US 380 Farmersville from CR 560 to CR 699 (Hunt County line)
Skip to main content

US 380 Farmersville from CR 560 to CR 699 (Hunt County line)

Meeting Postponed. Notice of environmental assessment available for review and virtual public hearing with in-person option

Virtual: Thursday, March 23, 2023, at 5:30 p.m. through Friday, April 7, 2023, at 11:59 p.m.

In-person: The US 380 Farmersville in-person public hearing planned for March 2, 2023, will be postponed due to severe weather concerns. A new date for the in-person hearing will be announced shortly

The US 380 Farmersville in-person public hearing planned for March 2, 2023, will be postponed due to severe weather concerns. A new date for the in-person hearing will be announced shortly. The online public hearing will still be available beginning at 5:30 p.m. on March 2, 2023.

Public comment deadline

Comments must be received on or before Friday, March 17, 2023, to be part of the public hearing record.

Virtual details

The virtual public hearing will be posted here on Thursday, March 2, 2023, at 5:30 p.m. through Friday, March 17, 2023, at 11:59 p.m. Please note, this is not a live event. The materials can be viewed at your convenience.

Additionally, TxDOT is providing an in-person hearing option for individuals who would like to participate in person instead of online. In-person attendees will be able to review the same materials and presentation as the online public hearing.

In-person details

POSTPONED DUE TO SEVERE WEATHER CONCERNS

Thursday, March 2, 2023
5:30 - 7:30 p.m.
Farmersville Campus of Collin College
501 S. Collin Parkway
Farmersville, TX 75442

Purpose

TxDOT Dallas District proposed the new location realignment of the existing US 380 roadway from CR 560 to CR 699 (Hunt County Line) south of the City of Farmersville, in Collin County, Texas.

Description

The proposed project would realign US 380 from CR 560 to CR 699 (Hunt County Line), on new location a distance of approximately 7.6 miles. The existing US 380 roadway would remain. The proposed new location realignment facility would be constructed as a six-lane divided roadway (three lanes in each direction separated by a median). The proposed project would also include continuous, two to three lane one-way frontage roads with bicycle and pedestrian shared-use paths on both sides of the roadway. The proposed project would be constructed within a proposed ROW of approximately 270- to 542 feet wide.

The proposed project would, subject to final design considerations, require additional ROW and potentially displace three residences and five non-residential structures.

Accessibility The virtual public hearing and in-person option will be conducted in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to attend and participate in the virtual public hearing or in-person option, please contact Madison Schein, TxDOT Dallas District Public Information Officer at (214) 320-4483 no later than 4 p.m. Thursday, February 23, 2023. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials
How to make a comment

Comments must be postmarked or otherwise received by Friday, March 17, 2023 to: TxDOT Dallas District Office, 4777 East US Highway 80, Mesquite, Texas 75150-6643; by email as described in the notice.

Memorandum of Understanding The environmental review, consultation, and other actions required by applicable Federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated Dec. 9, 2019, and executed by the Federal Highway Administration and TxDOT.

Posted: Feb. 10, 2023