E. Pecan Street Widening Project
Skip to main content

E. Pecan Street Widening Project

From Sun Light Near Way to East of Weiss Lane

Notice and Opportunity to Comment

NOC details

Public comment deadlineAll comments must be received on or before Monday, Oct. 19, 2026.
PurposeThe Texas Department of Transportation (TxDOT) and the City of Pflugerville are proposing to widen E. Pecan Street from Sun Light Near Way to East of Weiss Lane in Travis County, Texas. This notice is affording an opportunity to comment as part of the environmental review process for this project. If you are a property owner, you are receiving this notice because records indicate that you own property that (1) would be acquired (in part) for this project, or (2) is adjacent to the project. This notice and opportunity to comment is also being provided to affected local governments and public officials.
Description

Throughout the project limits, the existing roadway is currently a four-lane undivided roadway west of SH 130, a two-lane divided roadway with no shoulders east of SH 130, and a two-lane undivided road east of Weiss Lane. The preliminary plans would:

  • Widen E. Pecan Street to a six-lane roadway with three lanes in each direction and a raised median from Sun Light Near Way to Weiss Lane, and a four-lane roadway with two lanes in each direction and a raised median from Weiss Lane to 1,000 feet east of Weiss Lane
  • Widen the bridge over SH 130
  • Connect segments of sidewalk along the roadway
  • Add a shared-use path on the North side of the roadway
  • Improve the intersections at SH 130, Livano and Weiss Lane

Although additional right of way would be required, no residential or non-residential structures are anticipated to be displaced at this time. Information concerning services and benefits available to affected property owners and information about the tentative schedule for right-of-way acquisition and construction can be obtained from the City of Pflugerville by calling 512-990-6400. 

Any environmental documentation or studies, maps and drawings showing the project location and design, tentative construction schedules, and other information regarding the proposed project are on file and available for inspection Monday through Friday between the hours of 8 a.m. and 5 p.m. at the City of Pflugerville, 15500 Sun Light Near Way #B, Pflugerville, TX 78660, (512) 990-6400. Project materials are also available online at https://city-pflugerville-tx-projects.cleargov.com/18797/tr2106-east-pecan-street.

Accessibility

The project materials are written in English. If you need an interpreter or document translator because English is not your primary language or you have difficulty communicating effectively in English, one will be provided to you. If you have a disability and need assistance, special arrangements can be made to accommodate most needs. If you need interpretation or translation services or you are a person with a disability who requires an accommodation to review the project materials or submit information, please contact Brad Lammi with the City of Pflugerville, at 512-990-6400 no later than 4 p.m. CT, at least three business days before the date on which you would like to review the project materials or submit information. Please be aware that advance notice is required as some services and accommodations may require time for the City of Pflugerville to arrange.

Los materiales del proyecto están escritos en inglés. Si usted necesita un intérprete o un traductor de documentos porque su idioma principal no es el inglés o tiene alguna dificultad para comunicarse eficazmente en inglés, se le proporcionará uno. Si usted tiene alguna discapacidad y necesita ayuda, se pueden hacer arreglos especiales para atender la mayoría de las necesidades. Si usted necesita servicios de interpretación o traducción o es una persona con alguna discapacidad que requiera una adaptación para revisar los materiales o enviar información, por favor póngase en contacto con Brad Lammi con La ciudad de Pflugerville, al número 512-990-6400 a más tardar a las 4 p.m. hora central, al menos tres días hábiles antes de la fecha en la que desea revisar los materiales del proyecto o enviar información. Por favor sepa que es necesario dar aviso con anticipación, ya que algunos servicios y adaptaciones pueden requerir tiempo para que Departamento de Transporte de Texas (TxDOT) los organice.

Meeting  materials
How to make a comment

Written comments from the public regarding the proposed project are requested and may be submitted by any of the following methods:

All comments must be received or postmarked by Monday, Oct. 19, 2026. 

Memorandum of UnderstandingThe environmental review, consultation and other actions required by applicable federal environmental laws for this project are being, or have been, carried-out by TxDOT pursuant to 23 U.S.C. 327 and a Memorandum of Understanding dated July 17, 2025, and executed by FHWA and TxDOT.

Posted: Sept. 29, 2026