Segment 3B-2 construction photos
Skip to main content
Highway construction

Segment 3B-2 construction photos

June 2026 construction videos

Installation of 12’ x 12’ Storm Sewer Box

Crews install a large 12’ x 12’ storm sewer box underneath Hamilton Street at Pierce Street. These large boxes will help store and move stormwater during heavy rain events. Once work is complete in this area there will be new storm sewer underneath Hamilton all the way from Clay Street to Gray Street.

Installation of 8-foot Diameter Storm Sewer Pipe

Here crews use an excavator to place a 96-inch diameter storm sewer pipe into the ground just north of Cleburne Street, west of SH 288. During heavy rains, the pipes being installed here will take stormwater south to a system built along SH 288 that drains into Brays Bayou.

June 2026 construction photos

This month crews began placing 12’ x 12’ storm sewer boxes underneath Hamilton Street between St. Joseph Parkway and Pierce Street and also placed 8-foot diameter storm sewer pipes into the ground near Cleburne Street and SH 288. Work is also progressing on the pump station at Jefferson and Chartres streets.

May 2026 construction videos

Alabama Street Bridge – No Longer There

Video from the east looking west at where the Alabama Street bridge over I-69 once stood, recorded on Saturday, May 9, 2026. This demolition was necessary since the I-69 mainlanes under the bridge will be lowered, meaning the bridge foundations need to be lower as well.

Construction on the new Alabama Street bridge over I-69 is anticipated to be completed by February 2027.

Alabama Street Bridge Demolition Part 1

Crews use excavators with attachments to demolish the Alabama Street bridge over the I-69 northbound mainlanes on Saturday, May 2, 2026. 

The demolition took two weekends to complete. The contractor will then build a new Alabama Street bridge over I-69 which is anticipated to be completed by February 2027.

March 2026 construction photos

The contractor is making progress on building the pump station at the corner of Jefferson and Chartres streets. The pump station will move stormwater into the improved system being built underneath St. Emanuel Street.

February 2026 construction photos

The contractor placed more of the large 12-foot by 12-foot storm sewer boxes underneath Hamilton Street between Leeland Street and St. Joseph Parkway. This work will help move stormwater during heavy rain events.

January 2026 construction photos

Construction this month included crews moving forward on the pump station at Chartres and Jefferson streets, and work on the I-69 northbound retaining wall at Alabama Street.

November 2025 construction photos

Installation of 8-foot diameter storm water pipes near I-69 and McGowen street pipes will ultimately carry stormwater from I-69/SH 288 mainlanes to drainage system underneath St. Emanuel street

April 2025 construction photos

Workers Pour Concrete into Pump Station near I-45 and I-69

April 2025 construction photos

Workers Pour Concrete into Pump Station near I-45 and I-69

October 2025 construction photos

Installation of 8-foot diameter storm water pipes near I-69 and McGowen street pipes will ultimately carry stormwater from I-69/SH 288 mainlanes to drainage system underneath St. Emanuel street

April 2025 construction photos

Workers Pour Concrete into Pump Station near I-45 and I-69