| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS DISTRICTWIDE |
| To |
. |
| CSJ |
0912-00-420 |
| Proj ID |
STP 2013(322) |
| Work Type |
NEW TRAFFIC SIGNALS |
| |
|
0.001 |
1899903.95 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
03-20-13 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
525 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| STATEWIDE TRAFFIC SIGNAL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-420 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
01133213 |
|
Totals |
1899903.95 |
0.00 |
0.00 |
0.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS DISTRICTWIDE |
| To |
. |
| CSJ |
0912-00-455 |
| Proj ID |
NH 1102(144) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
0.001 |
1441141.70 |
9518.37 |
975577.43 |
67.6 |
| Work Order |
09-06-11 |
| Work Began |
09-22-11 |
| Work Completed |
|
| Time Computed |
09-22-11 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
45 |
| Percent Time Used |
100 |
| Contractor(s) |
| BOYER, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-455 CONROE WOOD PRODUCTS INC.(1.76%) ENVIRONMENTAL ALLIES, L.P. (0.87%) LOPEZ BROTHERS ENTERPRISES, INC. (1.48%)
|
| Contract # |
07113215 |
|
Totals |
1441141.70 |
9518.37 |
975577.43 |
67.6 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS ON IH 45 |
| To |
. |
| CSJ |
0912-00-468 |
| Proj ID |
IM 0451(341) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
52.668 |
1130845.26 |
2435.61 |
748629.46 |
66.2 |
| Work Order |
05-15-12 |
| Work Began |
06-15-12 |
| Work Completed |
|
| Time Computed |
07-15-12 |
| Contract Working Days |
105 |
| Addl Days Granted |
45 |
| Working Days Charged |
130 |
| Percent Time Used |
86 |
| Contractor(s) |
| BIO LANDSCAPE & MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-468 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04123018 |
|
Totals |
1130845.26 |
2435.61 |
748629.46 |
66.2 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS DISTRICTWIDE |
| To |
ALL LOCATIONS ON US 59 & IH 610 |
| CSJ |
0912-00-469 |
| Proj ID |
NH 2012(513) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
0.001 |
778293.17 |
760.67 |
457456.95 |
58.7 |
| Work Order |
06-11-12 |
| Work Began |
06-15-12 |
| Work Completed |
|
| Time Computed |
06-27-12 |
| Contract Working Days |
90 |
| Addl Days Granted |
75 |
| Working Days Charged |
139 |
| Percent Time Used |
84 |
| Contractor(s) |
| BIO LANDSCAPE & MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-469 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05123222 |
|
Totals |
778293.17 |
760.67 |
457456.95 |
58.7 |
|
| County | BRAZORIA |
| Highway |
CS |
| From |
DIXIE FARM RD FROM SH 35 |
| To |
1500 FT S OF FM 518 |
| CSJ |
0912-31-108 |
| Proj ID |
STP 99(546)MM |
| Work Type |
WIDEN TO 4 LANES |
| |
|
2.173 |
12512243.81 |
0.00 |
12393989.21 |
99.9 |
| County | BRAZORIA |
| Highway |
CS |
| From |
DIXIE FARM ROAD FROM HARRIS COUNTY |
| To |
SH 35 |
| CSJ |
0912-31-144 |
| Proj ID |
STP 2004(215)MM |
| Work Type |
ACQUISITION AND UTILITIES |
| |
|
3.800 |
124811.82 |
0.00 |
133719.32 |
99.9 |
| Work Order |
04-09-09 |
| Work Began |
04-25-09 |
| Work Completed |
|
| Time Computed |
04-25-09 |
| Contract Working Days |
489 |
| Addl Days Granted |
0 |
| Working Days Charged |
574 |
| Percent Time Used |
117 |
| Contractor(s) |
| HASSELL CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-108 HIGHWAY TECHNOLOGIES, INC. (1.54%) NBG CONSTRUCTORS, INC. (7.22%) SCOTT DERR PAINTING CO (0.00%) TOM-MAC, INC.(0.66%) REDDICO CONSTRUCTION CO., INC. (8.86%) PROTECTIVE ENVIRONMENTAL STRATEGIES, INC.(3.50%) GMJ PAVING CO. (5.61%) HUBCO, INC.(1.83%) CREACOM, INC.(3.60%) BECO CONSTRUCTION, L.L.C.(7.05%) FLORES CURBS (0.15%) OATES INDUSTRIES, INC. (0.11%) SPECIALTY DRILLING (0.17%) GULF COAST PAVERS, INC.(1.08%) HIGHWAY PAVEMENT SPECIALTIES, INC. (0.33%) JMHP, INC. (0.12%) BIO LANDSCAPE & MAINTENANCE, INC.(1.08%)
|
| Contract # |
02093202 |
|
Totals |
12637055.63 |
0.00 |
12527708.53 |
99.9 |
|
| County | BRAZORIA |
| Highway |
CR |
| From |
CR 54 AT CHOC BYU WATER CO CANAL |
| To |
. |
| CSJ |
0912-31-164 |
| Proj ID |
BR 2006(322) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.208 |
815348.60 |
2402.61 |
801805.05 |
100.0 |
| Work Order |
02-28-12 |
| Work Began |
03-26-12 |
| Work Completed |
05-07-13 |
| Time Computed |
03-15-12 |
| Contract Working Days |
171 |
| Addl Days Granted |
0 |
| Working Days Charged |
166 |
| Percent Time Used |
97 |
| Contractor(s) |
| TOM-MAC, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-164 HIGHWAY TECHNOLOGIES, INC. (0.88%) SILVA CONTRACTING COMPANY, INC.( 10.86%) REGIONAL TRAFFIC SERVICES, LLC (0.57%) KOSSMAN CONTRACTING COMPANY(1.19%) SCMU (8.94%)
|
| Contract # |
01123207 |
|
Totals |
815348.60 |
2402.61 |
801805.05 |
100.0 |
|
| County | BRAZORIA |
| Highway |
CR |
| From |
CR 541 AT CHIGGER CREEK |
| To |
. |
| CSJ |
0912-31-171 |
| Proj ID |
BR 2006(329) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.183 |
789069.67 |
0.00 |
778426.15 |
100.0 |
| Work Order |
08-10-11 |
| Work Began |
09-19-11 |
| Work Completed |
05-07-13 |
| Time Computed |
08-26-11 |
| Contract Working Days |
179 |
| Addl Days Granted |
0 |
| Working Days Charged |
180 |
| Percent Time Used |
100 |
| Contractor(s) |
| JOHN REED AND COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-171 HIGHWAY TECHNOLOGIES, INC. (0.82%) REGIONAL TRAFFIC SERVICES, LLC (0.55%) SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (2.64%) W. W. FOUNDATION DRILLING, LTD.(2.28%)
|
| Contract # |
07113005 |
|
Totals |
789069.67 |
0.00 |
778426.15 |
100.0 |
|
| County | BRAZORIA |
| Highway |
CS |
| From |
CR 149 AT MUSTANG BAYOU |
| To |
. |
| CSJ |
0912-31-203 |
| Proj ID |
BR 2008(059) |
| Work Type |
REPL BR & APPRS |
| |
|
0.288 |
2748072.00 |
184801.14 |
816628.40 |
29.7 |
| Work Order |
09-17-12 |
| Work Began |
11-26-12 |
| Work Completed |
|
| Time Computed |
11-16-12 |
| Contract Working Days |
270 |
| Addl Days Granted |
0 |
| Working Days Charged |
64 |
| Percent Time Used |
23 |
| Contractor(s) |
| MENADE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-203 W. W. FOUNDATION DRILLING, LTD.(9.86%) ENVIRONMENTAL ALLIES, L.P. (0.77%)
|
| Contract # |
07123007 |
|
Totals |
2748072.00 |
184801.14 |
816628.40 |
29.7 |
|
| County | BRAZORIA |
| Highway |
VA |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
0912-31-211 |
| Proj ID |
STP 2013(125) |
| Work Type |
MBGF UPGRADES |
| |
|
0.001 |
422144.20 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
35 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| TEXAS HIGHWAY MAINTENANCE, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-211 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133207 |
|
Totals |
422144.20 |
0.00 |
0.00 |
0.0 |
|
| County | BRAZORIA |
| Highway |
CS |
| From |
NORTH 2ND STREET AT MUSTANG BAYOU |
| To |
. |
| CSJ |
0912-31-237 |
| Proj ID |
BR 2010(723) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.126 |
766156.52 |
0.00 |
403426.71 |
52.6 |
| Work Order |
08-01-12 |
| Work Began |
09-17-12 |
| Work Completed |
|
| Time Computed |
09-17-12 |
| Contract Working Days |
113 |
| Addl Days Granted |
0 |
| Working Days Charged |
65 |
| Percent Time Used |
57 |
| Contractor(s) |
| TOM-MAC, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-237 REPUBLIC TRAFFIC SAFETY, INC.(0.26%) KOSSMAN CONTRACTING CO., INC.(2.07%) ROADSAFE TRAFFIC SYSTEMS, INC. (1.05%) GMJ PAVING CO. (7.38%) KATY CONSTRUCTION(2.34%)
|
| Contract # |
06123205 |
|
Totals |
766156.52 |
0.00 |
403426.71 |
52.6 |
|
| County | BRAZORIA |
| Highway |
CS |
| From |
CR 48 AT W FORK CHOC BAYOU |
| To |
. |
| CSJ |
0912-31-264 |
| Proj ID |
BR 2011(676) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.073 |
424008.36 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
60 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARANDA BROTHERS CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-264 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133005 |
|
Totals |
424008.36 |
0.00 |
0.00 |
0.0 |
|
| County | BRAZORIA |
| Highway |
CR |
| From |
COUNTY ROAD 220; SH 288 |
| To |
FM 523 |
| CSJ |
0912-31-275 |
| Proj ID |
STP 2012(711) |
| Work Type |
PVMT, GR & STRS |
| |
|
3.694 |
15980617.35 |
871093.73 |
884613.73 |
5.5 |
| Work Order |
03-06-13 |
| Work Began |
03-19-13 |
| Work Completed |
|
| Time Computed |
03-22-13 |
| Contract Working Days |
270 |
| Addl Days Granted |
0 |
| Working Days Charged |
28 |
| Percent Time Used |
10 |
| Contractor(s) |
| SER CONSTRUCTION PARTNERS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-31-275 LASER EARTH MOVING (0.43%) SEMARCK LANDSCAPE SERVICES, INC. (0.06%) TRAFFIC SYSTEMS CONSTRUCTION, INC. (1.03%) DURWOOD GREENE CONSTRUCTION CO.(8.05%) W. W. FOUNDATION DRILLING, LTD.(1.03%) TEXAS CONCRETE ENTERPRISE READY MIX, INC.( 10.72%)
|
| Contract # |
08123204 |
|
Totals |
15980617.35 |
871093.73 |
884613.73 |
5.5 |
|
| County | FORT BEND |
| Highway |
VA |
| From |
VARIOUS LOCATIONS COUNTYWIDE |
| To |
. |
| CSJ |
0912-34-171 |
| Proj ID |
STP 2013(126) |
| Work Type |
CIPP PIPE LINER AT CROSS CULVERTS |
| |
|
0.001 |
591980.00 |
0.00 |
589775.00 |
99.6 |
| Work Order |
11-09-12 |
| Work Began |
11-29-12 |
| Work Completed |
|
| Time Computed |
11-25-12 |
| Contract Working Days |
45 |
| Addl Days Granted |
0 |
| Working Days Charged |
33 |
| Percent Time Used |
73 |
| Contractor(s) |
| LAYNE INLINER, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-34-171 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10123017 |
|
Totals |
591980.00 |
0.00 |
589775.00 |
99.6 |
|
| County | FORT BEND |
| Highway |
CS |
| From |
STAFFORDSHIRE ROAD; 5TH ST |
| To |
SCANLIN/LEXINGTON RD |
| CSJ |
0912-34-178 |
| Proj ID |
STP 2012(734)MM |
| Work Type |
GR, STRS, BASE PV W / CURB & GUTTER |
| |
|
0.611 |
3589100.64 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
177 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| HASSELL CONSTRUCTION COMPANY, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-34-178 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
05133213 |
|
Totals |
3589100.64 |
0.00 |
0.00 |
0.0 |
|
| County | MONTGOMERY |
| Highway |
CS |
| From |
CRIGHTON ROAD AT STEWARTS CREEK |
| To |
. |
| CSJ |
0912-37-185 |
| Proj ID |
BR 2009(229) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.316 |
2237466.03 |
146447.01 |
1600095.32 |
71.5 |
| Work Order |
08-10-12 |
| Work Began |
08-27-12 |
| Work Completed |
|
| Time Computed |
08-26-12 |
| Contract Working Days |
152 |
| Addl Days Granted |
0 |
| Working Days Charged |
141 |
| Percent Time Used |
92 |
| Contractor(s) |
| LONE STAR ROAD CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-37-185 BELL BOTTOM FOUNDATION CO. (6.52%) CURB PLANET INC. (0.02%) HIGHWAY TECHNOLOGIES, INC. (0.18%) REGIONAL TRAFFIC SERVICES, LLC (0.20%) SCOTT DERR PAINTING CO, LLC(0.40%) DORAN STEEL, INC.(0.35%) ENVIRONMENTAL ALLIES, L.P. (0.51%) MESA ROD BUSTERS, INC. (1.12%) WILLOW CITY SIGN & RAIL, INC.(0.51%) MAGNOLIA SKIDROW MULCHING, LLC (0.22%) EROSION CONTROL, INC.(2.85%) GMJ PAVING CO. (8.15%) HOUSTON SAWING & DRILLING(0.16%)
|
| Contract # |
07123221 |
|
Totals |
2237466.03 |
146447.01 |
1600095.32 |
71.5 |
|
| County | MONTGOMERY |
| Highway |
CS |
| From |
WOODLANDS PKWY, E OF PANTHER CRK DR |
| To |
GROGAN'S MILL RD |
| CSJ |
0912-37-199 |
| Proj ID |
STP 2010(831)MM |
| Work Type |
GR, STRS, BASE AND PAVE |
| |
|
0.895 |
2836771.40 |
194443.43 |
438143.97 |
15.4 |
| Work Order |
10-24-12 |
| Work Began |
11-26-12 |
| Work Completed |
|
| Time Computed |
11-09-12 |
| Contract Working Days |
246 |
| Addl Days Granted |
0 |
| Working Days Charged |
85 |
| Percent Time Used |
34 |
| Contractor(s) |
| MENADE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-37-199 W. W. FOUNDATION DRILLING, LTD.(3.75%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(1.86%) HIGHWAY TECHNOLOGIES, INC. (1.42%) A BROTHERS MILLING, LLC(0.90%) CURB PLANET INC. (0.10%) YORK & YORK FOUNDATION DRILLING, INC.(1.50%) DAVID GALA DBA GALAXY FENCE(0.54%) M & D FOUNDATION DRILLING INDUSTRIES, INC. (4.70%) MESA ROD BUSTERS, INC. (0.14%)
|
| Contract # |
08123031 |
|
Totals |
2836771.40 |
194443.43 |
438143.97 |
15.4 |
|
| County | MONTGOMERY |
| Highway |
CR |
| From |
HARDIN STORE RD AT DECKER BRANCH |
| To |
. |
| CSJ |
0912-37-205 |
| Proj ID |
BR 2010(685) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.085 |
856575.10 |
19410.00 |
884127.30 |
100.0 |
| Work Order |
06-18-12 |
| Work Began |
08-01-12 |
| Work Completed |
04-23-13 |
| Time Computed |
07-04-12 |
| Contract Working Days |
143 |
| Addl Days Granted |
0 |
| Working Days Charged |
148 |
| Percent Time Used |
103 |
| Contractor(s) |
| JOHN REED AND COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-37-205 ODUM SERVICES, L.P.(1.60%) HIGHWAY TECHNOLOGIES, INC. (0.56%) REGIONAL TRAFFIC SERVICES, LLC (1.31%) AFFORDABLE EROSION (0.65%) KOSSMAN CONTRACTING CO., INC.(0.72%) GARNER PAVING & CONSTRUCTION, LTD. (0.52%) KELLYSTONE, INC(0.00%)
|
| Contract # |
05123051 |
|
Totals |
856575.10 |
19410.00 |
884127.30 |
100.0 |
|
| County | MONTGOMERY |
| Highway |
CR |
| From |
LEXINGTON DR AT CARTERS SLOUGH |
| To |
. |
| CSJ |
0912-37-206 |
| Proj ID |
BR 2010(686) |
| Work Type |
REPLACE BRIDGE AND APPROACHES |
| |
|
0.123 |
561550.95 |
139228.85 |
394804.60 |
70.3 |
| Work Order |
11-30-12 |
| Work Began |
01-23-13 |
| Work Completed |
|
| Time Computed |
01-23-13 |
| Contract Working Days |
107 |
| Addl Days Granted |
0 |
| Working Days Charged |
56 |
| Percent Time Used |
52 |
| Contractor(s) |
| JOHN REED AND COMPANY, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-37-206 HIGHWAY TECHNOLOGIES, INC. (1.07%) REGIONAL TRAFFIC SERVICES LLC(0.52%) JMHP, INC. (4.51%) GARNER PAVING & CONSTRUCTION, LTD. (1.60%) KOSSMAN CONTRACTING CO., INC.(1.88%) CPAVE, INC.(0.22%)
|
| Contract # |
11123017 |
|
Totals |
561550.95 |
139228.85 |
394804.60 |
70.3 |
|
| County | HARRIS |
| Highway |
VA |
| From |
BRAYS BAYOU PATH IN E HOUS(75TH ST) |
| To |
OLD SPANISH TRAIL |
| CSJ |
0912-70-077 |
| Proj ID |
STP 2011(254)TE |
| Work Type |
ENHANCEMENT PROJECT |
| |
|
2.207 |
1525267.27 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
239 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARANDA BROTHERS CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-70-077 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04133209 |
|
Totals |
1525267.27 |
0.00 |
0.00 |
0.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IH 10 AT |
| To |
US 90 INTERCHANGE ALONG IH 610 |
| CSJ |
0912-70-079 |
| Proj ID |
HP 1102(308) |
| Work Type |
LANDSCAPE DEVELOPMENT |
| |
|
5.666 |
1191334.89 |
28689.52 |
928329.38 |
77.9 |
| Work Order |
09-14-11 |
| Work Began |
09-28-11 |
| Work Completed |
|
| Time Computed |
09-30-11 |
| Contract Working Days |
90 |
| Addl Days Granted |
0 |
| Working Days Charged |
86 |
| Percent Time Used |
95 |
| Contractor(s) |
| BIO LANDSCAPE & MAINTENANCE, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-70-079 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08113243 |
|
Totals |
1191334.89 |
28689.52 |
928329.38 |
77.9 |
|