FM 982 Project from US 380 to FM 546
Virtual Public Meeting with In-Person Option
Virtual: Available from Tuesday, Dec. 9, 2025, at 5 p.m. to Tuesday, Dec. 30, 2025
In-person: Tuesday, Dec. 9, 2025, from 5 to 7 p.m.
| Public comment deadline | Comments must be received on or before Tuesday, Dec. 30, 2025. |
| Virtual details | The virtual public meeting will consist of a pre-recorded video presentation and will include both audio and visual components. The presentation will be posted online by Tuesday, Dec. 9, 2025, at 5 p.m., and will remain online until Tuesday, Dec. 30, 2025. |
| In-person details | Tuesday, Dec. 9, 2025 5 - 7 p.m. Longhorn 2020 Event Center 3670 FM 982, Princeton, TX 75407 |
| Purpose | The purpose of the meeting is to gather public input and provide information about the proposed improvements to widen FM 982 from US 380 to FM 546 in Collin County, Texas. |
| Description | The proposed project would widen the FM 982 roadway to a four-lane divided roadway. A 10-foot-wide shared-use path would be constructed on both sides of the roadway. However, between US 380 and CR 400 (Myrick Lane)/FM 452, a six-foot-wide sidewalk would be constructed on the southbound side of the roadway, which would transition to a shared-use path. Proposed drainage would consist of curb and gutter throughout the project limits. The proposed right-of-way (ROW) width varies throughout the project limits but is typically 120 feet. The proposed project would, subject to final design considerations, require additional right of way and potentially displace one residential structure. Relocation assistance is available for displaced persons and businesses. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for right-of-way acquisition and construction, can be obtained from the TxDOT district office by calling 214-320-6675. The proposed project may involve construction in wetlands and would involve an action in a floodplain. |
| Accessibility | The virtual public meeting and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public meeting or in-person option, please contact the TxDOT Public Information Office, at 214-320-4480 no later than 4 p.m., Thursday, Dec. 4, 2025. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange. La reunión pública para FM 982 desde US 380 hasta FM 546 se llevará a cabo en inglés. Si necesita un intérprete o traductor de documentos porque su idioma principal no es el inglés o tiene dificultades para comunicarse eficazmente en inglés, se le proporcionará uno. Si tiene una discapacidad y necesita ayuda, se pueden hacer arreglos especiales para satisfacer la mayoría de las necesidades. Si requiere servicios de interpretación o traducción o es una persona con una discapacidad que requiere una adaptación para asistir y participar en la reunión pública de FM 982 desde US 380 hasta FM 546, comuníquese con la Oficina de Información Pública de TxDOT, al número 214-320-4480, a más tardar a las 4:00 p.m. hora central, antes del martes 4 de diciembre de 2025. Tenga en cuenta que se requiere aviso previo ya que algunos servicios y adaptaciones pueden requerir tiempo para que TxDOT los organice. |
| Meeting materials | |
| How to make a comment | Comments from the public regarding the proposed project are requested and may be submitted by:
Comments must be received on or before Tuesday, Dec. 30, 2025. |
| Memorandum of Understanding | The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT. |
Posted: Nov. 24, 2025