This project is dedicated to improving safety and mobility from south of Spradley Street on US 59 to the intersection of SH 7 West and State Loop 224.
Due to increasing traffic, congestion and a high number of traffic accidents, this project was one of three identified near term improvements needed in Nacogdoches County according to the US 59 Corridor Master Plan Study. "Near term” improvements would improve safety under present and projected traffic loads until the long-term solution, proposed I-69, is constructed.
In 2011, TxDOT received a Finding of No Significant Impact (FONSI) from the Federal Highway Administration (FHWA) issuing clearance of the environmental document and final approval of the schematic. Due to budgetary constraints, the project will be constructed in two phases:
Phase I
This phase was completed in Spring 2017, and included the following:
Phase II
This phase focuses on eliminating traffic conflicts between through traffic and local traffic in this high density commercial area with the following improvements:
Phase II Next Steps
In 2013, the I-69 Angelina and Nacogdoches Counties Committee identified US 59/State Loop 224 South Interchange as a number one priority area for I-69 development in Nacogdoches County.
Get Involved
Downloads
Contact Us
I-69 Project Manager
TxDOT Lufkin District
1805 N. Timberland Drive
Lufkin, TX 75901
(936) 633-4469
Email
Copyright 2020
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701