| Contract Identification and Information |
Length |
Contract Amount |
Amount This Estimate |
Total Estimate To Date |
% Comp |
|
| County | HARRIS |
| Highway |
CS |
| From |
SUNNYSIDE AREA PEDESTRIAN TRAIL |
| To |
IN SCOTTCREST PARK |
| CSJ |
0912-72-067 |
| Proj ID |
HP 2010(930) |
| Work Type |
CONSTRUCT PEDESTRIAN TRAIL |
| |
|
1.170 |
733040.69 |
0.00 |
820221.36 |
99.9 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
08-10-11 |
| Work Began |
09-06-11 |
| Work Completed |
|
| Time Computed |
08-26-11 |
| Contract Working Days |
74 |
| Addl Days Granted |
0 |
| Working Days Charged |
61 |
| Percent Time Used |
82 |
| Contractor(s) |
| LONE STAR ROAD CONSTRUCTION, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-067 HIGHWAY TECHNOLOGIES, INC. (0.71%) TRAF-TEX, INC. ( 18.29%) LANDSCAPE CONTRACTING AND IRRIGATION, INC. ( 15.60%) ENVIRONMENTAL ALLIES, L.P. (2.27%) HOUSTON SAWING & DRILLING(0.92%) SOUTHWEST GRAPHIX(0.37%)
|
| Contract # |
05113013 |
|
Totals |
733040.69 |
0.00 |
820221.36 |
99.9 |
|
| County | HARRIS |
| Highway |
CS |
| From |
PORT ROAD, SH 146 |
| To |
TODVILLE RD |
| CSJ |
0912-72-073 |
| Proj ID |
HP 2008(783) |
| Work Type |
GR, STRS, BASE AND PAVE |
| |
|
2.024 |
11790329.44 |
12630.49 |
11816231.85 |
99.9 |
| Work Order |
11-06-09 |
| Work Began |
12-09-09 |
| Work Completed |
|
| Time Computed |
11-22-09 |
| Contract Working Days |
340 |
| Addl Days Granted |
31 |
| Working Days Charged |
367 |
| Percent Time Used |
98 |
| Contractor(s) |
| TEXAS STERLING CONSTRUCTION CO. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-073 ROADSAFE TRAFFIC SYSTEMS, INC. (0.11%) EL DORADO PAVING COMPANY, INC. (3.05%) INDUS CONSTRUCTION, L.P. (0.78%) WIMS ENVIRONMENTAL CONSTRUCTION, LTD.(2.15%) JOE VALENCIK, INC. (0.46%) EARTH MATERIAL SERVICES, LLC.(1.07%) JMHP, INC. (0.20%) BORING & TUNNELING COMPANY OF AMERICA, INC.(0.11%) RIVER CITIES SAWING LLC(0.72%) MUNGLE BROS. CONSTRUCTION,LLC(1.71%) RAILWORKS TRACK SYSTEMS, INC.(1.25%) RAILROAD SIGNAL, INC.(0.03%) J. T. B. SERVICES, INC.(0.19%) SCOTT DERR PAINTING CO, LLC(0.03%) FOSTER FENCE, LTD. (0.25%)
|
| Contract # |
08093005 |
|
Totals |
11790329.44 |
12630.49 |
11816231.85 |
99.9 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IN HARRIS COUNTY |
| To |
. |
| CSJ |
0912-72-083 |
| Proj ID |
CM 2008(855) |
| Work Type |
TRAFFIC SIGNAL |
| |
|
0.001 |
1122979.07 |
0.00 |
1124513.21 |
99.9 |
| Work Order |
09-12-08 |
| Work Began |
12-01-08 |
| Work Completed |
|
| Time Computed |
09-28-08 |
| Contract Working Days |
298 |
| Addl Days Granted |
0 |
| Working Days Charged |
147 |
| Percent Time Used |
49 |
| Contractor(s) |
| TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-083 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
08083212 |
|
Totals |
1122979.07 |
0.00 |
1124513.21 |
99.9 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IN HARRIS COUNTY |
| To |
. |
| CSJ |
0912-72-084 |
| Proj ID |
CM 2008(894) |
| Work Type |
TRAFFIC SIGNAL INTERCONNECT |
| |
|
0.002 |
1924706.58 |
0.00 |
1800158.03 |
93.5 |
| Work Order |
09-23-10 |
| Work Began |
10-14-10 |
| Work Completed |
|
| Time Computed |
10-09-10 |
| Contract Working Days |
312 |
| Addl Days Granted |
0 |
| Working Days Charged |
278 |
| Percent Time Used |
89 |
| Contractor(s) |
| FLORIDA TRAFFIC CONTROL DEVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-084 THE L.E. MYERS CO. (7.02%) B&M TELECOM, INC.(5.66%)
|
| Contract # |
08103011 |
|
Totals |
1924706.58 |
0.00 |
1800158.03 |
93.5 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IN HARRIS COUNTY |
| To |
. |
| CSJ |
0912-72-088 |
| Proj ID |
CM 2008(054) |
| Work Type |
TRAFFIC SIGNAL |
| |
|
0.001 |
1462321.41 |
10819.17 |
3060112.21 |
99.9 |
| Work Order |
09-25-07 |
| Work Began |
12-07-07 |
| Work Completed |
|
| Time Computed |
11-24-07 |
| Contract Working Days |
388 |
| Addl Days Granted |
0 |
| Working Days Charged |
377 |
| Percent Time Used |
97 |
| Contractor(s) |
| TRAF-TEX, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-088 HIGHWAY TECHNOLOGIES, INC. (6.50%) TEAM WORK CONSTRUCTION SERVICES( 14.35%)
|
| Contract # |
08073044 |
|
Totals |
1462321.41 |
10819.17 |
3060112.21 |
99.9 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IN HARRIS COUNTY |
| To |
. |
| CSJ |
0912-72-089 |
| Proj ID |
CM 2011(101) |
| Work Type |
TRAFFIC SIGNAL INTERCONNECT |
| |
|
0.002 |
4497940.86 |
143451.37 |
3029366.06 |
67.3 |
| Work Order |
09-23-10 |
| Work Began |
03-08-11 |
| Work Completed |
|
| Time Computed |
10-09-10 |
| Contract Working Days |
468 |
| Addl Days Granted |
0 |
| Working Days Charged |
248 |
| Percent Time Used |
52 |
| Contractor(s) |
| FLORIDA TRAFFIC CONTROL DEVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-089 L.E. MYERS CO. (2.24%) B&M TELECOM, INC.(7.15%) FORDE CONSTRUCTION COMPANY, INC. (1.97%)
|
| Contract # |
08103208 |
|
Totals |
4497940.86 |
143451.37 |
3029366.06 |
67.3 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS IN HARRIS COUNTY |
| To |
. |
| CSJ |
0912-72-091 |
| Proj ID |
CM 2008(052) |
| Work Type |
TRAFFIC SIGNAL |
| |
|
0.001 |
1787739.66 |
0.00 |
1647199.89 |
92.1 |
| Work Order |
09-19-07 |
| Work Began |
12-03-07 |
| Work Completed |
|
| Time Computed |
11-18-07 |
| Contract Working Days |
360 |
| Addl Days Granted |
0 |
| Working Days Charged |
360 |
| Percent Time Used |
100 |
| Contractor(s) |
| STATEWIDE TRAFFIC SIGNAL COMPANY |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-091 SPRING CREEK CONSTRUCTION, INC.(6.62%)
|
| Contract # |
08073210 |
|
Totals |
1787739.66 |
0.00 |
1647199.89 |
92.1 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
0912-72-116 |
| Proj ID |
STP 2011(579) |
| Work Type |
BASE, SHLDR, SLOPE, STR & SIGN WORK |
| |
|
0.001 |
1865335.43 |
0.00 |
1372953.02 |
73.6 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
01-06-11 |
| Work Began |
01-29-11 |
| Work Completed |
|
| Time Computed |
01-22-11 |
| Contract Working Days |
303 |
| Addl Days Granted |
0 |
| Working Days Charged |
292 |
| Percent Time Used |
96 |
| Contractor(s) |
| SPRING EQUIPMENT CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-116 BUILDER SERVICES CO. (2.58%) SILVA CONTRACTING COMPANY, INC.(1.05%) TOM-MAC, INC.(5.11%) WILLOW CITY SIGN & RAIL, INC.(1.78%) BATTERSON,LLP(1.58%) EPOXY DESIGN SYSTEMS, INC. (5.15%) MICA CORPORATION (3.60%) HOLES INCORPORATED (0.57%) CPAVE, INC.(0.06%) TEXAS STERLING CONSTRUCTION CO.(0.32%) WEBBER BARRIER SERVICES, INC.(1.20%) NBG CONSTRUCTORS, INC. ( 11.79%)
|
| Contract # |
12103214 |
|
Totals |
1865335.43 |
0.00 |
1372953.02 |
73.6 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
0912-72-117 |
| Proj ID |
STP 2012(066) |
| Work Type |
UPGRADE VIA'S WITH REACTS IN C. HOU |
| |
|
0.001 |
991340.00 |
0.00 |
0.00 |
0.0 |
| Work Order |
11-16-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
12-02-11 |
| Contract Working Days |
55 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SCR CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-117 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
10113012 |
|
Totals |
991340.00 |
0.00 |
0.00 |
0.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS ON IH 610 |
| To |
. |
| CSJ |
0912-72-118 |
| Proj ID |
CM 2009(035) |
| Work Type |
ITS IMPROVEMENTS |
| |
|
0.001 |
1025615.96 |
0.00 |
997029.64 |
97.2 |
| Work Order |
05-11-09 |
| Work Began |
07-15-09 |
| Work Completed |
|
| Time Computed |
05-27-09 |
| Contract Working Days |
300 |
| Addl Days Granted |
0 |
| Working Days Charged |
287 |
| Percent Time Used |
95 |
| Contractor(s) |
| FLORIDA TRAFFIC CONTROL DEVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-118 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
04093003 |
|
Totals |
1025615.96 |
0.00 |
997029.64 |
97.2 |
|
| County | HARRIS |
| Highway |
CS |
| From |
GROESCHKE ROAD AT MAYDE CREEK |
| To |
. |
| CSJ |
0912-72-126 |
| Proj ID |
BR 2007(836) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.157 |
1167229.35 |
85483.76 |
385579.80 |
33.0 |
| Work Order |
09-30-11 |
| Work Began |
11-15-11 |
| Work Completed |
|
| Time Computed |
10-16-11 |
| Contract Working Days |
76 |
| Addl Days Granted |
0 |
| Working Days Charged |
26 |
| Percent Time Used |
34 |
| Contractor(s) |
| ROZCO CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-126 CRAIG & HEIDT, INC.(8.21%) HIGHWAY TECHNOLOGIES, INC. (0.41%) ODUM SERVICES, L.P.(1.24%) REGIONAL TRAFFIC SERVICES, LLC (0.25%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.61%) TOM-MAC, INC.(4.80%) VALLEY PLACERS, LLC(0.37%)
|
| Contract # |
08113031 |
|
Totals |
1167229.35 |
85483.76 |
385579.80 |
33.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
MIDTOWN/DOWNTOWN HOUSTON |
| To |
. |
| CSJ |
0912-72-141 |
| Proj ID |
CM 1102(006) |
| Work Type |
CBD COMMUNICATIONS SYSTEM |
| |
|
0.001 |
1453930.00 |
448420.50 |
448420.50 |
30.8 |
| Work Order |
10-18-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-03-11 |
| Contract Working Days |
186 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| RELIABLE SIGNAL & LIGHTING SOLUTIONS, LLC |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-141 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07113213 |
|
Totals |
1453930.00 |
448420.50 |
448420.50 |
30.8 |
|
| County | HARRIS |
| Highway |
VA |
| From |
N MAIN BETWEEN TEXAS AVE AND BAKER |
| To |
ALEXANDER BETWEEN TEXAS AVE/MCKINNE |
| CSJ |
0912-72-153 |
| Proj ID |
CM 2009(631) |
| Work Type |
TS SYNCHRONIZATION |
| |
|
0.001 |
984861.47 |
0.00 |
966055.82 |
98.0 |
| Work Order |
06-15-10 |
| Work Began |
09-02-10 |
| Work Completed |
|
| Time Computed |
07-01-10 |
| Contract Working Days |
246 |
| Addl Days Granted |
0 |
| Working Days Charged |
239 |
| Percent Time Used |
97 |
| Contractor(s) |
| CREACOM, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-153 HIGHWAY TECHNOLOGIES, INC. (1.01%) AMERICAN CONTRACTING & SERVICES, INC. OF INDIANA (2.98%) SPECIALTY DRILLING (0.08%)
|
| Contract # |
03103211 |
|
Totals |
984861.47 |
0.00 |
966055.82 |
98.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
TRANSTAR |
| To |
. |
| CSJ |
0912-72-168 |
| Proj ID |
STP 2008(265)MM |
| Work Type |
TRANSTAR COMMUNICATIONS TOWER |
| |
|
0.001 |
699130.00 |
27965.20 |
702130.77 |
99.9 |
| Work Order |
09-21-10 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
10-07-10 |
| Contract Working Days |
180 |
| Addl Days Granted |
0 |
| Working Days Charged |
229 |
| Percent Time Used |
127 |
| Contractor(s) |
| QUALITY TOWER SERVICES, LTD. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-168 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
07103236 |
|
Totals |
699130.00 |
27965.20 |
702130.77 |
99.9 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS |
| To |
. |
| CSJ |
0912-72-180 |
| Proj ID |
STP 2012(148) |
| Work Type |
FULL DEPTH REPAIR & BRIDGE REPAIR |
| |
|
0.001 |
1464291.55 |
0.00 |
0.00 |
0.0 |
| NO CURRENT ESTIMATE AT TIME OF THIS RUN |
| Work Order |
00-00-00 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
00-00-00 |
| Contract Working Days |
