Crabb River Road
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


TxDOT is in process of widening 2.9 miles of Crabb River Road, also FM 2759 and FM 762, from approximately 0.25 miles south of Sansbury Boulevard to 500 feet south of the Lamar Consolidated Independent School District Complex in Fort Bend County.

Current Conditions

The current road is a two-lane, open-ditch, asphalt roadway.

Planned Construction Improvements

  • Phase I - Widen the existing Crabb River Road (FM 762/FM 2759) to four lanes with a divided raised median
  • Phase II - Construct a grade separation (overpass) over the BNSF Railroad and Thompsons Road (FM 762/FM 2759)

Partners

This project is in partnership between Fort Bend County, TxDOT and the Federal Highway Administration.

Get Involved

Downloads

Contact Us

TxDOT  Fort Bend Area Office
(281) 238-7900
Email

 

Copyright 2021  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701