RM 2871 Tarrant County
Skip to main content

RM 2871 Tarrant County

Virtual public hearing with in-person option

Virtual public hearing: from Thursday, December 7, 2023, at 8 a.m. to December 22, 2023, at 11:59 p.m.

In-person option: Thursday, December 7, 2023, from 5 - 7 p.m.

Virtual public hearing presentations

Public comment deadline Comments must be received on or before Friday, Dec. 22, 2023, to be a part of the official hearing record.
Virtual details

The hearing presentation will be available online beginning on Thursday, Dec. 7, 2023 by 8 a.m. on this webpage. The virtual hearing will consist of a pre-recorded video presentation and will include both audio and visual components.

If you do not have internet access, you may call 817-370-3519 between the hours of 8 a.m. and 5 p.m., Monday through Friday, to ask questions and access project materials during the project development process.

In-person details

Thursday, Dec. 7, 2023,
5 - 7 p.m.
High Ridge Church
10100 Rolling Hills Drive,
Fort Worth, TX 76126

In-person attendees will be able to view the same presentation delivered in the online public hearing which will be playing on a screen, review hard copies of project materials, ask questions of TxDOT staff and/or consultants, and leave written comments. No presentation will be held.

Purpose The Texas Department of Transportation Fort Worth District is proposing to reconstruct and widen RM 2871 from I-30 to US 377 in Tarrant County, Texas.
Description

The proposed improvements to RM 2871 include reconstructing and widening the existing roadway to a four-lane divided urban roadway with a six-foot to 18-foot wide curbed median from US 377 in the City of Benbrook north to I-30 in the City of Fort Worth for approximately 5.08 miles along RM 2871.

Additional proposed improvements include:

  • An overpass bridge on RM 2871 over the Union Pacific Railroad (UPRR) and Aledo Road
  • Realignment of Veale Road Parkway and Chaparral Pass
  • Left and right turn bays and intersection improvements throughout the corridor
  • Bicycle and pedestrian accommodations on both sides of RM 2871. The proposed project would enhance safety and mobility

The project would require approximately 10.27 acres of additional right of way. The proposed project would, subject to final design considerations, require additional right of way and potentially displace one non-residential structure; no residential displacements are anticipated.

Accessibility The in-person public hearing option will be conducted in English. If you need an interpreter because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the in-person public hearing option, please call (817) 370-3519 no later than 4 p.m. CT on December 4, 2023. Please be aware that advance notice is required as some services and accommodations may require time for the Texas Department of Transportation to arrange.
Hearing materials

Environmental documents

Schematics

How to make a comment

Comments from the public regarding the proposed project are requested and may be submitted by any of the methods listed below.

  • Email as shown in the notice
  • Mail:
    TxDOT Fort Worth District Office
    2501 SW Loop 820
    Fort Worth, Texas 76133

All comments must be received on or before Friday, Dec. 22, 2023. Responses to comments received will be available on this webpage once they have been prepared.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated December 9, 2019, and executed by FHWA and TxDOT.