255 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| SCR CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-180 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12113214 |
|
Totals |
1464291.55 |
0.00 |
0.00 |
0.0 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VARIOUS LOCATIONS INSIDE HARRIS CTY |
| To |
. |
| CSJ |
0912-72-212 |
| Proj ID |
STP 2011(716)G |
| Work Type |
PAVEMENT MARKINGS |
| |
|
0.001 |
2063799.80 |
63623.76 |
1438918.34 |
69.7 |
| Work Order |
01-06-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
01-22-11 |
| Contract Working Days |
220 |
| Addl Days Granted |
0 |
| Working Days Charged |
199 |
| Percent Time Used |
90 |
| Contractor(s) |
| BATTERSON,LLP |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-212 NO SUBCONTRACTORS FOR THIS CCSJ
|
| Contract # |
12103031 |
|
Totals |
2063799.80 |
63623.76 |
1438918.34 |
69.7 |
|
| County | HARRIS |
| Highway |
VA |
| From |
VAR LOCATIONS IN CENTRAL HOUSTON |
| To |
. |
| CSJ |
0912-72-213 |
| Proj ID |
NH 2012(067) |
| Work Type |
REHAB AND OTHER MISC. WORK |
| |
|
0.001 |
1887399.75 |
0.00 |
0.00 |
0.0 |
| Work Order |
11-16-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
12-02-11 |
| Contract Working Days |
238 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ISI CONTRACTING, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-72-213 HIGHWAY TECHNOLOGIES, INC. (1.67%) MB WESTERN INDUSTRIAL CONTRACTING(1.87%) KOSSMAN CONTRACTING COMPANY(0.43%)
|
| Contract # |
10113010 |
|
Totals |
1887399.75 |
0.00 |
0.00 |
0.0 |
|
| County | GALVESTON |
| Highway |
CR |
| From |
BIRCH ROAD |
| To |
AT CLEAR LAKE SHORE CAN |
| CSJ |
0912-73-113 |
| Proj ID |
BR 2005(149) |
| Work Type |
REPLACE BRIDGE |
| |
|
0.053 |
377937.65 |
0.00 |
0.00 |
0.0 |
| Work Order |
09-16-11 |
| Work Began |
00-00-00 |
| Work Completed |
|
| Time Computed |
11-15-11 |
| Contract Working Days |
74 |
| Addl Days Granted |
0 |
| Working Days Charged |
0 |
| Percent Time Used |
0 |
| Contractor(s) |
| ARANDA BROTHERS CONSTRUCTION |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-113 REGIONAL TRAFFIC SERVICES, LLC (1.21%) W. W. FOUNDATION DRILLING, LTD.( 10.04%)
|
| Contract # |
08113251 |
|
Totals |
377937.65 |
0.00 |
0.00 |
0.0 |
|
| County | GALVESTON |
| Highway |
CS |
| From |
SEAWOLF PKWY AT PELICAN ISLAND CHNL |
| To |
. |
| CSJ |
0912-73-117 |
| Proj ID |
BR 2007(366) |
| Work Type |
REHABILITATE BRIDGE |
| |
|
0.612 |
3439504.50 |
4000.00 |
3188158.80 |
92.6 |
| Work Order |
05-18-11 |
| Work Began |
08-03-11 |
| Work Completed |
|
| Time Computed |
06-03-11 |
| Contract Working Days |
301 |
| Addl Days Granted |
0 |
| Working Days Charged |
135 |
| Percent Time Used |
44 |
| Contractor(s) |
| SCR CONSTRUCTION CO., INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-117 ORION CONSTRUCTION, L.P. (6.38%) ROADSAFE TRAFFIC SYSTEMS, INC. (0.30%) INTECH CONTRACTING LLC ( 74.13%) BRIDGES R US PAINTING CO., INC.( 36.05%)
|
| Contract # |
04113207 |
|
Totals |
3439504.50 |
4000.00 |
3188158.80 |
92.6 |
|
| County | GALVESTON |
| Highway |
VA |
| From |
BROADWAY ST FROM 6TH STREET |
| To |
61ST STREET |
| CSJ |
0912-73-137 |
| Proj ID |
CM 2011(329) |
| Work Type |
UPGRADE TRAFFIC SIGNALS & SYNCH |
| |
|
0.001 |
633856.07 |
0.00 |
623785.36 |
98.4 |
| Work Order |
01-06-11 |
| Work Began |
01-31-11 |
| Work Completed |
|
| Time Computed |
01-31-11 |
| Contract Working Days |
106 |
| Addl Days Granted |
0 |
| Working Days Charged |
102 |
| Percent Time Used |
96 |
| Contractor(s) |
| FLORIDA TRAFFIC CONTROL DEVICES, INC. |
SUBCONTRACTOR(S) FOR CCSJ: 0912-73-137 AMERICAN CABLE SERVICES, INC.(3.62%) HENKELS & MCCOY, INC.( 38.26%)
|
| Contract # |
08103097 |
|
Totals |
633856.07 |
0.00 |
623785.36 |
98.4 |
|