| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | BRAZORIA |
| Highway |
FM 2234 |
| From |
FORT BEND CL |
| To |
SH 288 |
| CSJ |
2105-02-003 |
| Proj ID |
STP 2010(953)ES |
| Work Type |
GR, STRS, BASE AND PAVE |
| |
|
2.703 |
12675636.89 |
590809.98 |
12732448.89 |
99.9 |
| Work Order |
07-21-10 |
| Work Began |
08-20-10 |
| Work Completed |
|
| Time Computed |
08-06-10 |
| Contract Working Days |
372 |
| Addl Days Granted |
0 |
| Working Days Charged |
341 |
| Percent Time Used |
91 |
| Contractor(s) |
| J.D. ABRAMS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 2105-02-003 TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. (2.46%) JMHP, INC. (0.12%) MURRAY CONSTRUCTION(0.37%) BECO CONSTRUCTION, L.L.C.(1.11%) CPAVE, INC.(0.50%) HOUSTON SAWING & DRILLING(0.05%) JAVALINA CONSTRUCTION SOUTH, INC.(1.17%) W. W. FOUNDATION DRILLING, LTD.(0.79%) SILVA CONTRACTING COMPANY, INC.(7.65%) BATTERSON,LLP(1.49%) ALLSTATE SIGNAL & CONSTRUCTION, LLC(7.71%) PEREZ CONSTRUCTION CO. (0.14%) APCON SERVICES, LLC(2.33%) SCOTT DERR PAINTING CO (0.01%) INDUS CONSTRUCTION, L.P. (0.04%) BUILDER SERVICES CO. (0.35%) TJ&T ENTERPRISES, INC. (0.92%)
|
| Contract # |
06103015 |
|
Totals |
12675636.89 |
590809.98 |
12732448.89 |
99.9 |
|
| County | GALVESTON |
| Highway |
FM 2004 |
| From |
BRAZORIA C/L |
| To |
SH 6 |
| CSJ |
2523-01-023 |
| Proj ID |
STP 1102(438) |
| Work Type |
ACP OVERLAY |
| |
|
6.862 |
1626527.86 |
71694.90 |
1609038.32 |
100.0 |
| Work Order |
09-14-11 |
| Work Began |
09-30-11 |
| Work Completed |
01-06-12 |
| Time Computed |
09-30-11 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
46 |
| Percent Time Used |
102 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 2523-01-023 BATTERSON,LLP(8.45%)
|
| Contract # |
08113064 |
|
Totals |
1626527.86 |
71694.90 |
1609038.32 |
100.0 |
|
| County | GALVESTON |
| Highway |
FM 646 |
| From |
IH 45 |
| To |
SH 3 |
| CSJ |
3049-01-027 |
| Proj ID |
STP 1102(316) |
| Work Type |
GR, BASE, SURF, STRS |
| |
|
1.434 |
9777012.33 |
0.00 |
1559868.20 |
15.9 |
| Work Order |
09-30-11 |
| Work Began |
10-17-11 |
| Work Completed |
|
| Time Computed |
10-16-11 |
| Contract Working Days |
270 |
| Addl Days Granted |
0 |
| Working Days Charged |
9 |
| Percent Time Used |
3 |
| Contractor(s) |
| HASSELL CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 3049-01-027 TRAFFIC SYSTEMS CONSTRUCTION, INC. (4.48%) BATTERSON,LLP(1.20%) GULF COAST PAVERS, INC.(1.06%) H & H CURB COMPANY (0.13%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.37%) GMJ PAVING CO. (5.15%) JMHP, INC. (0.15%) CHAMPIONS HYDRO-LAWN (0.64%) BREDA COMPANY, INC.(0.00%)
|
| Contract # |
08113210 |
|
Totals |
9777012.33 |
0.00 |
1559868.20 |
15.9 |
|
| County | GALVESTON |
| Highway |
FM 646 |
| From |
SH 3 |
| To |
FM 3436 |
| CSJ |
3049-01-028 |
| Proj ID |
NH 2012(024) |
| Work Type |
BS REPAIR, OCST & OVERLAY |
| |
|
5.045 |
2341740.72 |
274670.56 |
719964.12 |
30.7 |
| Work Order |
10-13-11 |
| Work Began |
11-09-11 |
| Work Completed |
|
| Time Computed |
10-29-11 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
24 |
| Percent Time Used |
40 |
| Contractor(s) |
| DURWOOD GREENE CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 3049-01-028 THIRD COAST SERVICES, LLC(3.22%) INTERSTATE BARRICADES & MARKINGS, INC. (4.61%) JMHP, INC. (1.30%)
|
| Contract # |
09113007 |
|
Totals |
2341740.72 |
274670.56 |
719964.12 |
30.7 |
|
| County | HARRIS |
| Highway |
FM 2978 |
| From |
MONTGOMERY C/L |
| To |
FM 2920 |
| CSJ |
3050-03-005 |
| Proj ID |
STP 2007(510)MM |
| Work Type |
GR, STRS, BS & SURF |
| |
|
2.288 |
11581370.88 |
19758.79 |
12174762.23 |
100.0 |
| County | HARRIS |
| Highway |
FM 2978 |
| From |
0.307 MILES NORTH OF UPRR |
| To |
0.470 MILES SOUTH OF UPRR |
| CSJ |
3050-03-012 |
| Proj ID |
STP 2007(822)ES |
| Work Type |
GR, STRS, BASE & PAVT |
| |
|
0.777 |
6909231.46 |
416.20 |
6688930.60 |
100.0 |
| Work Order |
10-14-09 |
| Work Began |
10-19-09 |
| Work Completed |
01-05-12 |
| Time Computed |
10-19-09 |
| Contract Working Days |
507 |
| Addl Days Granted |
0 |
| Working Days Charged |
490 |
| Percent Time Used |
96 |
| Contractor(s) |
| SMITH & COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 3050-03-005 A & G EBERHARDT ENTERPRISES, INC.(1.16%) A. H. BECK FOUNDATION CO., INC.(0.06%) EROSION CONTROL, INC.(1.05%) HIGHWAY TECHNOLOGIES, INC. (0.05%) SCOTT DERR PAINTING CO (0.08%) TEXAS LAND CLEARING SERVICE(0.06%) WEBBER BARRIER SERVICES, INC.(1.46%) WILLOW CITY SIGN & RAIL, INC.(0.63%) CRAVENS SERVICES, INC. ( 21.57%) BATTERSON, L.L.P.(0.60%) BREDA COMPANY, INC.(0.52%) DEANIE HAYES, INC. (2.03%) BEDO CONSTRUCTION PRODUCTS, INC. ( 11.05%) KATY CONSTRUCTION(0.11%) TEXAS STERLING CONSTRUCTION CO.(4.83%) RIVER CITIES SAWING LLC(0.36%)
|
| Contract # |
08093206 |
|
Totals |
18490602.34 |
20174.99 |
18863692.83 |
100.0 |
|
| County | HARRIS |
| Highway |
BW 8 |
| From |
WEST OF GREENSPOINT DR. |
| To |
WEST HARDY ROAD |
| CSJ |
3256-02-061 |
| Proj ID |
CM 2008(838) |
| Work Type |
GR, STRS, BASE AND PAVE |
| |
|
2.451 |
15013244.15 |
182345.48 |
7023782.04 |
46.7 |
| County | HARRIS |
| Highway |
BW 8 |
| From |
IH 45N |
| To |
HARDY TOLL ROAD |
| CSJ |
3256-02-070 |
| Proj ID |
CM 2006(382) |
| Work Type |
ACQUISITION, UTILITIES AND RELOCATI |
| |
|
1.553 |
390857.00 |
144805.00 |
242568.00 |
62.0 |
| Work Order |
05-22-09 |
| Work Began |
09-05-09 |
| Work Completed |
|
| Time Computed |
09-05-09 |
| Contract Working Days |
575 |
| Addl Days Granted |
502 |
| Working Days Charged |
658 |
| Percent Time Used |
61 |
| Contractor(s) |
| LIBERTY MUTUAL INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 3256-02-061 COASTAL CRUSHED CONCRETE, LLC(2.59%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.26%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.14%) DIAMOND J DRILLING (1.75%) KENNETH LAMB CONSTRUCTION( 12.42%) JOE VALENCIK, INC. (0.88%) STRIPES & STOPS COMPANY, INC.(0.06%) CHERRY DEMOLITION(0.11%) JET UNDERGROUND UTILITIES, INC.(2.80%) CPAV SPECIALTIES, LP (0.42%) TRIUMPH PARKING LOT MAINTENANCE, INC.(0.04%) NORTHWEST MATERIALS(0.01%) BAHENA STEEL (0.12%) MESA ROD BUSTERS, INC. (1.17%) GROUND HOG FOUNDATION DRILLING (0.06%) VICK OPERATING COMPANY, LLC(0.96%) HUBCO, INC.(0.96%) JTB SERVICES (0.32%) PEREZ CONSTRUCTION (0.12%) TEXAS STERLING CONSTRUCTION CO.( 65.72%) MAGNUM TUNNELING, LLC(0.70%) SCOTT DERR PAINTING CO (0.07%) PRIMATE CONSTRUCTION, INC. (0.38%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.17%) BATTERSON,LLP(1.24%) TRAFFIC SYSTEMS CONSTRUCTION, INC. (2.39%) SOUTHERN CRUSHED CONCRETE LLC(1.64%) EL DORADO PAVING COMPANY, INC. (0.61%) A A CONSTRUCTION (0.61%) WILLOW CITY SIGN & RAIL, INC.(0.16%) ENVIRONMENTAL ALLIES, L.P. (0.31%) MESA ROD BUSTERS, INC. (0.97%)
|
| Contract # |
03093228 |
|
Totals |
15404101.15 |
327150.48 |
7266350.04 |
47.1 |
|
| County | HARRIS |
| Highway |
BW 8 |
| From |
IH 45 N |
| To |
W OF UPRR |
| CSJ |
3256-02-079 |
| Proj ID |
CM 2007(830) |
| Work Type |
INSTALL CTMS |
| |
|
37.627 |
20754799.00 |
0.00 |
25968975.36 |
99.9 |
| Work Order |
12-05-07 |
| Work Began |
07-07-08 |
| Work Completed |
|
| Time Computed |
06-02-08 |
| Contract Working Days |
780 |
| Addl Days Granted |
0 |
| Working Days Charged |
754 |
| Percent Time Used |
96 |
| Contractor(s) |
| EAS CONTRACTING, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 3256-02-079 WILLOW CITY SIGN & RAIL, INC.(0.40%) INTERSTATE BARRICADES & MARKINGS, INC. (0.15%) W. W. FOUNDATION DRILLING, LTD.(1.15%) ANCHOR FENCE (0.10%) DEVOLVE CORP (0.52%) SUPERIOR GROUTING SERVICES, INC. (1.16%) LONE STAR PRESTRESS(1.19%) CONDUIT CONSTRUCTORS (1.28%) CPAV SPECIALTIES, LP (0.14%)
|
| Contract # |
08073008 |
|
Totals |
20754799.00 |
0.00 |
25968975.36 |
99.9 |
|
| County | HARRIS |
| Highway |
BW 8 |
| From |
AT JOHN F KENNEDY BLVD |
| To |
. |
| CSJ |
3256-02-086 |
| Proj ID |
STP 1102(317)HESG |
| Work Type |
TRAFFIC SIGNAL |
| |
|
0.002 |
380585.05 |
3750.00 |
91597.50 |
24.0 |
| Work Order |
09-14-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
09-30-11 |
| Contract Working Days |
122 |
| Addl Days Granted |
0 |
| Working Days Charged |
34 |
| Percent Time Used |
27 |
| Contractor(s) |
| TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 3256-02-086 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08113272 |
|
Totals |
380585.05 |
3750.00 |
91597.50 |
24.0 |
|
| County | HARRIS |
| Highway |
BW 8 |
| From |
AT VISTA,SPENCER,PASADENA BLVD_& |
| To |
RED BLUFF |
| CSJ |
3256-03-072 |
| Proj ID |
CM 2007(854)ES |
| Work Type |
TURN RADIUS IMPROVEMENTS |
| |
|
0.360 |
2349189.33 |
13888.91 |
2547956.39 |
99.9 |
| Work Order |
11-02-09 |
| Work Began |
12-14-09 |
| Work Completed |
|
| Time Computed |
11-18-09 |
| Contract Working Days |
230 |
| Addl Days Granted |
0 |
| Working Days Charged |
229 |
| Percent Time Used |
99 |
| Contractor(s) |
| TEXAS STERLING CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 3256-03-072 TRAF-TEX, INC. ( 20.67%) BATTERSON, L.L.P.(4.11%) EL DORADO PAVING COMPANY, INC. (5.00%) SOUTHERN CRUSHED CONCRETE INC. (1.22%) PRIMATE CONSTRUCTION, INC. (0.16%)
|
| Contract # |
09093006 |
|
Totals |
2349189.33 |
13888.91 |
2547956.39 |
99.9 |
|
| County | HARRIS |
| Highway |
SH 99 |
| From |
0.490 MI N OF KINGSLAND BLVD |
| To |
0.120 MI S OF COLONIAL PKWY |
| CSJ |
3510-05-010 |
| Proj ID |
C 3510-5-10 |
| Work Type |
GR, STRS, BASE AND PAVEMENT |
| |
|
0.896 |
17265149.66 |
870874.63 |
4374429.47 |
25.3 |
| County | HARRIS |
| Highway |
SH 99 |
| From |
AT IH 10 (W) |
| To |
N OF COLONIAL PKWY |
| CSJ |
3510-05-018 |
| Proj ID |
NH 1102(439) |
| Work Type |
CONSTRUCT 2 DIRECT CONNECTORS |
| |
|
0.436 |
32174192.92 |
503492.36 |
6010554.57 |
18.6 |
| Work Order |
09-15-11 |
| Work Began |
09-23-11 |
| Work Completed |
|
| Time Computed |
10-01-11 |
| Contract Working Days |
598 |
| Addl Days Granted |
0 |
| Working Days Charged |
72 |
| Percent Time Used |
12 |
| Contractor(s) |
| WILLIAMS BROTHERS CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 3510-05-018 SCOTT DERR PAINTING CO, LLC(0.84%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.54%) BASE CONSTRUCTION, L.L.P.(3.00%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.18%) AMERICAN DRAINAGE SYSTEM, INC. (0.16%) WILLOW CITY SIGN & RAIL, INC.(0.56%) MESA ROD BUSTERS, INC. ( 13.52%) BORTUNCO (0.16%) BATTERSON,LLP(0.34%) CREACOM, INC.(4.96%) MAGNUM TUNNELING, LLC(0.11%) SPECIALTY DRILLING, LTD. (0.19%)
|
| Contract # |
08113001 |
|
Totals |
49439342.58 |
1374366.99 |
10384984.04 |
21.0 |
|
| County | HARRIS |
| Highway |
SH 99 |
| From |
S OF US 290 |
| To |
US 290 |
| CSJ |
3510-05-019 |
| Proj ID |
C 3510-5-19 |
| Work Type |
4 DCS |
| |
|
3.140 |
115670596.33 |
973769.74 |
7181982.57 |
6.2 |
| Work Order |
09-14-11 |
| Work Began |
10-03-11 |
| Work Completed |
|
| Time Computed |
09-30-11 |
| Contract Working Days |
691 |
| Addl Days Granted |
0 |
| Working Days Charged |
68 |
| Percent Time Used |
9 |
| Contractor(s) |
| WEBBER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 3510-05-019 DORAN STEEL, INC.(1.09%) KELLYSTONE, INC(0.14%) ALLSTATE SIGNAL & CONSTRUCTION, LLC(4.41%) RDI FOUNDATION DRILLING(4.34%) EROSION CONTROL, INC.(0.00%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.00%) GMJ PAVING CO. (1.32%) WILLOW CITY SIGN & RAIL, INC.(0.79%) HIGHWAY TECHNOLOGIES, INC. (0.22%)
|
| Contract # |
07113011 |
|
Totals |
115670596.33 |
973769.74 |
7181982.57 |
6.2 |
|
| County | HARRIS |
| Highway |
SH 99 |
| From |
N OF COLONIAL PKWY |
| To |
N OF MORTON RD (SEG E) |
| CSJ |
3510-05-022 |
| Proj ID |
C 3510-5-22 |
| Work Type |
GR, STRS, BASE & PAV |
| |
|
1.950 |
32334777.01 |
2259057.02 |
6170610.22 |
19.0 |
| Work Order |
09-30-11 |
| Work Began |
10-17-11 |
| Work Completed |
|
| Time Computed |
10-16-11 |
| Contract Working Days |
602 |
| Addl Days Granted |
0 |
| Working Days Charged |
57 |
| Percent Time Used |
9 |
| Contractor(s) |
| HASSELL CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 3510-05-022 GMJ PAVING CO. (3.09%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.23%) BREDA COMPANY, INC.(0.56%) GULF COAST PAVERS, INC.(0.52%) H & H CURB COMPANY (0.04%) CHAMPIONS HYDRO-LAWN (0.59%) LONE STAR ROAD CONSTRUCTION, LTD.( 31.94%) VAQUERO CONSTRUCTION, INC. (3.26%) BATTERSON,LLP(0.65%) CREACOM, INC.(6.17%) LINDSEY CONSTRUCTION, INC. (7.65%) RDI FOUNDATION DRILLING(2.21%) VALLEY PLACERS, LLC(0.12%)
|
| Contract # |
07113233 |
|
Totals |
32334777.01 |
2259057.02 |
6170610.22 |
19.0 |
|
| County | HARRIS |
| Highway |
SH 99 |
| From |
N OF MORTON RD |
| To |
S OF FM 529 (SEG E) |
| CSJ |
3510-05-023 |
| Proj ID |
C 3510-5-23 |
| Work Type |
GR, STRS, BASE & PAV |
| |
|
8.903 |
122892918.02 |
5295924.97 |
18723103.38 |
15.2 |
| Work Order |
09-13-11 |
| Work Began |
09-19-11 |
| Work Completed |
|
| Time Computed |
09-29-11 |
| Contract Working Days |
650 |
| Addl Days Granted |
0 |
| Working Days Charged |
71 |
| Percent Time Used |
10 |
| Contractor(s) |
| J.D. ABRAMS, L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 3510-05-023 WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(0.21%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.42%) REPUBLIC TRAFFIC SAFETY, INC.(0.09%) CUT"N SHOOT, INC.(0.13%) BELL BOTTOM FOUNDATION CO. (3.44%) DORAN STEEL, INC.(0.23%) EGGEMEYER LAND CLEARING, LLC (0.12%) ESSARY, HART & MACWILIAM,INC.(0.88%) VAQUERO CONSTRUCTION, INC. (3.34%) CREACOM, INC.(5.08%) SPECIALTY DRILLING, LTD. (0.08%) MAGNUM TUNNELING, LLC(0.08%)
|
| Contract # |
07113222 |
|
Totals |
122892918.02 |
5295924.97 |
18723103.38 |
15.2 |
|
| County | MONTGOMERY |
| Highway |
SH 242 |
| From |
AT KROPIK,FIRETOWER,HAYDEN,HICKORY, |
| To |
LONESTAR RANCH AND FAWN RIDGE |
| CSJ |
3538-01-040 |
| Proj ID |
CM 1102(147) |
| Work Type |
ADD LT TN LNS |
| |
|
0.002 |
1258077.63 |
6329.44 |
988451.57 |
78.5 |
| Work Order |
08-16-11 |
| Work Began |
09-26-11 |
| Work Completed |
|
| Time Computed |
09-01-11 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
60 |
| Percent Time Used |
100 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 3538-01-040 HIGHWAY TECHNOLOGIES, INC. ( 10.70%) SEAMARCK LANDSCAPE SERVICES, INC (0.31%)
|
| Contract # |
07113021 |
|
Totals |
1258077.63 |
6329.44 |
988451.57 |
78.5 |
|
| County | HARRIS |
| Highway |
MH |
| From |
HEMPSTEAD RD AT UPRR |
| To |
WHITE OAK BAYOU |
| CSJ |
8170-12-002 |
| Proj ID |
RW 8170-12-2 |
| Work Type |
ROW UTL. ADJ.; RELOC. ASSIST. |
| |
|
1.439 |
668395.50 |
0.00 |
0.00 |
0.0 |
| County | HARRIS |
| Highway |
MH |
| From |
ON WASHINGTON/HEMPSTEAD |
| To |
WASHINGTON-KATY SPLIT TO IH 10 |
| CSJ |
8170-12-006 |
| Proj ID |
HP 2008(049) |
| Work Type |
GR, STRS & SURF |
| |
|
2.151 |
10729927.24 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
12-09-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
407 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SER CONSTRUCTION PARTNERS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 8170-12-006 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10113205 |
|
Totals |
11398322.74 |
0.00 |
0.00 |
0.0 |
|