Monthly State Let Construction Report For Houston District As Of Apr 11, 2014 Page 4 Of 9

Last Update: Friday, April 11, 2014
FTP Icon
page 1 | page 2 | page 3 | page 4 | page 5 | page 6 | page 7 | page 8 | page 9

Contract Identification and Information Length Contract Amount Amount This Estimate Total Estimate To Date % Comp

CountyHARRIS
Highway IH 10
From ON ELYSIAN ST.; FROM COMMERCE ST.
To BROOKS ST.
CSJ 0508-01-276
Proj ID IM 0107(442)
Work Type REPLC BR & APPR
 
1.126 34623242.31 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 907
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
OHL USA, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-01-276
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 09133203
Totals 34623242.31 0.00 0.00 0.0

CountyHARRIS
Highway IH 10
From MERCURY
To CLOVERLEAF ST
CSJ 0508-01-332
Proj ID IM 0107(435)
Work Type HIGH MAST ILLUMINATION
 
4.100 2460155.34 127883.94 2049677.95 83.3
Work Order 04-03-13
Work Began 06-10-13
Work Completed  
Time Computed 04-19-13
Contract Working Days 220
Addl Days Granted 0
Working Days Charged 177
Percent Time Used 80
Contractor(s)
CREACOM, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-01-332
W. W. FOUNDATION DRILLING, LTD.( 11.58%)
ROADSAFE TRAFFIC SYSTEMS, INC. (0.49%)
WILLOW CITY SIGN & RAIL, INC.(3.91%)
SPECIALTY DRILLING, LTD. ( 12.39%)
Contract # 01133221
Totals 2460155.34 127883.94 2049677.95 83.3

CountyHARRIS
Highway IH 10
From ON IH 10, FROM N. WAYSIDE TO BW 8 &
To ON IH 610 AT MCCARTY
CSJ 0508-01-335
Proj ID C 508-1-335
Work Type INTERSECTION IMPROVEMENTS
 
1.150 1650456.27 32072.11 1534401.32 99.0
Work Order 11-14-12
Work Began 07-01-13
Work Completed  
Time Computed 11-30-12
Contract Working Days 64
Addl Days Granted 0
Working Days Charged 191
Percent Time Used 298
Contractor(s)
MAIN LANE INDUSTRIES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0508-01-335
TRAF-TEX, INC. ( 20.01%)
HOLES INCORPORATED (4.12%)
KOSSMAN CONTRACTING CO., INC.(0.05%)
Contract # 10123027
Totals 1650456.27 32072.11 1534401.32 99.0

CountyHARRIS
Highway IH 10
From AT MEADOW STREET
To .
CSJ 0508-01-343
Proj ID BR 1302(017)
Work Type REHABILITATION OF BRIDGE DECK
 
0.001 1881415.65 0.00 0.00 0.0
Work Order 09-23-13
Work Began 00-00-00
Work Completed  
Time Computed 01-21-14
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
ISI CONTRACTING, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-01-343
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08133058
Totals 1881415.65 0.00 0.00 0.0

CountyHARRIS
Highway IH 10
From IH 45
To CHAMBERS COUNTY LINE
CSJ 0508-01-344
Proj ID IM 0107(445)
Work Type LANDSCAPE DEVELOPMENT
 
0.001 1351369.79 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
BIO LANDSCAPE & MAINTENANCE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0508-01-344
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 04143020
Totals 1351369.79 0.00 0.00 0.0

CountyHARRIS
Highway SP 330
From EAST OF OAKLAND AVE(EB FRONTAGE RD)
To BAYWAY DR
CSJ 0508-07-281
Proj ID NH 2013(390)
Work Type BS REP, MILLING, & ACP OVERLAY
 
2.347 1510503.00 41688.19 1521336.08 99.9
Work Order 04-26-13
Work Began 06-24-13
Work Completed  
Time Computed 06-24-13
Contract Working Days 105
Addl Days Granted 0
Working Days Charged 100
Percent Time Used 95
Contractor(s)
ANGEL BROTHERS ENTERPRISES, LTD.
SUBCONTRACTOR(S) FOR CCSJ: 0508-07-281
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (8.47%)
MAIN LANE INDUSTRIES, LTD. (7.12%)
ROADSAFE TRAFFIC SYSTEMS, INC. (4.91%)
HOLES INCORPORATED (0.97%)
THIRD COAST SERVICES LLC (1.85%)
Contract # 02133027
Totals 1510503.00 41688.19 1521336.08 99.9

CountyWALLER
Highway FM 362
From AT FM 529
To .
CSJ 0523-02-044
Proj ID STP 2014(486)HES
Work Type INST FLASHING BEACON
 
0.001 109572.50 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 29
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0523-02-044
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03143031
Totals 109572.50 0.00 0.00 0.0

CountyMONTGOMERY
Highway FM 1488
From FM 149
To 0.3 MI E OF COMMUNITY RD AT MOSTYN
CSJ 0523-10-034
Proj ID C 523-10-34
Work Type CONSTRUCT RR GRADE SEPARATION
 
2.779 27649979.11 0.00 1914521.55 6.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-22-13
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 478
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JAMES CONSTRUCTION GROUP, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0523-10-034
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 07133003
Totals 27649979.11 0.00 1914521.55 6.9

CountyFORT BEND
Highway FM 1462
From BRAZORIA C/L (WEST SIDE)
To FM 762
CSJ 0543-03-070
Proj ID STP 2014(512)
Work Type BASE REP, ACP O / L, PAVE MARKS, ETC.
 
11.481 1799826.94 0.00 0.00 0.0
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 00-00-00
Work Began 00-00-00
Work Completed  
Time Computed 00-00-00
Contract Working Days 60
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
JAMES CONSTRUCTION GROUP, L.L.C.
SUBCONTRACTOR(S) FOR CCSJ: 0543-03-070
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 03143211
Totals 1799826.94 0.00 0.00 0.0

CountyMONTGOMERY
Highway IH 45
From N OF CRIGHTON RD
To LEAGUE LINE ROAD
CSJ 0675-08-071
Proj ID CM 1102(305)
Work Type INST CTMS
 
6.889 1095536.50 23985.00 1059822.04 96.7
Work Order 09-14-11
Work Began 12-10-12
Work Completed  
Time Computed 03-12-12
Contract Working Days 375
Addl Days Granted 0
Working Days Charged 374
Percent Time Used 99
Contractor(s)
TRAF-TEX, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0675-08-071
NO SUBCONTRACTORS FOR THIS CCSJ
Contract # 08113025
Totals 1095536.50 23985.00 1059822.04 96.7

CountyMONTGOMERY
Highway IH 45
From NORTH OF CALVARY
To SOUTH OF FM 830
CSJ 0675-08-084
Proj ID STP 2010(629)ES
Work Type GR, STRS, BASE AND CONC PAVE
 
5.098 57435821.47 1426538.14 56891077.87 99.0
CountyMONTGOMERY
Highway IH 45
From FM 830
To WALKER COUNTY LINE
CSJ 0675-08-093
Proj ID RW 675-8-93
Work Type ROW ACQ.
 
8.208 181827.00 0.00 78499.00 43.1
Work Order 05-07-10
Work Began 05-25-10
Work Completed  
Time Computed 05-23-10
Contract Working Days 1,177
Addl Days Granted 0
Working Days Charged 1,174
Percent Time Used 99
Contractor(s)
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
SUBCONTRACTOR(S) FOR CCSJ: 0675-08-084
JOE VALENCIK, INC. (0.94%)
SCOTT DERR PAINTING CO (0.15%)
HIGHWAY PAVEMENT SPECIALTIES, INC. (0.38%)
INDUS CONSTRUCTION, L.P. ( 14.55%)
CREATIVE LANDSCAPES OF TEXAS (1.20%)
SMITH & COMPANY( 10.78%)
L.A. UTILITIES, INC. (5.04%)
JET UNDERGROUND UTILITIES(4.78%)
INTERSTATE BARRICADES & MARKINGS, INC. (0.95%)
BORING & TUNNELING COMPANY OF AMERICA, INC.(0.17%)
VAQUERO CONSTRUCTION, INC. (0.38%)
D.L. CONDITT (0.35%)
BROOKLYN SWEEPS(0.09%)
HIGHWAY TECHNOLOGIES, INC. (0.01%)
Contract # 03103001
Totals 57617648.47 1426538.14 56969576.87 98.8

CountyMONTGOMERY
Highway IH 45
From SH 336 SOUTH LOOP
To NORTH LEAGUE LINE ROAD
CSJ 0675-08-107
Proj ID HP 2013(692)
Work Type LANDSCAPE DEVELOPMENT
 
6.300 745136.01 110085.03 491095.18 65.9
Work Order 08-26-13
Work Began 10-14-13
Work Completed  
Time Computed 10-14-13
Contract Working Days 90
Addl Days Granted 0
Working Days Charged 90
Percent Time Used 100
Contractor(s)
BIO LANDSCAPE & MAINTENANCE, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0675-08-107
CC TREE FARMS, L.L.C.(1.89%)
N-LINE TRAFFIC MAINTENANCE, L.P. (0.96%)
Contract # 05133027
Totals 745136.01 110085.03 491095.18 65.9

CountyHARRIS
Highway SH 249
From AT BOUDREAUX EASTBOUND & WESTBOUND
To .
CSJ 0720-03-126
Proj ID NH 2012(710)
Work Type ADD MEDIAN LNS & REBUILD SIGNALS
 
0.100 322274.27 0.00 24445.00 7.5
CountyMONTGOMERY
Highway FM 2978
From CONROE HUFFSMITH ROAD
To HARRIS COUNTY LINE
CSJ 3050-02-021
Proj ID STP 2012(107)
Work Type GR, STRS, BASE AND PAVE
 
0.663 743106.43 0.00 948387.39 99.9
NO CURRENT ESTIMATE AT TIME OF THIS RUN
Work Order 10-18-12
Work Began 04-15-13
Work Completed  
Time Computed 02-15-13
Contract Working Days 101
Addl Days Granted 10
Working Days Charged 111
Percent Time Used 100
Contractor(s)
TRIPLE B SERVICES, L.L.P.
SUBCONTRACTOR(S) FOR CCSJ: 3050-02-021
BATTERSON,LLP(4.23%)
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.( 19.45%)
HODGES BROTHERS, INC.(0.37%)
KOSSMAN CONTRACTING CO., INC.(2.67%)
ALLSTATE SIGNAL & CONSTRUCTION, LLC( 14.86%)
WILLOW CITY SIGN & RAIL, INC.(4.62%)
ENVIRONMENTAL ALLIES, L.P. (0.05%)
TEXAS HIGHWAY MAINTENANCE, LLC (3.67%)
SCMU (2.99%)
Contract # 08123244
Totals 1065380.70 0.00 972832.39 91.3

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-331
Proj ID CM 2008(055)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1482581.45 0.00 953292.97 64.2
Work Order 09-11-07
Work Began 04-04-08
Work Completed  
Time Computed 09-27-07
Contract Working Days 235
Addl Days Granted 0
Working Days Charged 103
Percent Time Used 43
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-331
BATTERSON, L.L.P.(1.04%)
SPRING CREEK CONSTRUCTION, INC.(4.49%)
Contract # 08073244
Totals 1482581.45 0.00 953292.97 64.2

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-335
Proj ID STP 2010(057)ES
Work Type UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
 
0.001 898349.73 0.00 927416.91 99.9
Work Order 11-16-09
Work Began 08-17-10
Work Completed  
Time Computed 08-02-10
Contract Working Days 188
Addl Days Granted 0
Working Days Charged 142
Percent Time Used 75
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-335
SPRING CREEK CONSTRUCTION, INC.(3.85%)
BATTERSON,LLP(1.16%)
Contract # 09093012
Totals 898349.73 0.00 927416.91 99.9

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-336
Proj ID STP 2011(578)G
Work Type INSTALL VIVDS AND INSTALL LOOPS
 
0.003 439963.75 0.00 101681.51 23.1
Work Order 01-06-11
Work Began 04-09-12
Work Completed  
Time Computed 01-22-11
Contract Working Days 187
Addl Days Granted 0
Working Days Charged 110
Percent Time Used 58
Contractor(s)
THIRD COAST SERVICES LLC
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-336
CURB PLANET INC. (0.11%)
Contract # 12103011
Totals 439963.75 0.00 101681.51 23.1

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-350
Proj ID CM 2009(364)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1289999.25 8238.24 1219651.88 94.5
Work Order 06-02-09
Work Began 08-12-12
Work Completed  
Time Computed 06-18-09
Contract Working Days 225
Addl Days Granted 0
Working Days Charged 197
Percent Time Used 87
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-350
CREACOM, INC.(0.04%)
SPRING CREEK CONSTRUCTION, INC.(3.15%)
HIGHWAY TECHNOLOGIES, INC. (0.76%)
KAM CONSTRUCTION, INC. (0.86%)
WALLACE CONCRETE SAWING(0.14%)
REGIONAL TRAFFIC SERVICES LLC(0.00%)
VASQUEZ CONCRETE COMPANY (0.38%)
Contract # 04093209
Totals 1289999.25 8238.24 1219651.88 94.5

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-380
Proj ID STP 2012(020)
Work Type NEW TRAFFIC SIGNALS
 
0.001 1515998.78 61237.98 1018360.96 67.1
Work Order 11-16-11
Work Began 02-13-12
Work Completed  
Time Computed 12-02-11
Contract Working Days 437
Addl Days Granted 0
Working Days Charged 182
Percent Time Used 41
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-380
BATTERSON,LLP(5.72%)
ISI CONTRACTING, INC.(6.40%)
VASQUEZ CONCRETE COMPANY (0.32%)
Contract # 09113211
Totals 1515998.78 61237.98 1018360.96 67.1

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-381
Proj ID STP 2012(021)
Work Type UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
 
0.001 1787199.58 0.00 0.00 0.0
Work Order 07-19-13
Work Began 00-00-00
Work Completed  
Time Computed 08-04-13
Contract Working Days 432
Addl Days Granted 0
Working Days Charged 0
Percent Time Used 0
Contractor(s)
STATEWIDE TRAFFIC SIGNAL COMPANY
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-381
AAA ASPHALT PAVING, INC. (3.02%)
PROFESSIONAL TRAFFIC CONTROL, LLC(2.54%)
Contract # 03133016
Totals 1787199.58 0.00 0.00 0.0

CountyHARRIS
Highway VA
From VARIOUS LOCATIONS DISTRICTWIDE
To .
CSJ 0912-00-383
Proj ID STP 2010(058)ES
Work Type UPGRADE / RECONSTRUCT TRAFFIC SIGNALS
 
0.001 946870.85 0.00 994403.10 99.9
Work Order 10-30-09
Work Began 01-25-11
Work Completed  
Time Computed 11-15-09
Contract Working Days 238
Addl Days Granted 0
Working Days Charged 67
Percent Time Used 28
Contractor(s)
SIEMENS INDUSTRY, INC.
SUBCONTRACTOR(S) FOR CCSJ: 0912-00-383
SOUTHWEST ROAD & SAFETY CONTRACTORS, LLC (0.00%)
YORK & YORK FOUNDATION DRILLING, INC.(0.11%)
PROFESSIONAL TRAFFIC CONTROL, LLC(1.19%)
THOMPSON CONSTRUCTION(3.27%)
BELL BOTTOM FOUNDATION CO. (0.63%)
ENERGY ELECTRICAL SUPPLY,INC.(0.84%)
VACA UNDERGROUND UTILITIES INC (0.91%)
Contract # 09093011
Totals 946870.85 0.00 994403.10 99.9