Before a project is built, a study must be done to determine if it will fill a transportation need, will not negatively impact the surrounding area and fits the department's overall plan. During the study phase, potential projects are analyzed to determine if they are cost-effective while also efficiently improving mobility. Some of these projects have moved beyond the study phase and are under construction.
Location | Project | Description |
---|---|---|
Roscoe | I-20 at US 84 (Roscoe Interchange) | Proposed improvements to the interchange in Nolan County to enhance safe movement, address design deficiencies and accommodate future improvements and capacity projects. |
Abilene | FM 89 (Buffalo Gap Road) Project |
This study is an examination of FM 89 to identify improvements. |
Abilene | I-20 Corridor Study |
This study is an examination of Interstate 20 as it is now by the TxDOT Abilene District. |
Tuscola | US 83/US 84 Y-Intersection | Possible improvements to the Y-Intersection at US 83/US 84 |
Abilene | US 83/US 84 | Possible improvements to six miles of US 83/US 84 from Iberis Road S. to the US 83/US 84 split |
Abilene | US 83/277 at FM 3034 Overpass | Possible improvements to US 83/277 to include an overpass at FM 3034 |