Letting Schedule for September, 2013 (FY 2014)

Last Update: Monday, November 17, 2014
September, 2013 (FY 2014) (see Links)
SEP 2013 | OCT 2013 | NOV 2013 | DEC 2013 | JAN 2014 | FEB 2014 | MAR 2014 | APR 2014 | MAY 2014 | JUN 2014 | JUL 2014 | AUG 2014
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0052-03-029 Bailey/
Lubbock
US 84 Actual $15,399,876 11 REHABILITATION OF EXISTING ROAD
0807-01-027 Bastrop/
Austin
FM 535 Actual $3,806,544 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0015-07-081 Bell/
Waco
IH 35 Actual $168,925 1 LEVELUP AND PROVIDE PFC OVERLAY
0017-10-253 Bexar/
San Antonio
IH 35 Actual $10,703,165 1 SEGMENTAL STRUCTURES - DRAINAGE REPAIR, POST TENSIONING DUCT
0915-00-171 Bexar/
San Antonio
VA Actual $3,000,000 1 DISTRICTWIDE ITS OPERATION AND MAINTENANCE FY 2014
0179-05-002 Brazoria/
Houston
SH 35 Actual $3,985,333 1 SEAL COAT, ASPHALT CONCRETE PAVEMENT OVERLAY AND PAVEMENT
0331-01-040 Cameron/
Pharr
SH 100 Actual $2,737,444 1 SEAL COAT
2419-01-010 Castro/
Lubbock
FM 145 Actual $1,987,950 11 REHABILITATION OF EXISTING ROAD
1016-02-017 Collin/
Dallas
FM 1138 Actual $3,337,173 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0016-05-106 Comal/
San Antonio
IH 35 Actual $5,848,000 1 SEAL COAT, PFC OVERLAY & PAVEMENT MARKINGS
2459-01-021 Cooke/
Wichita Falls
FM 902 Actual $2,939,410 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0867-03-026 Coryell/
Waco
FM 183 Actual $4,552,211 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
2374-03-076 Dallas/
Dallas
IH 20 Actual $1,858,920 1 INSTALLATION OF FULL ITS SYSTEM
1315-02-009 Denton/
Dallas
FM 423 Actual $29,826,070 3 WIDEN 2 LANE RURAL UNDIVIDED TO 6 LANE DIVIDED URBAN
0908-23-030 Fisher/
Abilene
CR Actual $714,924 6 REPLACE BRIDGE
0675-02-077 Freestone/
Bryan
IH 45 Actual $4,687,022 1 OVERLAY CONSISTING OF AN HMA OVERLAY
0017-07-132 Frio/
San Antonio
IH 35 Actual $593,552 1 INSTALL TRAFFIC SIGNAL
0748-01-029 Frio/
San Antonio
FM 140 Actual $1,394,946 1 WIDENING OF NARROW ROADWAY AND SHOULDERS
0978-02-071 Galveston/
Houston
FM 517 Actual $959,633 8 IMPROVE TRAFFIC SIGNAL AND ADD LEFT TURN LANE
0047-18-068 Grayson/
Paris
US 75 Actual $5,248,891 11 WIDEN EXISTING BRIDGE OVERPASS
0050-03-090 Grimes/
Bryan
SH 6 Actual $4,575,221 3 UPGRADING OF A FREEWAY FACILITY CONSISTING OF GRADING,
0251-01-056 Hamilton/
Waco
US 281 Actual $10,087,611 1 ADD PASSING LANES
0251-02-047 Hamilton/
Waco
US 281 Actual $9,687,837 1 REHAB ROADWAY AND ADD PASSING LANES
0508-01-276 Harris/
Houston
IH 10 Actual $34,623,242 3 REPLACE BRIDGE AND APPROACHES
0495-09-049 Harrison/
Atlanta
IH 20 Actual $7,961,243 1 RESURFACE EXISTING INTERSTATE FACILITY
0919-03-049 Harrison/
Atlanta
CR Actual $375,523 6 REPLACE BRIDGE AND APPROACHES
0458-01-022 Henderson/
Tyler
FM 59 Actual $6,987,662 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0621-01-099 Hidalgo/
Pharr
SH 336 Actual $80,950 3 CORRIDOR SIGNAL RE - TIMING
2094-01-051 Hidalgo/
Pharr
FM 2220 Actual $50,150 3 COORIDOR SIGNAL RE - TIMING
0109-03-032 Houston/
Lufkin
US 287 Actual $1,142,739 8 TEXTURIZE SHOULDERS (ROLLED IN OR MILLED IN)
0002-06-051 Hudspeth/
El Paso
IH 10 Actual $4,277,160 1 INSTALL MEDIAN BARRIER
1497-01-012 Hunt/
Paris
FM 1568 Actual $1,749,177 1 REHABILITATION OF EXISTING ROAD
0259-05-070 Johnson/
Fort Worth
US 67 Actual $2,820,911 1 RESURFACE ROADWAY
0259-06-001 Johnson/
Fort Worth
US 67 Actual $28,488,426 1 WIDEN TO 4 LANE DIVIDED
2213-01-013 Johnson/
Fort Worth
FM 2331 Actual $4,289,115 8 GRADING, BASE AND PAVEMENT
0327-02-051 Kenedy/
Pharr
US 77 Actual $8,073,400 1 MILL & OVERLAY N.B. & S.B. ROADWAYS
2329-02-015 Kent/
Abilene
FM 1081 Actual $5,496,256 1 WIDENING AND REHAB
0291-03-057 Kerr/
San Antonio
SH 16 Actual $2,504,539 1 WIDEN ROADWAY TO PROVIDE CONTINUOUS LEFT TURN LANE
0270-09-027 Live Oak/
Corpus Christi
SH 72 Actual $16,894,488 1 CONSTRUCT PASSING LANES
0700-04-045 Llano/
Austin
SH 71 Actual $4,402,628 1 UPGRADE TO SUPER 2 & ADD LTL'S
0130-05-077 Lubbock/
Lubbock
SH 114 Actual $997,062 1 RESTORATION OF EXISTING ROAD
0919-22-019 Marion/
Atlanta
CR Actual $304,787 6 REPLACE BRIDGE AND APPROACHES
0848-01-037 Medina/
San Antonio
FM 462 Actual $4,927,895 1 REHAB & WIDEN NARROW ROADWAY TO ADD SHOULDERS
0176-05-173 Polk/
Lufkin
US 59 Actual $738,985 8 IMPROVE GUARDRAIL TO DESIGN STANDARDS
0177-01-099 Polk/
Lufkin
US 59 Actual $1,577,675 1 REMOVE CROSSOVERS AND CONSTRUCT TURN - AROUNDS WITH
0904-00-152 Potter/
Amarillo
VA Actual $286,787 1 CRACK SEAL
0534-01-019 Randall/
Amarillo
PR 5 Actual $3,956,849 10 REPLACE CONCRETE WATER CROSSINGS
0772-01-027 Red River/
Paris
FM 410 Actual $2,516,693 1 REHAB EXIST ROAD
0424-01-045 Smith/
Tyler
SH 31 Actual $3,431,987 1 WIDEN 2 LN ROADWAY TO SUPER - 2 (3 LANE) CRITERIA
0910-00-093 Smith/
Tyler
VA Actual $98,697 1 DISTRICT - WIDE THERMO PLASTIC PAVEMENT MARKINGS PROGRAM
0039-01-079 Starr/
Pharr
US 83 Actual $8,089,840 1 OVERLAY (ML BOTH DIRECTIONS)
0034-01-124 Taylor/
Abilene
US 83 Actual $4,055,813 3 RELOCATE RAMPS AND RECONSTRUCT FRONTAGE ROADS
2398-01-047 Taylor/
Abilene
LP 322 Actual $4,222,065 3 RELOCATE RAMPS AND RECONSTRUCT FRONTAGE ROADS
0248-01-070 Titus/
Atlanta
US 271 Actual $779,081 1 RESTORE SECTION & RESURFACE EXISTING 4 - LANE HIGHWAY
0914-00-320 Travis/
Austin
VA Actual $452,779 1 FY 2013 SIGNING
3621-01-009 Val Verde/
Laredo
SL 79 Actual $5,720,530 4 FOR THE CONSTRUCTION OF A 2 LANE UNDIVIDED HIGHWAY
0842-02-021 Victoria/
Yoakum
FM 447 Actual $2,015,295 1 REPAIR & WIDEN ROADWAY
2350-01-053 Victoria/
Yoakum
US 77 Actual $1,585,484 1 CONSTRUCT TURN LANE
0110-01-037 Walker/
Bryan
SH 75 Actual $6,858,560 1 SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT
0089-08-095 Wharton/
Yoakum
US 59 Actual $2,072,945 11 ADDING ACCEL / DECEL LANES
0030-08-033 Wheeler/
Childress
US 83 Actual $5,038,373 1 SEAL COAT
0544-01-020 Wichita/
Wichita Falls
SH 258 Actual $5,823,532 8 WIDEN STRUCTURES AND ADD SHOULDERS
0100-03-076 Wilson/
San Antonio
US 181 Actual $507,654 1 INSTALL TRAFFIC SIGNAL


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract