0111-05-017 FM 521 Actual APR 2014 $2,719,120 1 SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
0178-02-086 SH 35 Actual APR 2014 $573,748 8 CONSTRUCT TURN AROUNDS WITH CLOSE CROSSOVER AT INTERSECTION
0179-03-029 SH 35 Actual JAN 2014 $2,733,017 1 BASE REPAIR, SEAL COAT, ACP OVERLAY & PAVEMENT MARKINGS
0179-05-002 SH 35 Actual SEP 2013 $3,985,333 1 SEAL COAT, ASPHALT CONCRETE PAVEMENT OVERLAY AND PAVEMENT
0598-04-027 SH 288 Actual AUG 2014 $688,183 3 CONSTRUCT A DRIVEWAY AND RELOCATE A RAMP NONE LETTING (BY
0912-31-222 CR Actual JUN 2014 $435,258 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0529001)
0912-31-263 CS Actual AUG 2014 $456,579 6 REPLACE BRIDGE (NBI# 12020D00946001)
0912-31-265 CR Actual OCT 2013 $448,818 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020AA0862005)
0912-31-267 CS Actual JUN 2014 $1,583,873 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020W00118001)
0912-31-276 VA Actual JAN 2014 $84,848 3 LANDSCAPE DEVELOPMENT
0912-31-279 VA Actual JUL 2014 $2,131,010 10 LANDSCAPE DEVELOPMENT

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-12-097 IH 69 Actual AUG 2014 156,029,235 1 WIDEN TO 8 ML, FRONTAGE ROADS, ITS, TMS AND CONSTRUCT 2 - WAY
0027-12-105 US 59 Actual JAN 2014 135,868,539 ROW WIDEN TO 6 - LANE RURAL FREEWAY, FRONTAGE ROADS, ITS AND TSM
0027-12-134 US 59 Actual DEC 2013 $696,611 1 INSTALL CTMS
0188-09-043 FM 723 Actual OCT 2013 $180,487 1 INSTALL LEFT TURN LANE
0271-05-037 IH 10 Actual FEB 2014 $10,742,565 11 CONSTRUCT GS OVER IH 10, ROUNDABOUT, LOOP RDS, ENTRANCE
0271-05-040 IH 10 Actual JUN 2014 $1,897,991 10 LANDSCAPE DEVELOPMENT
0543-03-070 FM 1462 Actual MAR 2014 $1,799,827 1 BASE REPAIR, 1.5" ACP O / L, SHOULDER TEXTURING AND PAVEMENT
0543-03-071 FM 762 Actual JUN 2014 $477,522 1 INSTALL WB LEFT TURN LANE AND IMPROVE SHOULDERS
0912-34-130 CS Actual JAN 2014 $4,192,145 3 RECONSTRT 4 - LN BLVD & INT APPROACHES W / TN - LNS & ITS
0912-34-159 CR Actual OCT 2013 $395,576 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0905001)
0912-34-169 CR Actual JAN 2014 $978,106 6 REPLACE BRIDGE AND APPROACHES (NBI# 12080AA0955001)
1415-02-045 FM 1464 Actual JAN 2014 $495,925 1 CONSTRUCT 1 DETENTION POND

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0367-02-077 SH 124 Actual APR 2014 $1,685,779 1 ASPHALT CONCRETE PAVEMENT OVERLAY
0389-06-102 SH 146 Actual JAN 2014 $593,503 1 TEXTURIZE SHOULDERS (PROFILE PAVEMENT MARKERS)
0500-04-122 IH 45 Actual JAN 2014 $2,055,734 3 SB RAMP REVERSALS
0912-73-151 CR Actual JUN 2014 $686,707 6 REPLACE BRIDGE AND APPROACHES (NBI# 12085AA0680001)
0912-73-184 VA Actual APR 2014 $625,000 3 PREVENTATIVE MAINTENANCE IN CITY OF GALVESTON (YEAR 1)
0912-73-187 VA Actual APR 2014 $1,496,970 3 PE FOR CONSTRUCTION OF KEMAH MUTIMODAL TERMINAL
0912-73-189 VA Actual JAN 2014 $629,425 10 REHABILITATE BILGE WATER TREATMENT SYSTEMS AND CONTAINMENT
0912-73-190 VA Actual FEB 2014 $357,800 10 RENOVATION OF SHOP RESTROOMS
0912-73-193 VA Actual MAR 2014 $305,695 10 CONSTRUCT NEW BOAT LIFT
0912-73-194 VA Actual MAR 2014 $731,490 10 CONSTRUCT NEW SCREENING CANOPIES
0978-02-054 FM 646 Actual JUL 2014 $5,827,859 1 INSTALL CROSS CULVERTS, ADJUST DRIVEWAYS AND RESTORE DRAINAG
0978-02-069 FM 517 Actual APR 2014 $246,123 8 INSTALL INTERSECTION FLASHING BEACON
0978-02-071 FM 517 Actual SEP 2013 $959,633 8 IMPROVE TRAFFIC SIGNAL AND ADD LEFT TURN LANE

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0027-10-062 US 90A Actual JUL 2014 $13,996,561 6 REPLACE TWO BRIDGES (NBI# 12102002710257 NB AND
0027-10-072 US 90A Actual AUG 2014 $108,288 10 FY 2014 RAILROAD GRADE CROSSING REPLANKING PROGRAM
0027-13-203 IH 69 Actual JUL 2014 $4,080,887 1 PLANNING, SEAL COAT AND THIN OVERLAY (FRONTAGE ROADS)
0028-02-090 US 90 Actual AUG 2014 $1,444,400 10 LANDSCAPE DEVELOPMENT
0050-06-080 US 290 Actual JUL 2014 $48,599,234 2M RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE
0050-06-081 US 290 Actual NOV 2013 $85,215,954 2M RECONSTRUCT AND WIDEN TO 8 MAIN LANES WITH 2 REVERSIBLE
0271-14-213 IH 610 Actual NOV 2013 151,543,734 3 RECONSTRUCT US 290 / IH 610 INTERCHANGE WITH DIRECT CONNECTORS
0271-16-134 IH 610 Actual MAR 2014 $699,002 8 IMPROVE TRAFFIC SIGNAL
0389-12-090 SH 146 Actual AUG 2014 $5,139,060 1 STAY CABLE MAINTENANCE
0500-03-044 IH 45 Actual JUL 2014 $19,637,823 ROW REPLACE BRIDGE AND APPROACHES (NBI# 121020050003112)
0500-03-567 IH 45 Actual APR 2014 $5,091,080 1 MILL AND OVERLAY
0500-03-573 IH 45 Actual FEB 2014 $24,062,148 1 CONSTRUCT DIRECT CONNECTOR IH 45 SB TO IH 610 WB
0500-03-574 IH 45 Actual OCT 2013 $48,776,267 1 CONSTRUCT DIRECT CONNECTOR IH 610 EB TO IH 45 NB
0500-03-586 IH 45 Actual JUL 2014 $3,918,000 1 CLEAN AND PAINT STEEL BRIDGE MEMBERS
0502-01-207 SH 225 Actual OCT 2013 $1,050,534 1 CLEAN AND SEAL JOINTS, FULL DEPTH REPAIR, MILLING AND 1.5"
0508-01-034 IH 10 Actual APR 2014 $2,122,123 1 INSTALL CTMS
0508-01-276 IH 10 Actual SEP 2013 $34,623,242 3 REPLACE BRIDGE AND APPROACHES
0508-01-344 IH 10 Actual APR 2014 $1,351,370 10 LANDSCAPE DEVELOPMENT
0720-03-102 SH 249 Actual DEC 2013 $39,448,254 3 CONSTRUCT 6 - LANE TOLLWAY WITH BRIDGES AT WILLOW CREEK,
0720-03-103 SH 249 Actual NOV 2013 $54,992,819 3 CONSTRUCT 6 - LANE TOLLWAY AND TSM (PHASE 2) WITH GRADE
0720-03-120 SH 249 Actual AUG 2014 $22,109,000 3 CONSTRUCT SB - WB DIRECT CONNECTOR
0720-03-128 SH 249 Actual JUN 2014 $254,036 8 IMPROVE TRAFFIC SIGNAL
0912-00-424 VA Actual OCT 2013 $2,697,458 3 PEDESTRIAN AND SIGNAL IMPROVEMENTS IN AIRLINE DISTRICT
0912-00-441 VA Actual DEC 2013 $1,210,348 1 UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
0912-00-442 VA Actual AUG 2014 $500,000 1 REPLACE 6 AGING DYNAMIC MESSAGE SIGNS
0912-00-443 VA Actual DEC 2013 $243,957 1 INSTALL SUPPLEMENTAL CCTV CAMERAS AT CRITICAL LOCAITONS
0912-00-462 VA Actual AUG 2014 $1,875,400 3 CLEAN AIR ACTION PROGRAM DEVELOPMENT IMPLEMENTATION
0912-00-467 VA Actual NOV 2013 $7,500,000 5 CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2013) (NON - LETTING)
0912-00-473 VA Actual AUG 2014 $3,751,000 3 REGIONAL VANPOOL PROGRAM (FY 2014)
0912-00-475 VA Actual MAY 2014 $7,500,000 5 CLEAN CITIES / CLEAN VEHICLES PROGRAM (FY 2014) (NON - LETTING)
0912-00-477 VA Actual AUG 2014 $2,000,000 3 REGIONAL VANPOOL PROGRAM (FY 2014)
0912-00-486 VA Actual AUG 2014 $6,251,000 3 REGIONAL FREEWAY INCIDENT MANAGEMENT (YEAR 1)
0912-00-489 VA Actual JUN 2014 $887,551 10 LANDSCAPE DEVELOPMENT
0912-00-491 VA Actual MAR 2014 $1,501,000 3 LIVABLE CENTERS PLANNING STUDIES
0912-00-498 VA Actual NOV 2013 $1,380,000 5 COMMUTE SOLUTIONS STAFF AND OUTREACH (C.S. FUNDING INCLUDING
0912-00-505 VA Actual MAY 2014 $3,000,000 5 DEVELOPING TRANSIT MARKET FLEET EXPANSION PROGRAM (YEAR 1)
0912-70-068 CS Actual JUL 2014 $499,114 3 WHITE OAK BAYOU SAFE ROUTE TO SCHOOL TRIAL, WEST HARRIS
0912-70-099 VA Actual MAY 2014 $2,767,523 10 CONSTRUCT CURB RAMPS ON IH 45, SH 249, SS 261, FM 525 AND
0912-71-046 CS Actual AUG 2014 $4,241,560 3 ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY
0912-71-459 VA Actual MAY 2014 $4,851,470 3 RECONSTRUCT STREET
0912-71-797 CR Actual FEB 2014 $1,424,413 3 GREENS BAYOU TRAIL SYSTEM IN GREATER GREENSPOINT MANAGEMENT
0912-71-894 CR Actual JUL 2014 $10,341,416 3 CONSTRUCT 4 - LANE BOULEVARD
0912-72-063 CS Actual AUG 2014 $1,156,420 3 CONSTRUCT 4 - LANE DIVIDED THOROUGHFARE
0912-72-184 CS Actual MAY 2014 $3,942,249 3 CONSTRUCT HIKE AND BIKE TRAIL, BENCHES, LIGHTING AND BRIDGES
0912-72-190 VA Actual AUG 2014 $1,906,720 3 ITS FOR HIGH DEMAND ARTERIAL STREETS (RCTSS) HARRIS COUNTY
0912-72-308 VA Actual AUG 2014 $3,001,000 3 TRAFFIC SIGNAL CONTROL SOFTWARE (CENTRAL ADMIN AND FIELD
0912-72-316 VA Actual APR 2014 $514,875 3 PE FOR INTERSECTION IMPROVEMENTS AND NEW SIDEWALKS
0912-72-317 VA Actual APR 2014 $390,375 3 PED / BIKE IMPROVEMENTS INCLUDING CONNECTIONS BTWN EXISTING
0912-72-323 CS Actual MAY 2014 $7,000,000 3 DESIGN AND RECONSTRUCT ROADWAY WITH TRANSITWAY (YEAR 1)
0912-72-326 CS Actual MAY 2014 $1,875,000 5 DESIGN AND CONSTRUCT MULTIMODAL TRANSIT CENTER / PARK & RIDE
0976-01-019 FM 865 Actual NOV 2013 $13,285,921 3 WIDEN FROM 2 TO 4 LANES WITH CURB AND GUTTER
1685-03-092 FM 1960 Actual APR 2014 $732,234 8 IMPROVE TRAFFIC SIGNAL
1685-05-104 SH 6 Actual FEB 2014 $3,853,845 1 IMPLEMENTATION OF ACCESS MANAGEMENT
3187-01-005 SH 99 Actual JUL 2014 $35,161,387 3 CONSTRUCT TWO 2 - LN FRONTAGE ROADS
3256-01-096 BW 8 Actual JUL 2014 $275,178 1 CHANNEL IMPROVEMENTS
3256-04-061 BW 8 Actual AUG 2014 $10,329,185 1 EXTEND BW 8 WITH GRADE SEPARATIONS & TWO 2 - LANE FRONTAGE

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-02-022 SH 75 Actual AUG 2014 $9,710,243 1 WIDEN SHOULDERS, BASE REPAIR, OCST, ACP OVERLAY & INT
0177-05-110 IH 69 Actual AUG 2014 $1,838,258 10 LANDSCAPE DEVELOPMENT
0338-11-055 LP 336 Actual APR 2014 $1,161,106 1 INSTALL CENTER TWO - WAY LEFT TURN LANE (CTWLTL)
0720-02-083 FM 149 Actual JUN 2014 $3,762,255 1 INST LT TN LNS AT 7 LOCATIONS (WILDWOOD CIR N, WILDWOOD CIR
0912-37-140 CR Actual MAY 2014 $2,496,548 3 CONSTRUCT 2 - LANE ROADWAY (MISSING SEGMENT)
0912-37-219 CR Actual JUN 2014 $454,454 6 REPLACE BRIDGE AND APPROACHES (NBI# 12170AA0435001)
1062-01-029 FM 1485 Actual OCT 2013 $1,568,959 8 BASE REPAIR AND 2" ACP O / L
1400-04-011 FM 1774 Actual AUG 2014 $18,070,204 1 WIDEN TO 4 - LANE WITH TWO WAY LEFT TURN LANE.
2325-01-016 FM 2432 Actual JUN 2014 $399,449 1 INSTALL LEFT TURN LANE - EASTBOUND TO NORTHBOUND
2744-01-030 FM 2854 Actual AUG 2014 $298,966 1 INSTALL LEFT TURN LANE - EASTBOUND TO NORTHBOUND
3158-01-031 FM 3083 Actual JUL 2014 $13,080,676 3 CONSTRUCT GRADE SEPARATION (DOT# 448 431H)

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0271-09-021 US 90 Actual JUL 2014 $671,949 1 INSTALL LEFT TURN LANE - EASTBOUND TO NORTHBOUND
0409-03-011 FM 1488 Actual APR 2014 $4,201,123 1 SEAL COAT, WITH THIN OVERLAY AND PAVEMENT MARKINGS
0523-02-044 FM 362 Actual MAR 2014 $109,573 8 INSTALL FLASHING BEACON AT INTERSECTION