TxDOT is initiating this study to identify improvements to SH 249 in Harris County, from BW 8 to I-45 North. The purpose of the study is to enhance mobility and operational efficiency; accommodate current and future traffic demands; and to improve safety at intersections.
Current Conditions
Currently, SH 249 has three travel lanes in each direction with a turn lane in the median.
Proposed Improvements
Proposed alternative improvements include the following:
The build alternatives would also include pedestrian and bicycle accommodations in accordance with The Americans with Disabilities Act requirements. The proposed project would require additional right of way, resulting in potential displacements.
Next Steps
Get Involved
Downloads
Contact Us
Please reference this project number: 0720-03-131
TxDOT Houston District
(713) 802-5076
Copyright 2017
•
Texas Department of Transportation
•
All Rights Reserved
•
Disclaimer
•
Privacy & Security Policy
•
Accessibility
125 East 11th Street
•
Austin, Texas 78701