Letting Schedule for May, 2014 (FY 2014)

Last Update: Monday, November 17, 2014
May, 2014 (FY 2014) (see Links)
SEP 2013 | OCT 2013 | NOV 2013 | DEC 2013 | JAN 2014 | FEB 2014 | MAR 2014 | APR 2014 | MAY 2014 | JUN 2014 | JUL 2014 | AUG 2014
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0108-06-051 Anderson/
Tyler
SH 19 Actual $12,487,716 1 WIDEN 2 LN ROADWAY TO SUPER - 2 (3 LANE) CRITERIA
1011-02-017 Atascosa/
San Antonio
FM 541 Actual $6,730,084 1 REHABILITATE AND WIDEN EXISTING ROADWAY TO ADD SHOULDERS
0017-09-096 Bexar/
San Antonio
IH 35 Actual $748,708 10 LANDSCAPE PLANTNG AND IRRIGATION
0915-12-521 Bexar/
San Antonio
VA Actual $1,885,777 10 CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE ON FM 1957, FM 471
2230-02-004 Bexar/
San Antonio
SP 53 Actual $7,297,371 ROW EXPAND 2 LANES TO 4 LANES WITH LEFT TURN LANES, BIKE LANES
0113-03-027 Blanco/
Austin
US 290 Actual $1,347,191 1 REPLACE BRIDGE AND APPROACHES
2050-02-002 Bowie/
Atlanta
FM 3287 Actual $358,934 8 CONSTRUCT PAVED SHOULDERS
0315-05-026 Brazos/
Bryan
SH 105 Actual $23,601,410 11 REPLACE EXISTING BRIDGE FACILITY CONSISTING OF GRADING,
0914-22-056 Caldwell/
Austin
CR Actual $817,058 3 REPLACE BRIDGE & APPROACHES
0437-04-025 Callahan/
Abilene
US 283 Actual $4,270,742 1 REHAB AND WIDENING
0271-01-076 Colorado/
Yoakum
IH 10 Actual $8,740,908 1 ACP OVERLAY
0196-03-267 Dallas/
Dallas
IH 35E Actual $364,834 1 INSTALLATION OF FIBER OPTIC CABLE
0261-03-065 Dallas/
Dallas
US 67 Actual $416,695 8 INSTALL PROTECTION
0581-02-140 Dallas/
Dallas
LP 12 Actual $2,679,704 1 FULL DEPTH REPAIR, MILL AND OVERLAY
0918-00-207 Dallas/
Dallas
VA Actual $3,125,000 5 REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION
0918-00-209 Dallas/
Dallas
VA Actual $450,000 7 DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES
0918-00-210 Dallas/
Dallas
VA Actual $2,140,150 7 REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN
0918-47-084 Dallas/
Dallas
CS Actual $1,000,000 12 IMPLEMENT PROGRAM TO RECRUIT, TRAIN, & CERTIFY DISADVANTAGED
1567-02-032 Denton/
Dallas
FM 423 Actual $57,943,494 ROW SH 121 TO COUGAR ALLEY;WIDEN 4 TO 8 LN DIVIDED URBAN;COUGAR
2250-02-016 Denton/
Dallas
LP 288 Actual $3,653,118 1 FULL DEPTH CONCRETE PAVEMENT REPAIR
1697-02-019 Eastland/
Brownwood
FM 2214 Actual $5,299,578 1 REGRADE AND WIDEN EXISTING ROADWAY, FLEX BASE AND SURFACE
0924-00-094 El Paso/
El Paso
VA Actual $218,729 1 SIGN REPLACEMENT
0924-06-490 El Paso/
El Paso
CS Actual $1,176,200 3 CONSTRUCT PEDESTRIAN TRAILS, BIKE AND BUS FACILITIES WITHIN
0211-09-029 Fayette/
Yoakum
FM 155 Actual $1,540,168 6 REPLACE BRIDGE AND APPROACHES
0908-23-034 Fisher/
Abilene
CR Actual $869,322 6 REPLACE BRIDGE AND APPROACHES
0998-05-009 Freestone/
Bryan
FM 416 Actual $1,235,168 8 SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE,
0916-26-018 Goliad/
Corpus Christi
PW Actual $212,182 10 SEAL COAT ROADS, PARKING LOSTS & LEVEL UP CAMPSITE PULLOUTS
0912-00-475 Harris/
Houston
VA Actual $7,500,000 5 CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2014) (NON - LETTING)
0912-00-505 Harris/
Houston
VA Actual $3,000,000 5 DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM (YEAR 1)
0912-70-099 Harris/
Houston
VA Actual $2,767,523 10 CONSTRUCT CURB RAMPS ON IH 45, SH 249, SS 261, FM 525 AND
0912-71-459 Harris/
Houston
VA Actual $4,851,470 3 RECONSTRUCT STREET
0912-72-184 Harris/
Houston
CS Actual $3,942,249 3 CONSTRUCT HIKE AND BIKE TRAIL, BENCHES, LIGHTING AND BRIDGES
0912-72-323 Harris/
Houston
CS Actual $7,000,000 3 DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 1)
0912-72-326 Harris/
Houston
CS Actual $1,875,000 5 DESIGN AND CONSTRUCT MULTIMODAL TRANSIT CENTER / PARK & RIDE
0914-33-035 Hays/
Austin
CR Actual $576,253 6 REPLACE BRIDGE AND APPROACHES
1776-01-032 Hays/
Austin
RM 967 Actual $4,408,238 3 ADD TWO WAY LEFT TURN LANE AND SHOULDERS
0910-34-029 Henderson/
Tyler
VA Actual $169,910 11 REDUCE CROSSWALK DISTANCE BY ADDING END ISLANDS ON CORNERS
0909-37-054 Hill/
Waco
CR Actual $451,188 6 REPLACE BRIDGE AND APPROACHES
0340-01-040 Houston/
Lufkin
US 287 Actual $1,379,201 8 IMPROVE GUARDRAIL TO DESIGN STANDARDS AND SAFETY TREAT FIXED
1333-03-018 Jack/
Fort Worth
FM 1191 Actual $5,404,940 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH, PROPOSED 2 - 12'LANES
0913-18-027 Jackson/
Yoakum
CR Actual $1,084,856 6 REPLACE BRIDGE AND APPROACHES
0920-00-116 Jefferson/
Beaumont
VA Actual $832,522 10 INSTALL LANDSCAPING
2464-01-014 Johnson/
Fort Worth
FM 2415 Actual $2,913,098 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH FOR A TOTAL OF 28 FT
0908-24-048 Jones/
Abilene
CR Actual $618,973 6 REPLACE BRIDGE
1095-03-016 Karnes/
Corpus Christi
FM 743 Actual $2,619,907 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0173-02-070 Kaufman/
Dallas
SH 34 Actual $838,275 8 PROFILE PAVEMENT MARKINGS
0751-02-023 Kaufman/
Dallas
FM 148 Actual $10,805,279 1 REHABILITATION OF EXISTING ROADWAY
0017-17-007 La Salle/
Laredo
BI 35-C Actual $260,356 1 RESURFACE OF EXISTING HIGHWAY
0901-00-052 Lamar/
Paris
VA Actual $1,777,289 10 CONSTRUCT CURB RAMPS ALONG HIGHWAY BU 69, SH 34, SS 302,
0901-00-053 Lamar/
Paris
VA Actual $217,690 1 INSTALL SIGNS FACES AND MOUNTS
0913-29-046 Lavaca/
Yoakum
CR Actual $639,216 6 REPLACE BRIDGE AND APPROACHES
0426-03-039 Leon/
Bryan
FM 542 Actual $1,887,338 8 SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE,
0914-25-006 Llano/
Austin
CR Actual $226,113 6 REPLACE BRIDGE AND APPROACHES
0005-15-082 Midland/
Odessa
IH 20 Actual $8,342,435 11 FACILITY UPGRADES TO MEET FREEWAY STANDARDS
1188-02-088 Midland/
Odessa
SH 158 Actual $600,783 11 TRAFFIC SIGNALS & FLASHING BEACONS
0912-37-140 Montgomery/
Houston
CR Actual $2,496,548 3 CONSTRUCT 2 - LANE ROADWAY (MISSING SEGMENT)
0904-11-054 Randall/
Amarillo
CS Actual $1,999,859 3 REHAB EXISTING ROADWAY
0345-01-059 Smith/
Tyler
SH 110 Actual $120,955 11 CONSTRUCT WELCOME SIGN
0080-07-094 Tarrant/
Fort Worth
US 377 Actual $19,065,203 3 WIDEN 5 LANE DITCH SECTION TO 6 LANE DIVIDED WITH CURB AND
0094-02-124 Tarrant/
Fort Worth
SH 183 Actual $194,924 3 FY14 - LANDSCAPING ENHANCEMENT
0171-05-081 Tarrant/
Fort Worth
SH 199 Actual $65,461,508 3 CONSTRUCT BRIDGE AT NEW LOCATION OF PROPOSED BYPASS CHANNEL
0902-48-870 Tarrant/
Fort Worth
VA Actual $3,687,030 1 DFW CONNECTOR COMPREHENSIVE MAINTENANCE AGREEMENT FY14
0902-48-897 Tarrant/
Fort Worth
NR Actual $566,276 7 MOBILITY ASST PATROL THAT PROVIDES ASST TO STRANDED MOTORIST
0911-40-028 Trinity/
Lufkin
CR Actual $604,354 6 REPLACE BRIDGE AND APPROACHES
3344-03-003 Upshur/
Atlanta
FM 3245 Actual $527,789 1 CONSTRUCT PAVED SHOULDERS
0745-01-015 Van Zandt/
Tyler
FM 314 Actual $11,961,746 8 PROVIDE ADD'L PAVED SURF WIDTH & REPAIR PAVEMENT (SECTIONS)
0913-27-054 Victoria/
Yoakum
CR Actual $338,315 6 REPLACE BRIDGE AND APPROACHES
0321-01-053 Williamson/
Austin
SH 95 Actual $816,326 8 IMPROVE GUARDRAIL & SAFETY TREAT FIXED OBJECTS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract