Letting Schedule for Dallas District (FY 2014)
Dallas District (FY 2014) |
Collin | Dallas | Denton | Ellis | Kaufman | Navarro | Rockwall | ||||||
Collin County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
---|---|---|---|---|---|---|
0047-05-053 | SH 5 | Actual | JUL 2014 | $1,040,197 | 1 | BASE REPAIR AND OVERLAY |
0047-06-139 | US 75 | Actual | DEC 2013 | $47,531,667 | 3 | WIDEN AND RECONSTRUCT 6 LANE FREEWAY TO 8 LANES; IMPROVE 2 / 3 |
0047-14-077 | US 75 | Actual | MAR 2014 | $253,212 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING AND |
0091-04-058 | SH 289 | Actual | MAR 2014 | $376,485 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING & |
0091-04-059 | SH 289 | Actual | JUN 2014 | $649,412 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE AND SHRUB PLANTING & |
0135-02-044 | US 380 | Actual | JUN 2014 | $17,277,017 | 3 | WIDEN EXISTING FOUR LANE DIVIDED TO SIX LANE DIVIDED |
0135-02-054 | US 380 | Actual | FEB 2014 | $917,409 | 1 | FULL DEPTH CONCRETE REPAIR |
0549-03-018 | SH 121 | Actual | NOV 2013 | $38,276,054 | 3 | WIDEN TWO LANE RURAL HIGHWAY TO FOUR LANE DIVIDED ROADWAY |
0549-03-023 | SH 121 | Actual | OCT 2013 | $3,039,939 | 1 | BASE REPAIR, MILL, AND OVERLAY |
0816-04-047 | FM 455 | Actual | APR 2014 | $5,536,032 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1012-03-017 | FM 981 | Actual | AUG 2014 | $1,828,297 | 1 | REPLACE BRIDGE AND APPROACHES |
1013-01-028 | FM 546 | Actual | JUL 2014 | $5,997,171 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1016-02-017 | FM 1138 | Actual | SEP 2013 | $3,337,173 | 8 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
1392-01-035 | FM 1378 | Actual | JUL 2014 | $1,788,996 | 1 | REPLACE BRIDGE AND APPROACHES |
2678-01-009 | FM 428 | Actual | JUN 2014 | $2,519,273 | 1 | SHOULDER WIDENING, BASE REPAIR, UNDERSEAL AND LEVEL - UP |
Dallas County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0009-02-061 | SH 78 | Actual | JUN 2014 | $1,048,057 | 1 | FDR, MILL, ACP OVERLAY AND PVMNT MARKINGS |
0009-02-062 | SH 78 | Actual | MAR 2014 | $2,579,907 | 3 | CONSTRUCT UNDERGROUND WALKWAY |
0009-11-227 | IH 30 | Actual | AUG 2014 | $2,749,311 | 5 | ITS INSTALLATION |
0009-11-230 | IH 30 | Actual | MAR 2014 | $638,199 | 1 | CONCRETE FULL DEPTH REPAIR ON FRONTAGE ROADS |
0009-11-234 | IH 30 | Actual | AUG 2014 | $650,134 | 7 | INSTALL SIGNING OF TRUCK LANE RESTRICTIONS |
0047-07-206 | US 75 | Actual | JUN 2014 | $991,603 | 7 | MOBILITY AND SAFETY INTERSECTION IMPROVEMENTS; CONSTRUCT |
0048-01-062 | SH 342 | Actual | OCT 2013 | $7,850,200 | 1 | SEAL COAT, PVMT MKGS |
0092-14-083 | IH 345 | Actual | AUG 2014 | $666,025 | 1 | REPAIR BENT CAPS AND GIRDERS |
0095-02-113 | US 80 | Actual | AUG 2014 | $1,949,706 | 5 | INSTALLATION OF WIRELESS ITS SYSTEM |
0196-03-267 | IH 35E | Actual | MAY 2014 | $364,834 | 1 | INSTALLATION OF FIBER OPTIC CABLE |
0196-06-028 | SL 354 | Actual | JUL 2014 | $4,850,445 | ROW | PEDESTRIAN STRUCTURES AND SIDEWALKS (ON - SYSTEM) |
0197-02-110 | US 175 | Actual | FEB 2014 | $380,242 | 1 | REPAIR WB TO SB CONNECTOR RAMP |
0197-02-111 | US 175 | Actual | JAN 2014 | $207,035 | 1 | REPAIR DAMAGED 33" STORM DRAIN RCP |
0197-02-112 | US 175 | Actual | JUN 2014 | $2,707,489 | 1 | MILL, CONCRETE FULL DEPTH REPAIR AND ACP OVERLAY ON FRONTAGE |
0197-02-114 | US 175 | Actual | APR 2014 | $617,720 | 1 | INSTALL SAFETY LIGHTING |
0261-03-065 | US 67 | Actual | MAY 2014 | $416,695 | 8 | INSTALL PROTECTION |
0261-03-066 | US 67 | Actual | AUG 2014 | $140,431 | 10 | LANDSCAPE DEVELOPMENT TO INCLUDE TREE & SHRUB PLANTING AND |
0353-05-088 | SL 12 | Actual | AUG 2014 | $7,651,961 | ROW | INTERSECTION IMPROVEMENT |
0442-02-148 | IH 35E | Actual | DEC 2013 | $948,487 | 1 | INSTALL HIGH MAST ILLUMINATION |
0442-02-156 | IH 35E | Actual | APR 2014 | $328,569 | 1 | INSTALL SIGNING FOR TRUCK LANE RESTRICTIONS |
0581-02-139 | LP 12 | Actual | APR 2014 | $253,576 | 1 | BRIDGE DECK AND JOINT REPAIRS |
0581-02-140 | LP 12 | Actual | MAY 2014 | $2,679,704 | 1 | FULL DEPTH REPAIR, MILL AND OVERLAY |
0918-00-185 | VA | Actual | AUG 2014 | $1,297,700 | 1 | NON - SITE SPECIFIC SIGNAL CONTRACT ON NEW LOCATIONS |
0918-00-192 | VA | Actual | MAR 2014 | $3,300,000 | 7 | PROVIDE ASSISTANCE TO STRANDED MOTORISTS OR NON INJURY |
0918-00-207 | VA | Actual | MAY 2014 | $3,125,000 | 5 | REGIONAL EMISSIONS REDUCTION PROGRAM IMPLEMENTATION |
0918-00-209 | VA | Actual | MAY 2014 | $450,000 | 7 | DEPARTMENTAL STREAMLINING POLICIES AND PROCEDURES |
0918-00-210 | VA | Actual | MAY 2014 | $2,140,150 | 7 | REGIONAL TRIP REDUCTION PROGRAM, VANPOOL PGM, BIKE / PEDESTRIAN |
0918-00-228 | VA | Actual | FEB 2014 | $479,587 | 1 | NON - SITE SPECIFIC INSTALLATION OF GUIDE SIGNS ON NEW |
0918-00-234 | VA | Actual | JAN 2014 | $714,066 | 3 | WRONG WAY DRIVING PROGRAM; PILOT STUDY & IMPLEMENTATION TO |
0918-00-235 | VA | Actual | DEC 2013 | $311,000 | 5 | NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM |
0918-00-236 | VA | Actual | AUG 2014 | $946,333 | 5 | NCTCOG - - 511 TRAVELER INFORMATION SYSTEM; DEVELOP 511 SYSTEM |
0918-00-247 | VA | Actual | AUG 2014 | $15,625,000 | 7 | POSITIVE TRAIN CONTROL |
0918-45-731 | CS | Actual | JUL 2014 | $3,181,747 | 6 | REPLACE BRIDGE AND APPROACHES |
0918-45-761 | CS | Actual | JUN 2014 | $2,944,435 | ROW | REPLACE BRIDGE AND APPROACHES |
0918-45-864 | CS | Actual | JUL 2014 | $3,435,737 | ROW | RECONSTRUCT 4 LANE UNDIVIDED TO FOUR LANE DIVIDED |
0918-45-898 | CS | Actual | AUG 2014 | $663,639 | 3 | TRAFFIC CONTROL & SAFETY TREATMENTS FOR TRAIL / ROAD CROSSINGS |
0918-47-012 | CS | Actual | OCT 2013 | $896,210 | 3 | PEDESTRIAN WALKWAY IMPROVEMENTS |
0918-47-052 | VA | Actual | JUN 2014 | $2,270,944 | 10 | CONSTRUCT CURB RAMPS ON IH 635, SH 114, SH 161, SH 183, |
0918-47-078 | VA | Actual | JAN 2014 | $15,075,000 | 5 | LIGHT RAIL BED, TRACK, VEHICLES, OVERHEADS AND FACILITIES |
0918-47-084 | CS | Actual | MAY 2014 | $1,000,000 | 12 | IMPLEMENT PROGRAM TO RECRUIT, TRAIN, & CERTIFY DISADVANTAGED |
0918-47-111 | VA | Actual | AUG 2014 | $5,750,000 | 5 | PURCHASE OF 1 NEW LOCOMOTIVE FOR TRE |
1047-03-063 | FM 1382 | Actual | NOV 2013 | $1,893,194 | 3 | WIDEN FROM 4 LANES TO 6 LANES AND UPGRADE TRAFFIC SIGNALS |
1068-04-154 | IH 30 | Actual | JUL 2014 | $9,814,842 | 3 | CONSTRUCT TWO LANE WESTBOUND FRONTAGE ROAD |
2374-02-136 | IH 635 | Actual | AUG 2014 | $6,594,771 | 5 | INSTALLATION OF FULL ITS SYSTEM |
2374-03-076 | IH 20 | Actual | SEP 2013 | $1,858,920 | 1 | INSTALLATION OF FULL ITS SYSTEM |
2374-07-058 | IH 635 | Actual | JUN 2014 | $2,084,782 | 3 | CONSTRUCT 0 TO 2 LANE WB FRONTAGE ROAD |
2374-07-067 | IH 635 | Actual | APR 2014 | $2,938,210 | 1 | FULL DEPTH REPAIR AND MILL AND OVERLAY MAINLANES AND |
2964-01-022 | SH 161 | Actual | JAN 2014 | $3,796,615 | 3 | INTERIM OPERATIONAL BOTTLENECK IMPROVEMENT |
2964-01-045 | SH 161 | Actual | MAR 2014 | $866,004 | 3 | INSTALL CCTV CAMERAS AND ARTERIAL DIRECTIONAL CMS AT MAJOR |
Denton County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0081-06-029 | US 377 | Actual | JAN 2014 | $7,501,347 | 3 | CONSTRUCT CONTINUOUS 2 - WAY LEFT TURN LANE |
0816-02-053 | FM 455 | Actual | JUN 2014 | $3,335,495 | 1 | REPLACE EXISTING BRIDGE AND APPROACHES |
0918-46-255 | CS | Actual | OCT 2013 | $912,023 | 3 | CONSTRUCT SIDEWALKS, INSTALL SCHOOL ZONE SIGNS, INSTALL |
0918-46-258 | CS | Actual | JUN 2014 | $587,649 | 3 | DENTON A - TRAIN COMMUNITY ENHANCEMENTS - INSTALL SAFETY |
0918-46-276 | VA | Actual | AUG 2014 | $15,625,000 | 7 | POSITIVE TRAIN CONTROL |
1315-02-009 | FM 423 | Actual | SEP 2013 | $29,826,070 | 3 | WIDEN 2 LANE RURAL UNDIVIDED TO 6 LANE DIVIDED URBAN |
1567-01-025 | FM 720 | Actual | FEB 2014 | $15,597,320 | 3 | WIDEN TWO LANE RURAL TO SIX LANES URBAN DIVIDED |
1567-02-032 | FM 423 | Actual | MAY 2014 | $57,943,494 | ROW | SH 121 TO COUGAR ALLEY;WIDEN 4 TO 8 LN DIVIDED URBAN;COUGAR |
2250-02-016 | LP 288 | Actual | MAY 2014 | $3,653,118 | 1 | FULL DEPTH CONCRETE PAVEMENT REPAIR |
2681-01-012 | FM 2499 | Actual | JUL 2014 | $34,857,000 | 3 | CONSTRUCT 6 LANE DIVIDED URBAN FACILITY |
Ellis County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0048-03-084 | US 77 | Actual | JAN 2014 | $569,367 | 8 | PROFILE PAVEMENT MARKINGS |
0048-08-048 | IH 35E | Actual | JAN 2014 | $1,574,119 | 1 | REHABILITATE FRONTAGE ROAD PAVEMENT |
0092-11-003 | LP 561 | Actual | JAN 2014 | $681,040 | 1 | MILL, REPAIR AND RESURFACE |
0918-22-143 | CR | Actual | MAR 2014 | $602,706 | 6 | REPLACE BRIDGE AND APPROACHES |
1451-01-024 | FM 55 | Actual | JUL 2014 | $5,538,629 | 1 | REHABILITATE EXISTING PAVEMENT |
Kaufman County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0095-03-088 | US 80 | Actual | JUL 2014 | $9,634,025 | 1 | REHABILITATE FRONTAGE ROADS AND RAMPS |
0095-14-020 | IH 20 | Actual | APR 2014 | $2,619,188 | 3 | NEW LOCATION FRONTAGE ROAD |
0173-02-070 | SH 34 | Actual | MAY 2014 | $838,275 | 8 | PROFILE PAVEMENT MARKINGS |
0173-03-015 | SH 34 | Actual | MAR 2014 | $23,009,385 | 1 | CONSTRUCT 4 LNS OF ULTIMATE 6 LN URBAN ROADWAY WITH |
0173-03-038 | SH 34 | Actual | AUG 2014 | $13,849,420 | 3 | CONSTRUCT FOUR LANE HIGHWAY ON NEW LOCATION |
0751-01-044 | FM 148 | Actual | FEB 2014 | $1,820,532 | 3 | WIDEN EXISTING 2 LANE FACILITY TO 4 LANES |
0751-02-023 | FM 148 | Actual | MAY 2014 | $10,805,279 | 1 | REHABILITATION OF EXISTING ROADWAY |
2512-01-011 | FM 2728 | Actual | JUN 2014 | $9,419,882 | 1 | PROVIDE ADDITIONAL PAVED SURFACE WIDTH |
3089-01-010 | FM 3039 | Actual | JUN 2014 | $3,913,714 | 1 | REHABILITATE EXISTING ROADWAY |
Navarro County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0092-06-100 | IH 45 | Actual | JAN 2014 | $227,139 | 1 | INSTALL GUIDE SIGNS |
Rockwall County | ||||||
CCSJ | Highway | Let Status | Letting Date |
Contract Cost |
Fund Cat |
Description |
0451-04-020 | SH 205 | Actual | JUL 2014 | $1,740,712 | 1 | REHABILITATION OF EXISTING ROADWAY |
1016-01-027 | FM 551 | Actual | JUN 2014 | $5,349,450 | 1 | REHABILITATE EXISTING ROADWAY |
1016-01-029 | FM 551 | Actual | AUG 2014 | $48,000 | 10 | RAILROAD GRADE CROSSING REPLANKING |
3148-01-006 | FM 3097 | Actual | JUL 2014 | $9,349,455 | 7 | RECONSTRUCT AND WIDEN 2 LANE UNDIVIDED TO 4 LANE DIVIDED |
|