| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS ON US 290 |
| To |
. |
| CSJ |
0912-72-208 |
| Proj ID |
NH 2009(881) |
| Work Type |
TSM IMPROVEMENTS |
| |
|
4.960 |
2568232.67 |
0.00 |
0.00 |
0.0 |
| Work Order |
10-14-09 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
10-30-09 |
| Contract Working Days |
116 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ROZCO CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-208 BATTERSON, L.L.P.(3.32%) PFEIFFER & SON LTD.(9.99%) WILLOW CITY SIGN & RAIL, INC.(2.10%)
|
| Contract # |
08093219 |
|
Totals |
2568232.67 |
0.00 |
0.00 |
0.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VAR LOCATIONS INSIDE HARRIS COUNTY |
| To |
. |
| CSJ |
0912-72-210 |
| Proj ID |
STP 2009(366) |
| Work Type |
PAVEMENT MARKINGS |
| |
|
0.001 |
438387.10 |
0.00 |
397733.89 |
90.7 |
| Work Order |
04-09-09 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
04-25-09 |
| Contract Working Days |
180 |
| Addl Days Granted |
0 |
| Working Days Charged |
31 |
| Percent Time Used |
17 |
| Contractor(s) |
| BATTERSON, L.L.P. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-210 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
03093012 |
|
Totals |
438387.10 |
0.00 |
397733.89 |
90.7 |
|
| County | GALVESTON |
| Highway |
CS |
| From |
OLEANDER DR AT DRAINAGE DITCH |
| To |
. |
| CSJ |
0912-73-080 |
| Proj ID |
BR 99(728) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.061 |
436567.38 |
1882.91 |
395070.24 |
96.1 |
| Work Order |
10-10-08 |
| Work Began |
05-21-09 |
| Work Completed |
|
| Time Computed |
10-26-08 |
| Contract Working Days |
72 |
| Addl Days Granted |
0 |
| Working Days Charged |
121 |
| Percent Time Used |
168 |
| Contractor(s) |
| TEXAS STERLING CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-080 SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (1.98%) KOSSMAN CONTRACTING COMPANY(0.85%) WORK ZONE PRODUCTS, INC. (0.17%) BREDA COMPANY, INC.(0.98%) EMBARK (0.79%)
|
| Contract # |
09083223 |
|
Totals |
436567.38 |
1882.91 |
395070.24 |
96.1 |
|
| County | GALVESTON |
| Highway |
CS |
| From |
AT PORT OF GALVESTON - 20TH STREET |
| To |
22ND STREET ALONG THE GALVESTON RR |
| CSJ |
0912-73-082 |
| Proj ID |
STP 2000(587)TE |
| Work Type |
PEDES BARR FENCING, LANDSCP & IRRIGA |
| |
|
0.132 |
223778.85 |
0.00 |
213529.35 |
95.4 |
| Work Order |
09-12-08 |
| Work Began |
01-07-09 |
| Work Completed |
|
| Time Computed |
09-28-08 |
| Contract Working Days |
58 |
| Addl Days Granted |
0 |
| Working Days Charged |
42 |
| Percent Time Used |
72 |
| Contractor(s) |
| TEXAS TREE & LANDSCAPE, LTD |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-082 SOUTHWESTERN ROAD BORING (0.44%)
|
| Contract # |
10073215 |
|
Totals |
223778.85 |
0.00 |
213529.35 |
95.4 |
|
| County | GALVESTON |
| Highway |
CS |
| From |
ON BROADWAY, FROM 59TH STREET |
| To |
6TH STREET |
| CSJ |
0912-73-083 |
| Proj ID |
STP 2000(588)TE |
| Work Type |
LANDSCAPING BEAUTIFICATION |
| |
|
3.820 |
1125442.18 |
2275.50 |
1224026.55 |
99.9 |
| Work Order |
01-10-08 |
| Work Began |
02-13-08 |
| Work Completed |
|
| Time Computed |
01-26-08 |
| Contract Working Days |
220 |
| Addl Days Granted |
0 |
| Working Days Charged |
168 |
| Percent Time Used |
76 |
| Contractor(s) |
| BOYER, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-083 LONE STAR TRAFFIC SERVICE, INC.(0.83%) DEMAC & COMPANY(4.97%) R & A BORING COMPANY (5.39%) MIKELS CONSTRUCTION CO., INC.(5.39%)
|
| Contract # |
12073204 |
|
Totals |
1125442.18 |
2275.50 |
1224026.55 |
99.9 |
|
| County | GALVESTON |
| Highway |
VA |
| From |
FM 518, FM 2094 |
| To |
SH 146 |
| CSJ |
0912-73-115 |
| Proj ID |
STP 2010(062) |
| Work Type |
3 DETENTION PONDS |
| |
|
0.001 |
628620.07 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-02-09 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-18-09 |
| Contract Working Days |
72 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SLACK & CO. CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-115 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09093037 |
|
Totals |
628620.07 |
0.00 |
0.00 |
0.0 |
|
| County | GALVESTON |
| Highway |
VA |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
0912-73-131 |
| Proj ID |
STP 2010(063)ES |
| Work Type |
FULL DEPTH CONC REPR |
| |
|
26.808 |
442388.58 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
75 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-131 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10093037 |
|
Totals |
442388.58 |
0.00 |
0.00 |
0.0 |
|
| County | BRAZORIA |
| Highway |
FM 865 |
| From |
SOUTH OF HARRIS COUNTY LINE |
| To |
FM 518 |
| CSJ |
0976-02-085 |
| Proj ID |
STP 2009(283) |
| Work Type |
GR, BS & SURF |
| |
|
1.915 |
13267224.77 |
487840.02 |
5914317.08 |
44.5 |
| County | BRAZORIA |
| Highway |
FM 865 |
| From |
SOUTH OF HARRIS COUNTY LINE |
| To |
FM 518 |
| CSJ |
0976-02-087 |
| Proj ID |
RW 976-2-87 |
| Work Type |
ROW ACQ. AND UTL. ADJ. |
| |
|
0.001 |
394560.47 |
0.00 |
212629.35 |
53.8 |
| Work Order |
04-09-09 |
| Work Began |
05-05-09 |
| Work Completed |
|
| Time Computed |
04-25-09 |
| Contract Working Days |
459 |
| Addl Days Granted |
0 |
| Working Days Charged |
152 |
| Percent Time Used |
33 |
| Contractor(s) |
| HASSELL CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0976-02-085 HIGHWAY TECHNOLOGIES (1.51%) GMJ PAVING CO. (4.67%) PROTECTIVE ENVIRONMENTAL STRATEGIES, INC.(0.70%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.27%) CREACOM, INC.(6.36%) CHERRY CRUSHED CONCRETE(4.42%) SPECIALTY DRILLING (0.58%) SCOTT DERR PAINTING CO (0.00%) BECO CONSTRUCTION, L.L.C.(0.21%) NBG CONSTRUCTORS, INC. ( 17.22%) MAGNUM TUNNELING, LLC(0.10%) MICKIE SERVICE, INC. (0.01%)
|
| Contract # |
02093201 |
|
Totals |
13661785.24 |
487840.02 |
6126946.43 |
44.8 |
|
| County | GALVESTON |
| Highway |
FM 1266 |
| From |
FM 517 |
| To |
FM 646 |
| CSJ |
0976-05-025 |
| Proj ID |
STP 2009(036) |
| Work Type |
REP BS & SL CT |
| |
|
2.010 |
339577.59 |
0.00 |
442258.49 |
99.9 |
| Work Order |
10-09-08 |
| Work Began |
11-03-08 |
| Work Completed |
|
| Time Computed |
10-25-08 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
51 |
| Percent Time Used |
85 |
| Contractor(s) |
| FORDE CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0976-05-025 INTERSTATE BARRICADES & MARKINGS, INC. (1.47%)
