no later than 4 p.m. Thursday, April 29, 2021. Please be aware that advance notice is requested as some accommodations may require time for TxDOT to arrange. |
Meeting materials | |
Memorandum of Understanding | The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT. |
Posted: April 14, 2021