SH 124 Project - Hillebrandt Bayou Bridge
Skip to main content
Texas Department of Transportation
Connecting You With Texas
  • Family
  • Jobs
  • Education
  • Opportunities
  • Attractions
  • Entertainment
  • Wide Open Spaces
  • History
  • Quality of Life
  • Sports
  • Parks
  • Shopping
  • Services
  • People
  • Wildflowers
  • BBQ
  • Shores
  • Schools
  • Rodeos
  • Music
  • Tacos
  • Adventure
  • Trails
  • Traditions
  • Safely
  • Sunsets
  • Culture
  • Festivals
  • Friends
  • Life
  • Possibilities
  • Legends

 


Construction Project Overview

TxDOT is moving forward with the removal and replacement of the Hillebrandt Bayou bridge on SH 124. The bridge replacement project runs parallel to I-10 near Walden Road in Beaumont, Jefferson County. The project was originally scheduled to start in August 2021, but will now move to late Fall 2021 and will last until approximately Fall 2022, pending weather or unforeseen delays. To reduce the construction process and time, the project will require a complete closure of SH 124. During the closure, there will be an approximate eight-mile detour using TxDOT roadways. Detour maps are featured below showing local connectivity options to reduce travel time. 

Project Update (As of 8/4/21):

We’ve appreciated the feedback we’ve received from the public concerning this project. We understand there are many ongoing projects throughout the area, and we understand construction is an inconvenience and frustrating. Unfortunately, the Hillebrandt Bayou Bridge on SH 124 has reached its life expectancy and must be replaced.

Based on public input, we’re now moving this project start time from August to late Fall 2022. We will work diligently to mitigate any issues or congestion due to the closure as much as possible so that we can complete by Fall 2022.

Project Benefits

The proposed project is anticipated to improve safety by bringing the bridge up to current design standards.

Project Improvements

The project is approximately a tenth of a mile in length and includes:

  • Replacing the Hillebrandt Bayou bridge with a similar design
  • Adding modern railings
  • Adding sidewalks on the westbound side (north upstream) 

This construction will require a complete closure of the Hillebrandt Bayou bridge. Detour maps are featured below.

Next Steps

  • Project Construction Begins Approximately: Late Fall 2021
  • Construction Completion: Fall 2022

Get Involved

Submit your online comments today and sign up for email updates by clicking on the “Subscribe to Email” button at the right-hand top of the page. The public may also check the Beaumont District Twitter page and contact the Beaumont Area Office with questions.

Downloads

Contact Us

Beaumont Area Office
SH 124 Project Manager
8450 Eastex Freeway
Beaumont, TX 77708
(409) 924-6521

Email

 

 

Copyright 2021  •  Texas Department of Transportation  •  All Rights Reserved  •  Disclaimer  •  Privacy & Security Policy  •  Accessibility
125 East 11th Street  •  Austin, Texas 78701