|
| Contract # |
09083020 |
|
Totals |
339577.59 |
0.00 |
442258.49 |
99.9 |
|
| County | HARRIS |
| Highway |
NASA 1 |
| From |
IH 45 |
| To |
0.60 KM E OF FM 270 |
| CSJ |
0981-01-086 |
| Proj ID |
NH 2004(76) |
| Work Type |
GR, BASE, CRCP, STR, STM SWR, LTG, SIGN, P |
| |
|
5.507 |
40667675.35 |
17707.25 |
41171323.25 |
99.9 |
| Work Order |
08-05-04 |
| Work Began |
08-23-04 |
| Work Completed |
|
| Time Computed |
08-21-04 |
| Contract Working Days |
732 |
| Addl Days Granted |
472 |
| Working Days Charged |
1,135 |
| Percent Time Used |
94 |
| Contractor(s) |
| ST. PAUL FIRE AND MARINE INSURANCE COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0981-01-086 BATTERSON, L.L.P.(1.28%) INDUS CONSTRUCTION, L.P. (1.50%) KENMOR ELECTRIC COMPANY, L.P.(5.66%) HAYWARD BAKER, INC.(0.76%) NORTHWEST MATERIALS(0.12%) BORING & TUNNELING COMPANY OF AMERI(0.34%) EROSION CONTROL, INC.(0.24%) EL DORADO PAVING COMPANY, INC. (0.78%) PRIMATE CONSTRUCTION, INC. (0.33%) SCOTT DERR PAINTING CO (0.30%) STOMPER DEMOLITION (0.54%) TARTAGLIA CONSTRUCTION, INC. (0.09%) WILLOW CITY SIGN & RAIL, INC.(0.47%) TEXAS CUTTING & CORING, INC. (0.08%) ABER FENCE & SUPPLY CO., INC.(0.05%)
|
| Contract # |
04043001 |
|
Totals |
40667675.35 |
17707.25 |
41171323.25 |
99.9 |
|
| County | HARRIS |
| Highway |
NASA 1 |
| From |
IH 45 |
| To |
SH 146 |
| CSJ |
0981-01-102 |
| Proj ID |
CM 2008(837) |
| Work Type |
INSTALL CTMS |
| |
|
7.964 |
3356949.75 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
11-06-09 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-22-09 |
| Contract Working Days |
375 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0981-01-102 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
09093210 |
|
Totals |
3356949.75 |
0.00 |
0.00 |
0.0 |
|
| County | BRAZORIA |
| Highway |
FM 524 |
| From |
FM1301 |
| To |
LOOP 419 |
| CSJ |
1004-02-014 |
| Proj ID |
STP 2009(547)ES |
| Work Type |
ASPH O / L & PAV MRKS |
| |
|
11.799 |
1360458.79 |
-67376.73 |
657542.28 |
48.3 |
| Work Order |
06-02-09 |
| Work Began |
07-21-09 |
| Work Completed |
|
| Time Computed |
06-18-09 |
| Contract Working Days |
77 |
| Addl Days Granted |
0 |
| Working Days Charged |
76 |
| Percent Time Used |
98 |
| Contractor(s) |
| DURWOOD GREENE CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 1004-02-014 BATTERSON, L.L.P.(9.90%) COX PAVING COMPANY, L.P. (2.97%) CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.(1.19%)
|
| Contract # |
04093666 |
|
Totals |
1360458.79 |
67376.73 |
657542.28 |
48.3 |
|
| County | HARRIS |
| Highway |
FM 529 |
| From |
GREEN HOUSE ROAD |
| To |
FRY ROAD |
| CSJ |
1006-01-058 |
| Proj ID |
STP 2009(671)MM |
| Work Type |
GR, STRS, BASE AND SURF |
| |
|
1.485 |
8936871.99 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-16-09 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
516 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HASSELL CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1006-01-058 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08093007 |
|
Totals |
8936871.99 |
0.00 |
0.00 |
0.0 |
|
| County | FORT BEND |
| Highway |
FM 1092 |
| From |
AT CARTWRIGHT RD |
| To |
. |
| CSJ |
1257-01-044 |
| Proj ID |
CM 2009(377)ES |
| Work Type |
RCTSS |
| |
|
1.010 |
2357760.55 |
0.00 |
0.00 |
0.0 |
| County | FORT BEND |
| Highway |
FM 1092 |
| From |
AT LEXINGTON BLVD |
| To |
. |
| CSJ |
1257-01-045 |
| Proj ID |
CC 1257-1-45 |
| Work Type |
INTERSECTION GRADE REDUCTION |
| |
|
0.100 |
333768.11 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
124 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SLACK & CO. CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1257-01-044 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10093010 |
|
Totals |
2691528.66 |
0.00 |
0.00 |
0.0 |
|
| County | HARRIS |
| Highway |
FM 1093 |
| From |
DAIRY ASHFORD |
| To |
IH 610 |
| CSJ |
1258-04-058 |
| Proj ID |
STP 2009(554)ES |
| Work Type |
PLANING, OV |
| |
|
8.923 |
4459705.68 |
930697.45 |
4726367.01 |
99.9 |
| Work Order |
06-05-09 |
| Work Began |
08-17-09 |
| Work Completed |
|
| Time Computed |
06-01-09 |
| Contract Working Days |
93 |
| Addl Days Granted |
0 |
| Working Days Charged |
54 |
| Percent Time Used |
58 |
| Contractor(s) |
| DURWOOD GREENE CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 1258-04-058 INTERSTATE BARRICADES & MARKINGS, INC. (0.57%) HIGHWAY TECHNOLOGIES, INC. (7.54%) CURB PLANET INC. (0.02%) BATTERSON, L.L.P.(7.52%) CENTRAL CONSTRUCTION SERVICES, INC.(0.15%) URETEK USA, INC. (2.61%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.15%)
|
| Contract # |
04093606 |
|
Totals |
4459705.68 |
930697.45 |
4726367.01 |
99.9 |
|
| County | FORT BEND |
| Highway |
FM 1464 |
| From |
NORTH OF FM 1093 |
| To |
NORTH OF BEECHNUT STREET |
| CSJ |
1415-02-030 |
| Proj ID |
STP 2008(014)MM |
| Work Type |
GR, STRS, BASE & ACP SURF |
| |
|
4.895 |
24322767.58 |
0.00 |
23900402.25 |
94.9 |
| County | FORT BEND |
| Highway |
FM 1464 |
| From |
CLODINE REDDICK ROAD |
| To |
S OF PECAN DRIVE |
| CSJ |
1415-02-042 |
| Proj ID |
STP 2008(015) |
| Work Type |
GR, STRS, BASE & ACP SURF |
| |
|
2.300 |
1654263.13 |
0.00 |
1569526.34 |
94.8 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-11-08 |
| Work Began |
02-01-08 |
| Work Completed |
|
| Time Computed |
01-27-08 |
| Contract Working Days |
541 |
| Addl Days Granted |
0 |
| Working Days Charged |
472 |
| Percent Time Used |
87 |
| Contractor(s) |
| W.W. WEBBER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1415-02-030 CENTRAL SODDING AND HYDRO SEEDING SERVICE(2.01%) CREACOM, INC.(7.88%) HIGHWAY TECHNOLOGIES (0.16%) WILLOW CITY SIGN & RAIL, INC.(0.43%) COMEX ENVIRONMENTAL, LLC (0.43%) SCOTT DERR PAINTING CO (0.06%) INDUS CONSTRUCTION, L.P. (3.33%) SILVA CONTRACTING COMPANY, INC.(9.53%) JOE VALENCIK, INC. (1.46%) JASSO'S SAWING & SEALING (0.53%) EZ CURB(0.10%) ROZCO CONTRACTING, INC.(2.18%) W. W. FOUNDATION DRILLING, LTD.(0.78%) OATES INDUSTRIES, INC. (0.27%)
|
| Contract # |
09073205 |
|
Totals |
25977030.71 |
0.00 |
25469928.59 |
94.9 |
|
| County | WALLER |
| Highway |
FM 1489 |
| From |
IH 10 EB FRONTAGE ROAD |
| To |
WALLER/FORT BEND C/L |
| CSJ |
1418-01-010 |
| Proj ID |
STP 2010(064)ES |
| Work Type |
SEAL COAT, OVERLAY AND PVMT MARKING |
| |
|
4.842 |
882610.02 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
10-21-09 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-06-09 |
| Contract Working Days |
36 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ANGEL BROTHERS ENTERPRISES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1418-01-010 CROSS STONES RENTALS (0.33%) BATTERSON, L.L.P.(7.77%) R & A TRANSPORT, INC.(4.43%)
|
| Contract # |
09093040 |
|
Totals |
882610.02 |
0.00 |
0.00 |
0.0 |
|
| County | BRAZORIA |
| Highway |
SH 332 |
| From |
0.373 MI N OF THIS WAY STREET |
| To |
0.196 MI S OF THIS WAY STREET |
| CSJ |
1524-01-041 |
| Proj ID |
NH 2009(399) |
| Work Type |
GR, STRS, LTS, CSB & CONC PAVT |
| |
|
4.735 |
63360228.52 |
2929390.91 |
14698617.87 |
23.1 |
| Work Order |
05-06-09 |
| Work Began |
06-22-09 |
| Work Completed |
|
| Time Computed |
05-22-09 |
| Contract Working Days |
963 |
| Addl Days Granted |
0 |
| Working Days Charged |
108 |
| Percent Time Used |
11 |
| Contractor(s) |
| WILLIAMS BROTHERS CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-041 VAQUERO CONSTRUCTION, INC. (0.65%) CURB PLANET INC. (0.07%) TRAFFIC SYSTEMS CONSTRUCTION, INC. (2.96%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.39%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.69%) EROSION CONTROL, INC.(0.72%) SCOTT DERR PAINTING CO (0.61%) JOE VALENCIK, INC. (0.41%) INDUS CONSTRUCTION, L.P. ( 10.64%) TREVCON, INC.(0.51%)
|
| Contract # |
03093226 |
|
Totals |
63360228.52 |
2929390.91 |
14698617.87 |
23.1 |
|
| County | BRAZORIA |
| Highway |
SH 332 |
| From |
CAMP STREET |
| To |
1.4 MI. E. OF FM 521 |
| CSJ |
1524-01-065 |
| Proj ID |
DMO 2004(816) |
| Work Type |
GR, STR, WIDE, BASE & PAVE |
| |
|
2.370 |
45553740.56 |
625846.18 |
38337943.77 |
84.1 |
| Work Order |
08-15-07 |
| Work Began |
08-31-07 |
| Work Completed |
|
| Time Computed |
08-31-07 |
| Contract Working Days |
1,153 |
| Addl Days Granted |
0 |
| Working Days Charged |
599 |
| Percent Time Used |
51 |
| Contractor(s) |
| W.W. WEBBER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 1524-01-065 EROSION CONTROL, INC.(0.36%) HOUSTON CURB COMPANY, INC. (0.09%) INDUS CONSTRUCTION, L.P. (1.02%) PRIMATE CONSTRUCTION, INC. (0.13%) SILVA CONTRACTING COMPANY, INC.(4.01%) TONY A. ENTERPRISES, INC.(0.23%) TRAFFIC SYSTEMS CONSTRUCTION, INC. (1.09%) HIGHWAY TECHNOLOGIES (0.20%) COX PAVING COMPANY, L.P. (0.89%) TEXAS EROSION CONTROL(0.02%) THOMAS TRACTOR WORKS, INC. (0.18%) M & M INDUSTRIAL PAINTING(0.63%) J.H. PAINTING COMPANY(0.05%) A. H. BECK FOUNDATION CO., INC.(1.73%) EZ CURB(0.07%) WILLOW CITY SIGN & RAIL, INC.(0.23%) CHOCTAW ERECTORS, INC. (3.19%)
|
| Contract # |
07073202 |
|
Totals |
45553740.56 |
625846.18 |
38337943.77 |
84.1 |
|
| County | GALVESTON |
| Highway |
FM 1764 |
| From |
AT WILLOW STREET EXTENSION |
| To |
. |
| CSJ |
1607-01-029 |
| Proj ID |
STP 2009(704)ES |
| Work Type |
G / S, CONC PVMT, RET WALL |
| |
|
1.061 |
10442568.18 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
315 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| LONE STAR ROAD CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 1607-01-029 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10093202 |
|
Totals |
10442568.18 |
0.00 |
0.00 |
0.0 |
|