Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS ON US 290
To .
CSJ 0912-72-208
Proj ID NH 2009(881)
Work Type TSM IMPROVEMENTS
 
4.960 2568232.67 0.00 0.00 0.0
Work Order 10-14-09
Work Began 00-00-00
Work Completed  
Time Computed 10-30-09
Contract Working Days 116
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ROZCO CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-208
BATTERSON, L.L.P.(3.32%)
PFEIFFER & SON LTD.(9.99%)
WILLOW CITY SIGN & RAIL, INC.(2.10%)
Contract # 08093219
Totals 2568232.67 0.00 0.00 0.0

CountyHARRIS
Highway VA
From VAR LOCATIONS INSIDE HARRIS COUNTY
To .
CSJ 0912-72-210
Proj ID STP 2009(366)
Work Type PAVEMENT MARKINGS
 
0.001 438387.10 0.00 397733.89 90.7
Work Order 04-09-09
Work Began 00-00-00
Work Completed  
Time Computed 04-25-09
Contract Working Days 180
Addl Days Granted 0
Working Days Charged 31
Percent Time Used 17
Contractor(s)
BATTERSON, L.L.P.
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-210
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03093012
Totals 438387.10 0.00 397733.89 90.7

CountyGALVESTON
Highway CS
From OLEANDER DR AT DRAINAGE DITCH
To .
CSJ 0912-73-080
Proj ID BR 99(728)
Work Type REPLACE BRIDGE AND APPROACHES
 
0.061 436567.38 1882.91 395070.24 96.1
Work Order 10-10-08
Work Began 05-21-09
Work Completed  
Time Computed 10-26-08
Contract Working Days 72
Addl Days Granted 0
Working Days Charged 121
Percent Time Used 168
Contractor(s)
TEXAS STERLING CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-080
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.98%)
KOSSMAN CONTRACTING COMPANY(0.85%)
WORK ZONE PRODUCTS, INC. (0.17%)
BREDA COMPANY, INC.(0.98%)
EMBARK (0.79%)
Contract # 09083223
Totals 436567.38 1882.91 395070.24 96.1

CountyGALVESTON
Highway CS
From AT PORT OF GALVESTON - 20TH STREET
To 22ND STREET ALONG THE GALVESTON RR
CSJ 0912-73-082
Proj ID STP 2000(587)TE
Work Type PEDES BARR FENCING, LANDSCP & IRRIGA
 
0.132 223778.85 0.00 213529.35 95.4
Work Order 09-12-08
Work Began 01-07-09
Work Completed  
Time Computed 09-28-08
Contract Working Days 58
Addl Days Granted 0
Working Days Charged 42
Percent Time Used 72
Contractor(s)
TEXAS TREE & LANDSCAPE, LTD
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-082
SOUTHWESTERN ROAD BORING (0.44%)
Contract # 10073215
Totals 223778.85 0.00 213529.35 95.4

CountyGALVESTON
Highway CS
From ON BROADWAY, FROM 59TH STREET
To 6TH STREET
CSJ 0912-73-083
Proj ID STP 2000(588)TE
Work Type LANDSCAPING BEAUTIFICATION
 
3.820 1125442.18 2275.50 1224026.55 99.9
Work Order 01-10-08
Work Began 02-13-08
Work Completed  
Time Computed 01-26-08
Contract Working Days 220
Addl Days Granted 0
Working Days Charged 168
Percent Time Used 76
Contractor(s)
BOYER, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-083
LONE STAR TRAFFIC SERVICE, INC.(0.83%)
DEMAC & COMPANY(4.97%)
R & A BORING COMPANY (5.39%)
MIKELS CONSTRUCTION CO., INC.(5.39%)
Contract # 12073204
Totals 1125442.18 2275.50 1224026.55 99.9

CountyGALVESTON
Highway VA
From FM 518, FM 2094
To SH 146
CSJ 0912-73-115
Proj ID STP 2010(062)
Work Type 3 DETENTION PONDS
 
0.001 628620.07 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-02-09
Work Began 00-00-00
Work Completed  
Time Computed 11-18-09
Contract Working Days 72
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SLACK & CO. CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-115
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09093037
Totals 628620.07 0.00 0.00 0.0

CountyGALVESTON
Highway VA
From VARIOUS LOCATIONS
To .
CSJ 0912-73-131
Proj ID STP 2010(063)ES
Work Type FULL DEPTH CONC REPR
 
26.808 442388.58 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 75
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ISI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-131
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10093037
Totals 442388.58 0.00 0.00 0.0

CountyBRAZORIA
Highway FM 865
From SOUTH OF HARRIS COUNTY LINE
To FM 518
CSJ 0976-02-085
Proj ID STP 2009(283)
Work Type GR, BS & SURF
 
1.915 13267224.77 487840.02 5914317.08 44.5
CountyBRAZORIA
Highway FM 865
From SOUTH OF HARRIS COUNTY LINE
To FM 518
CSJ 0976-02-087
Proj ID RW 976-2-87
Work Type ROW ACQ. AND UTL. ADJ.
 
0.001 394560.47 0.00 212629.35 53.8
Work Order 04-09-09
Work Began 05-05-09
Work Completed  
Time Computed 04-25-09
Contract Working Days 459
Addl Days Granted 0
Working Days Charged 152
Percent Time Used 33
Contractor(s)
HASSELL CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0976-02-085
HIGHWAY TECHNOLOGIES (1.51%)
GMJ PAVING CO. (4.67%)
PROTECTIVE ENVIRONMENTAL STRATEGIES, INC.(0.70%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.27%)
CREACOM, INC.(6.36%)
CHERRY CRUSHED CONCRETE(4.42%)
SPECIALTY DRILLING (0.58%)
SCOTT DERR PAINTING CO (0.00%)
BECO CONSTRUCTION, L.L.C.(0.21%)
NBG CONSTRUCTORS, INC. ( 17.22%)
MAGNUM TUNNELING, LLC(0.10%)
MICKIE SERVICE, INC. (0.01%)
Contract # 02093201
Totals 13661785.24 487840.02 6126946.43 44.8

CountyGALVESTON
Highway FM 1266
From FM 517
To FM 646
CSJ 0976-05-025
Proj ID STP 2009(036)
Work Type REP BS & SL CT
 
2.010 339577.59 0.00 442258.49 99.9
Work Order 10-09-08
Work Began 11-03-08
Work Completed  
Time Computed 10-25-08
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 51
Percent Time Used 85
Contractor(s)
FORDE CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0976-05-025
INTERSTATE BARRICADES & MARKINGS, INC. (1.47%)
Contract # 09083020
Totals 339577.59 0.00 442258.49 99.9

CountyHARRIS
Highway NASA 1
From IH 45
To 0.60 KM E OF FM 270
CSJ 0981-01-086
Proj ID NH 2004(76)
Work Type GR, BASE, CRCP, STR, STM SWR, LTG, SIGN, P
 
5.507 40667675.35 17707.25 41171323.25 99.9
Work Order 08-05-04
Work Began 08-23-04
Work Completed  
Time Computed 08-21-04
Contract Working Days 732
Addl Days Granted 472
Working Days Charged 1,135
Percent Time Used 94
Contractor(s)
ST. PAUL FIRE AND MARINE INSURANCE COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0981-01-086
BATTERSON, L.L.P.(1.28%)
INDUS CONSTRUCTION, L.P. (1.50%)
KENMOR ELECTRIC COMPANY, L.P.(5.66%)
HAYWARD BAKER, INC.(0.76%)
NORTHWEST MATERIALS(0.12%)
BORING & TUNNELING COMPANY OF AMERI(0.34%)
EROSION CONTROL, INC.(0.24%)
EL DORADO PAVING COMPANY, INC. (0.78%)
PRIMATE CONSTRUCTION, INC. (0.33%)
SCOTT DERR PAINTING CO (0.30%)
STOMPER DEMOLITION (0.54%)
TARTAGLIA CONSTRUCTION, INC. (0.09%)
WILLOW CITY SIGN & RAIL, INC.(0.47%)
TEXAS CUTTING & CORING, INC. (0.08%)
ABER FENCE & SUPPLY CO., INC.(0.05%)
Contract # 04043001
Totals 40667675.35 17707.25 41171323.25 99.9

CountyHARRIS
Highway NASA 1
From IH 45
To SH 146
CSJ 0981-01-102
Proj ID CM 2008(837)
Work Type INSTALL CTMS
 
7.964 3356949.75 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 11-06-09
Work Began 00-00-00
Work Completed  
Time Computed 11-22-09
Contract Working Days 375
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0981-01-102
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09093210
Totals 3356949.75 0.00 0.00 0.0

CountyBRAZORIA
Highway FM 524
From FM1301
To LOOP 419
CSJ 1004-02-014
Proj ID STP 2009(547)ES
Work Type ASPH O / L & PAV MRKS
 
11.799 1360458.79 -67376.73 657542.28 48.3
Work Order 06-02-09
Work Began 07-21-09
Work Completed  
Time Computed 06-18-09
Contract Working Days 77
Addl Days Granted 0
Working Days Charged 76
Percent Time Used 98
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 1004-02-014
BATTERSON, L.L.P.(9.90%)
COX PAVING COMPANY, L.P. (2.97%)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.(1.19%)
Contract # 04093666
Totals 1360458.79 67376.73 657542.28 48.3

CountyHARRIS
Highway FM 529
From GREEN HOUSE ROAD
To FRY ROAD
CSJ 1006-01-058
Proj ID STP 2009(671)MM
Work Type GR, STRS, BASE AND SURF
 
1.485 8936871.99 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-16-09
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 516
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
HASSELL CONSTRUCTION COMPANY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1006-01-058
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08093007
Totals 8936871.99 0.00 0.00 0.0

CountyFORT BEND
Highway FM 1092
From AT CARTWRIGHT RD
To .
CSJ 1257-01-044
Proj ID CM 2009(377)ES
Work Type RCTSS
 
1.010 2357760.55 0.00 0.00 0.0
CountyFORT BEND
Highway FM 1092
From AT LEXINGTON BLVD
To .
CSJ 1257-01-045
Proj ID CC 1257-1-45
Work Type INTERSECTION GRADE REDUCTION
 
0.100 333768.11 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 124
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
SLACK & CO. CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 1257-01-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10093010
Totals 2691528.66 0.00 0.00 0.0

CountyHARRIS
Highway FM 1093
From DAIRY ASHFORD
To IH 610
CSJ 1258-04-058
Proj ID STP 2009(554)ES
Work Type PLANING, OV
 
8.923 4459705.68 930697.45 4726367.01 99.9
Work Order 06-05-09
Work Began 08-17-09
Work Completed  
Time Computed 06-01-09
Contract Working Days 93
Addl Days Granted 0
Working Days Charged 54
Percent Time Used 58
Contractor(s)
DURWOOD GREENE CONSTRUCTION CO.
SUBCONTRACTOR(S) FOR CCSJ: 1258-04-058
INTERSTATE BARRICADES & MARKINGS, INC. (0.57%)
HIGHWAY TECHNOLOGIES, INC. (7.54%)
CURB PLANET INC. (0.02%)
BATTERSON, L.L.P.(7.52%)
CENTRAL CONSTRUCTION SERVICES, INC.(0.15%)
URETEK USA, INC. (2.61%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.15%)
Contract # 04093606
Totals 4459705.68 930697.45 4726367.01 99.9

CountyFORT BEND
Highway FM 1464
From NORTH OF FM 1093
To NORTH OF BEECHNUT STREET
CSJ 1415-02-030
Proj ID STP 2008(014)MM
Work Type GR, STRS, BASE & ACP SURF
 
4.895 24322767.58 0.00 23900402.25 94.9
CountyFORT BEND
Highway FM 1464
From CLODINE REDDICK ROAD
To S OF PECAN DRIVE
CSJ 1415-02-042
Proj ID STP 2008(015)
Work Type GR, STRS, BASE & ACP SURF
 
2.300 1654263.13 0.00 1569526.34 94.8
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 01-11-08
Work Began 02-01-08
Work Completed  
Time Computed 01-27-08
Contract Working Days 541
Addl Days Granted 0
Working Days Charged 472
Percent Time Used 87
Contractor(s)
W.W. WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 1415-02-030
CENTRAL SODDING AND HYDRO SEEDING SERVICE(2.01%)
CREACOM, INC.(7.88%)
HIGHWAY TECHNOLOGIES (0.16%)
WILLOW CITY SIGN & RAIL, INC.(0.43%)
COMEX ENVIRONMENTAL, LLC (0.43%)
SCOTT DERR PAINTING CO (0.06%)
INDUS CONSTRUCTION, L.P. (3.33%)
SILVA CONTRACTING COMPANY, INC.(9.53%)
JOE VALENCIK, INC. (1.46%)
JASSO'S SAWING & SEALING (0.53%)
EZ CURB(0.10%)
ROZCO CONTRACTING, INC.(2.18%)
W. W. FOUNDATION DRILLING, LTD.(0.78%)
OATES INDUSTRIES, INC. (0.27%)
Contract # 09073205
Totals 25977030.71 0.00 25469928.59 94.9

CountyWALLER
Highway FM 1489
From IH 10 EB FRONTAGE ROAD
To WALLER/FORT BEND C/L
CSJ 1418-01-010
Proj ID STP 2010(064)ES
Work Type SEAL COAT, OVERLAY AND PVMT MARKING
 
4.842 882610.02 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-21-09
Work Began 00-00-00
Work Completed  
Time Computed 11-06-09
Contract Working Days 36
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1418-01-010
CROSS STONES RENTALS (0.33%)
BATTERSON, L.L.P.(7.77%)
R & A TRANSPORT, INC.(4.43%)
Contract # 09093040
Totals 882610.02 0.00 0.00 0.0

CountyBRAZORIA
Highway SH 332
From 0.373 MI N OF THIS WAY STREET
To 0.196 MI S OF THIS WAY STREET
CSJ 1524-01-041
Proj ID NH 2009(399)
Work Type GR, STRS, LTS, CSB & CONC PAVT
 
4.735 63360228.52 2929390.91 14698617.87 23.1
Work Order 05-06-09
Work Began 06-22-09
Work Completed  
Time Computed 05-22-09
Contract Working Days 963
Addl Days Granted 0
Working Days Charged 108
Percent Time Used 11
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-041
VAQUERO CONSTRUCTION, INC. (0.65%)
CURB PLANET INC. (0.07%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (2.96%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.39%)
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.69%)
EROSION CONTROL, INC.(0.72%)
SCOTT DERR PAINTING CO (0.61%)
JOE VALENCIK, INC. (0.41%)
INDUS CONSTRUCTION, L.P. ( 10.64%)
TREVCON, INC.(0.51%)
Contract # 03093226
Totals 63360228.52 2929390.91 14698617.87 23.1

CountyBRAZORIA
Highway SH 332
From CAMP STREET
To 1.4 MI. E. OF FM 521
CSJ 1524-01-065
Proj ID DMO 2004(816)
Work Type GR, STR, WIDE, BASE & PAVE
 
2.370 45553740.56 625846.18 38337943.77 84.1
Work Order 08-15-07
Work Began 08-31-07
Work Completed  
Time Computed 08-31-07
Contract Working Days 1,153
Addl Days Granted 0
Working Days Charged 599
Percent Time Used 51
Contractor(s)
W.W. WEBBER, LLC
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-065
EROSION CONTROL, INC.(0.36%)
HOUSTON CURB COMPANY, INC. (0.09%)
INDUS CONSTRUCTION, L.P. (1.02%)
PRIMATE CONSTRUCTION, INC. (0.13%)
SILVA CONTRACTING COMPANY, INC.(4.01%)
TONY A. ENTERPRISES, INC.(0.23%)
TRAFFIC SYSTEMS CONSTRUCTION, INC. (1.09%)
HIGHWAY TECHNOLOGIES (0.20%)
COX PAVING COMPANY, L.P. (0.89%)
TEXAS EROSION CONTROL(0.02%)
THOMAS TRACTOR WORKS, INC. (0.18%)
M & M INDUSTRIAL PAINTING(0.63%)
J.H. PAINTING COMPANY(0.05%)
A. H. BECK FOUNDATION CO., INC.(1.73%)
EZ CURB(0.07%)
WILLOW CITY SIGN & RAIL, INC.(0.23%)
CHOCTAW ERECTORS, INC. (3.19%)
Contract # 07073202
Totals 45553740.56 625846.18 38337943.77 84.1

CountyGALVESTON
Highway FM 1764
From AT WILLOW STREET EXTENSION
To .
CSJ 1607-01-029
Proj ID STP 2009(704)ES
Work Type G / S, CONC PVMT, RET WALL
 
1.061 10442568.18 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 315
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
LONE STAR ROAD CONSTRUCTION, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 1607-01-029
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 10093202
Totals 10442568.18 0.00 0.00 0.0