Letting Schedule for November, 2013 (FY 2014)

Last Update: Monday, November 17, 2014
November, 2013 (FY 2014) (see Links)
SEP 2013 | OCT 2013 | NOV 2013 | DEC 2013 | JAN 2014 | FEB 2014 | MAR 2014 | APR 2014 | MAY 2014 | JUN 2014 | JUL 2014 | AUG 2014
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0176-08-021 Angelina/
Lufkin
FM 324 Actual $569,823 8 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS)
0507-04-039 Aransas/
Corpus Christi
FM 1069 Actual $169,013 3 UPGRADE EXISTING DRAINAGE
0114-06-030 Bastrop/
Austin
US 290 Actual $19,049,777 3 WIDEN TO 4 LANE DIVIDED
0909-36-135 Bell/
Waco
CS Actual $1,534,974 3 CONSTRUCT ALTERNATE TRANSPORATION ROUTE CONSISTING OF
0915-12-510 Bexar/
San Antonio
CS Actual $3,189,748 3 RECONSTRUCT ROADWAY AND INCLUDES SIDEWALKS, CURB, DRAINAGE
0453-06-011 Briscoe/
Childress
SH 207 Actual $4,243,801 11 WIDENING OF NON - FREEWAY FACILITY
0925-12-014 Briscoe/
Childress
PW Actual $162,224 10 REPAIR DRAINAGE FACILITIES WITHIN CAPROCK CANYON STATE PARK
0152-02-070 Caldwell/
Austin
US 183 Actual $11,698,918 3 RECONSTRUCT TO 5 - LANE URBAN SECTION
0549-03-018 Collin/
Dallas
SH 121 Actual $38,276,054 3 WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED ROADWAY
0446-02-030 Colorado/
Yoakum
US 90A Actual $3,488,668 1 REPLACE BRIDGE AND APPROACHES
0079-02-048 Comanche/
Brownwood
US 67 Actual $4,490,030 1 SEAL COAT
0044-08-066 Cooke/
Wichita Falls
US 82 Actual $619,413 1 INTERSECTION IMPROVEMENTS
1047-03-063 Dallas/
Dallas
FM 1382 Actual $1,893,194 3 WIDEN FROM 4 LANES TO 6 LANES AND UPGRADE TRAFFIC SIGNALS
0167-01-108 El Paso/
El Paso
US 54 Actual $1,898,217 5 ALTERNATE ROUTES, PHASE II
2121-03-153 El Paso/
El Paso
IH 10 Actual $7,117,311 2M AESTHETICS AT AIRWAY INTERSECTION TO INCLUDE FENCING, LANDSC
0079-05-052 Erath/
Fort Worth
US 67 Actual $87,935 1 PLACE GABIONS ALONG INTERIOR BENT AND MATTRESSES BACK TO
0752-05-027 Falls/
Waco
FM 147 Actual $4,379,271 1 WIDEN PAVEMENT TO ADD SHOULDERS, PROVIDE SAFETY UPGRADES AND
0017-15-022 Frio/
San Antonio
SP 581 Actual $3,663,584 1 SEAL COAT & PAVEMENT MARKINGS
0558-07-016 Glasscock/
San Angelo
RM 33 Actual $17,979,930 1 GRADING, BASE AND SURFACING
0050-06-081 Harris/
Houston
US 290 Actual $85,215,954 2M RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE
0271-14-213 Harris/
Houston
IH 610 Actual 151,543,734 3 RECONSTRUCT US 290 / IH 610 INTERCHANGE WITH DIRECT CONNECTORS
0720-03-103 Harris/
Houston
SH 249 Actual $54,992,819 3 CONSTRUCT 6 - LANE TOLLWAY AND TSM (PHASE 2) WITH GRADE
0912-00-467 Harris/
Houston
VA Actual $7,500,000 5 CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2013) (NON - LETTING)
0912-00-498 Harris/
Houston
VA Actual $1,380,000 5 COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING
0976-01-019 Harris/
Houston
FM 865 Actual $13,285,921 3 WIDEN FROM 2 TO 4 LANES WITH CURB AND GUTTER
0766-01-027 Hopkins/
Paris
FM 69 Actual $1,863,527 1 REHAB EXIST ROAD
1677-01-015 Houston/
Lufkin
FM 1733 Actual $3,771,800 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0142-09-041 Kendall/
San Antonio
RM 473 Actual $5,605,395 1 SEAL COAT & PAVEMENT MARKINGS
0148-04-023 Kimble/
San Angelo
US 377 Actual $3,814,092 1 SEAL COAT
0688-03-023 Lamar/
Paris
FM 1497 Actual $2,196,575 6 REPLACE BRIDGE AND APPROACHES
0052-05-040 Lamb/
Lubbock
US 84 Actual $8,134,058 11 SEAL COAT
0625-01-002 Limestone/
Waco
PR 28A Actual $89,588 10 REPLACE BRIDGE
2078-02-007 Lipscomb/
Amarillo
RM 2248 Actual $1,605,360 6 REPLACE BRIDGE AND APPROACHES
0254-01-132 Live Oak/
Corpus Christi
US 281 Actual $4,926,163 1 OVERLAY ROADWAY
0675-05-076 Madison/
Bryan
IH 45 Actual $2,387,523 1 OVERLAY CONSISTING OF MILL AND INLAY
0380-09-080 Midland/
Odessa
SH 349 Actual $17,020,878 1 ROADWAY REHABILITATION
0463-02-067 Midland/
Odessa
SH 158 Actual $5,856,247 1 SEAL COAT
0923-23-025 Mills/
Brownwood
CR Actual $1,045,172 6 REHAB STRUCTURE
0059-01-058 Nacogdoches/
Lufkin
SH 7 Actual $8,730,176 1 RESURFACE WITH SEAL COAT
0250-02-044 Palo Pinto/
Fort Worth
US 281 Actual $450,283 1 REMOVAL OF ASBESTOS FROM BRIDGE
0437-01-023 Shackelford/
Abilene
US 283 Actual $3,960,640 1 SEAL COAT
0238-05-039 Sherman/
Amarillo
US 54 Actual $3,184,353 1 REHAB EXIST RDWY & ADD PASSING LANES
2075-02-045 Smith/
Tyler
LP 323 Actual $11,988,789 3 WIDEN FROM 4 LNS TO 6 LNS & REPLACE COTTON BELT R / R U / P
0700-03-125 Travis/
Austin
SH 71 Actual $15,965,613 ROW ADD LEFT TURN LANE & SHOULDERS
0095-06-064 Van Zandt/
Tyler
US 80 Actual $7,401,726 1 SEAL COAT & PAVEMENT MARKINGS
1809-02-024 Walker/
Bryan
FM 1696 Actual $4,305,080 8 SAFETY WORK CONSISTING OF SUBGRADE WIDENING, FLEXIBLE BASE,
0903-00-077 Wichita/
Wichita Falls
VA Actual $406,846 1 BRIDGE MAINTENANCE AND REPAIR


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract