Letting Schedule for July, 2014 (FY 2014)

Last Update: Monday, May 20, 2013
July, 2014 (FY 2014) (see Links)
SEP 2013 | OCT 2013 | NOV 2013 | DEC 2013 | JAN 2014 | FEB 2014 | MAR 2014 | APR 2014 | MAY 2014 | JUN 2014 | JUL 2014 | AUG 2014
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0108-06-051 Anderson/
Tyler
SH 19 Tentative $12,160,000 1 WIDEN 2 LN ROADWAY TO SUPER - 2 (3 LANE) CRITERIA
1550-02-008 Bee/
Corpus Christi
FM 534 Tentative $733,334 1 REHAB ROADWAY AND WIDEN
0909-36-136 Bell/
Waco
CS Tentative $1,260,620 6 REPLACE BRIDGE AND APPROACHES
0915-12-254 Bexar/
San Antonio
CS Tentative $726,000 7 EXPAND 2 TO 4 LANES WITH CURBS AND SIDEWALK
0915-12-459 Bexar/
San Antonio
CS Tentative $9,367,263 7 EXPAND 2 LANES TO 4 LANES WITH LEFT TURN LANES, BIKE LANES &
0915-12-516 Bexar/
San Antonio
CS Tentative $8,538,766 7 WIDEN ROADWAY TO 4 LANES WITH LEFT TURN LANES AND SIDEWALKS
0919-19-070 Bowie/
Atlanta
VA Tentative $783,462 9 RECONSTRUCT SIDEWALKS, ADD PEDESTRIAN FURNISHINGS, LIGHTING,
0357-06-020 Briscoe/
Childress
SH 207 Tentative $667,198 8 REALIGN INTERSECTIONS
0921-06-208 Cameron/
Pharr
VA Tentative $5,512,635 11 CONSTRUCTION OF BORDER SAFETY INSPECTION FACILTY (BSIF)
0921-06-226 Cameron/
Pharr
VA Tentative   ROW RIGHT OF WAY ACQUISITION
0921-06-227 Cameron/
Pharr
VA Tentative   ROW RIGHT OF WAY ACQUISITION AND UTILITY ADJUSTMENTS
1138-02-015 Cameron/
Pharr
FM 803 Tentative $6,400,000 3 REALIGN 2 LANE RURAL WITH 4 LANES FROM 0.6 MI S OF SH 100
0919-00-070 Cass/
Atlanta
VA Tentative $1,650,000 1 2014 DISTRICT SEAL COAT PAVEMENT MARKINGS
1392-01-035 Collin/
Dallas
FM 1378 Tentative $2,245,170 1 REPLACE BRIDGE AND APPROACHES
0918-00-208 Dallas/
Dallas
VA Tentative $300,000 7 CONDUCT STATED PREFERENCE SURVEY TO ASSESS POTENTIAL
0918-00-209 Dallas/
Dallas
VA Tentative $450,000 7 DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES
1068-04-154 Dallas/
Dallas
IH 30 Tentative $9,656,480 3 CONSTRUCT TWO LANE WESTBOUND FRONTAGE ROAD
2681-01-012 Denton/
Dallas
FM 2499 Tentative $30,102,403 3 CONSTRUCT 6 LANE DIVIDED URBAN FACILITY
2681-01-018 Denton/
Dallas
FM 2499 Tentative   3 ROW ACQUISITION, UTILITIES & RELOC
0257-04-025 Eastland/
Brownwood
SH 6 Tentative $1,930,000 1 BASE OVERLAY AND 2 COURSE SURFACE TREATMENT
2638-01-016 Eastland/
Brownwood
SH 206 Tentative $1,750,000 1 BASE OVERLAY AND SEAL COAT
1451-01-024 Ellis/
Dallas
FM 55 Tentative $4,000,000 1 REHABILITATE EXISTING PAVEMENT
0909-38-052 Falls/
Waco
CR Tentative $265,000 6 REPLACE BRIDGE AND APPROACHES
0901-32-043 Fannin/
Paris
CR Tentative $873,300 6 REPLACE BRIDGE AND APPROACHES
0913-28-056 Fayette/
Yoakum
CR Tentative $382,000 6 REPLACE BRIDGE AND APPROACHES
0913-28-057 Fayette/
Yoakum
CR Tentative $382,000 6 REPLACE BRIDGE AND APPROACHES
1692-01-007 Fayette/
Yoakum
FM 615 Tentative $601,000 6 REPLACE BRIDGE AND APPROACHES
0912-34-154 Fort Bend/
Houston
CR Tentative $324,000 6 REPLACE BRIDGE
0978-02-054 Galveston/
Houston
FM 646 Tentative $5,074,657 1 INSTALL CROSS CULVERTS, ADJUST DRIVEWAYS AND RESTORE DRAINAG
0212-04-033 Grimes/
Bryan
SH 30 Tentative $6,150,000 8 SAFETY IMPROVEMENT WORK CONSISTING OF GRADING, STRUCTURES,
0366-12-026 Guadalupe/
San Antonio
BS 123B Tentative $3,760,000 1 CONSTRUCT CLTL, BIKE LANES, SIDEWALK & DRAINAGE IMPROVEMENTS
0541-02-031 Hall/
Childress
SH 256 Tentative $2,250,000 1 REHABILITATION OF EXISTING ROADWAY
0508-01-336 Harris/
Houston
IH 10 Tentative $1,000,000 10 LANDSCAPE DEVELOPMENT
0912-71-799 Harris/
Houston
CS Tentative $2,610,295 3 SHARED USE PATH AND BRIDGE RESTORATION
0912-72-289 Harris/
Houston
CS Tentative $1,100,000 3 CONSTRUCTING A PEDESTRIAN BRIDGE AT BRINGHURST STREET IN
0912-72-296 Harris/
Houston
CS Tentative $7,200,000 1 INTERSECTION IMPROVEMENTS
0863-01-047 Hidalgo/
Pharr
FM 493 Tentative $6,208,149 1 RECONSTRUCT & ADD SHOULDERS
0921-02-314 Hidalgo/
Pharr
CS Tentative $108,146 9 RENOVATE EDINBURG TRAIN DEPOT
0921-02-315 Hidalgo/
Pharr
CS Tentative $304,672 9 LANDSCAPE IMPROVEMENTS
0921-02-316 Hidalgo/
Pharr
CS Tentative $1,608,025 3 CONSTRUCT EDINBURG HIKE & BIKE TRIAIL
2035-01-019 Hunt/
Paris
FM 2101 Tentative $2,260,388 8 WIDEN ROADWAY
0786-01-080 Jefferson/
Beaumont
FM 364 Tentative $294,271 5 CONSTRUCT SIDEWALKS
0920-38-217 Jefferson/
Beaumont
CR Tentative $1,829,111 6 REPLACE BRIDGE AND APPROACHES
0905-00-085 Lubbock/
Lubbock
VA Tentative $500,000 1 REHABILITATION OF EXISTING ROAD
3158-01-031 Montgomery/
Houston
FM 3083 Tentative $13,500,000 3 CONSTRUCT GRADE SEPARATION (DOT# 448 431H)
0919-20-031 Morris/
Atlanta
VA Tentative $1,052,595 9 RECONSTRUCT SIDEWALKS, ADD PEDESTRIAN FURNISHINGS, LIGHTING
0059-01-057 Nacogdoches/
Lufkin
SH 7 Tentative $538,596 8 TEXTURIZE SHOULDERS (ROLLED IN OR MILLED IN) , CENTERLINE
0911-08-044 Nacogdoches/
Lufkin
CR Tentative $254,100 6 REPLACE BRIDGE AND APPROACHES
0341-03-037 Polk/
Lufkin
US 287 Tentative $549,360 8 IMPROVE GUARDRAIL TO DESIGN STANDARDS AND SAFETY TREAT FIXED
7124-01-001 Presidio/
El Paso
RL SO Tentative $7,224,000 RL RECONSTRUCTION OF INTERNATIONAL RAIL BRIDGE AT PRESIDIO
0451-04-020 Rockwall/
Dallas
SH 205 Tentative $5,485,100 1 REHABILITATION OF EXISTING ROADWAY
3148-01-006 Rockwall/
Dallas
FM 3097 Tentative $5,928,230 7 RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED TO 4 LANE DIVIDED
1103-04-027 Starr/
Pharr
FM 755 Tentative $9,250,000 12 REALIGNMENT WITH PARTIAL WIDENING TO 4 LANES
0158-02-088 Tom Green/
San Angelo
US 67 Tentative $969,790 3 CONSTRUCT INTERCHANGE
2574-01-044 Tom Green/
San Angelo
RM 584 Tentative $2,600,000 1 ACP OVERLAY
0921-27-035 Willacy/
Pharr
CR Tentative $875,000 6 REPLACE BRIDGE & RECONST APPROACHES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract