US 59 Upgrade to Interstate Standards in Live Oak and Bee Counties
Skip to main content

US 59 Upgrade to Interstate Standards in Live Oak and Bee Counties

Virtual public meeting with in-person option

Virtual: Thursday, July 23, by 4:30 p.m. through Friday, Aug. 7, 2026 at 11:59 p.m.

In-person: Thursday, July 23, 2026, from 4:30 to 6:30 p.m.

Meeting details

Public comment deadline Comments must be postmarked or otherwise received by Friday, Aug. 7, 2026.
Virtual  details

 The virtual public meeting will consist of a pre-recorded video presentation and will include both audio and visual components. The presentation, materials and exhibits presented online will be the same as those presented at the in-person option.

Please note that the virtual public meeting will be available on this page at the date and time indicated above and will remain online for at least 15 days. If you do not have internet access, you may call 361-808-2544 between 8 a.m. and 5 p.m., Monday through Friday, to ask questions or access project materials.

In-person details The in-person option will be held in an open house format. Attendees are welcome to come and go at their convenience and view the same presentation provided in the virtual public meeting, review hard copies of project materials, ask questions of TxDOT staff and/or consultants, and leave written comments. There will not be a live presentation at the in-person event. 
Purpose TxDOT’s Corpus Christi District is hosting a public meeting to share information regarding proposed US 59 upgrades to interstate standards in Live Oak and Bee Counties.
Description

This US 59 Project spans approximately 16 miles and is intended to improve local and regional mobility for current and future traffic needs, provide safety improvements, and enhance the state highway system by upgrading the roadway to meet interstate standards as part of the future I-69 corridor.

Proposed project improvements from north of I-37 to CR 303 (Viggo Road) would include upgrading the existing two-lane roadway to a four-lane freeway with mainlanes and frontage roads. From CR 303 to FM 351 in Beeville, improvements would include an additional travel lane in each direction, turn lanes, shoulders and sidewalks.The proposed project would require additional right of way and potential displacements, pending further detailed design considerations. Relocation assistance is available for displaced persons and businesses. Information about the TxDOT Relocation Assistance Program and services and benefits for those displaced and other affected property owners, as well as information about the tentative schedule for right-of-way acquisition and construction, can be obtained from the TxDOT district office by calling 361-808-2509. The virtual public meeting and in-person option will be conducted in English, with Spanish materials available online and in-person. If you need an interpreter or document translator because English is not your primary language or have difficulty communicating in English, one will be provided to you. If you have a disability and need assistance, arrangements can be made to accommodate most needs. Call Rickey Dailey at 361-808-2544 no later than 4 p.m. CT, Monday, July 20, 2026, to request special accommodations. Every reasonable effort will be made to accommodate these needs. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.

The project is anticipated to be completed in phases. The section from north of I-37 to CR 303 would initially be constructed as a divided highway with two travel lanes in each direction separated by a wide center median.

 

Accessibility The virtual public meeting and in-person option will be conducted in English, with Spanish materials available online and in person. If you need an interpreter or document translator because English is not your primary language or have difficulty communicating in English, one will be provided to you. If you have a disability and need assistance, arrangements can be made to accommodate most needs. Call Rickey Dailey at 361-808-2544 no later than 4 p.m. CT, Monday, July 20, 2026, to request special accommodations. Every reasonable effort will be made to accommodate these needs. Please be aware that advance notice is required as some services and accommodations may require time for TxDOT to arrange.
Meeting materials
  • Notice
How to make a comment

Written comments from the public regarding the Corpus Christi District Rural TIP revision are requested and may be submitted in the following ways:

  • Mail: TxDOT Corpus Christi District
    Attn: US 59 Live Oak/Bee
    1701 S. Padre Island Dr.
    Corpus Christi, TX 78416
  • Email: as shown in the notice, Subject: US 59 Live Oak/Bee

Comments must be postmarked or otherwise received by Friday, Aug. 7, 2026.

Posted: June 10, 2026