AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Friday, June 26, 2015
ITEMS 416 6004 TO 420 2292
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0700 - 0788
0800 - 0800
1002 - 1158
2021 - 2336
3000 - 3289
4001 - 4686
5001 - 5991
6000 - 6986
7001 - 7661
8020 - 8999
9012 - 9059
400 2001 - 416 6003
416 6004 - 420 2292
420 2311 - 425 2004
425 2006 - 430 2037
430 2038 - 432 2059
432 2066 - 438 6002
438 6003 - 450 2611
450 2612 - 459 6008
459 6009 - 462 6013
462 6014 - 464 2065
464 2066 - 465 2112
465 2115 - 465 4017
465 4018 - 465 6167
465 6168 - 466 2146
466 2147 - 466 6164
466 6165 - 467 2158
467 2159 - 467 2382
467 2386 - 467 6228
467 6231 - 467 6538
467 6542 - 491 6001
495 2001 - 499 2001
Item No Description Units June 30, 2015 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
416 6004 DRILL SHAFT (36 IN) LF 21,161.000 179.41434 40,325.000 166.48076 40
416 6005 DRILL SHAFT (42 IN) LF 1,576.000 231.72589 5,772.000 205.01765 7
416 6006 DRILL SHAFT (48 IN) LF 1,637.000 300.00000 2,990.000 319.08622 4
416 6007 DRILL SHAFT (54 IN) LF 2,462.000 350.00000 2,524.000 353.66448 2
416 6008 DRILL SHAFT (60 IN) LF 1,354.000 400.00000 1,354.000 400.00000 1
416 6010 DRILL SHAFT (72 IN) LF 120.000 550.00000 120.000 550.00000 1
416 6011 DRILL SHAFT (78 IN) LF     964.000 665.00000 1
416 6012 DRILL SHAFT (84 IN) LF 242.000 750.00000 3,079.000 579.40643 3
416 6015 DRILL SHAFT (NON - REINFORCED) (12 IN) LF 84.000 60.00000 253.000 65.43874 10
416 6016 DRILL SHAFT (SIGN MTS) (12 IN) LF 53.000 87.77358 127.000 104.47244 5
416 6018 DRILL SHAFT (SIGN MTS) (24 IN) LF 334.000 109.94012 1,355.000 122.82004 16
416 6019 DRILL SHAFT (SIGN MTS) (30 IN) LF     1,450.000 100.58000 1
416 6020 DRILL SHAFT (SIGN MTS) (36 IN) LF 2,728.000 175.00000 2,798.000 175.87563 3
416 6021 DRILL SHAFT (SIGN MTS) (42 IN) LF 2,286.000 262.48906 3,548.000 252.93405 6
416 6022 DRILL SHAFT (SIGN MTS) (48 IN) LF 276.000 300.00000 1,274.000 244.67033 5
416 6023 DRILL SHAFT (SIGN MTS) (54 IN) LF 46.000 418.47826 1,015.000 370.55665 7
416 6026 DRILL SHAFT (HIGH MAST POLE) (60 IN) LF 418.000 650.00000 769.000 559.16905 2
416 6027 DRILL SHAFT (HIGH MAST POLE) (66 IN) LF     720.000 525.00000 1
416 6029 DRILL SHAFT (RDWY ILL POLE) (30 IN) LF 1,526.000 121.24509 5,275.000 154.01696 27
416 6030 DRILL SHAFT (TRF SIG POLE) (24 IN) LF 222.000 136.00000 390.000 133.41538 2
416 6031 DRILL SHAFT (TRF SIG POLE) (30 IN) LF     450.800 189.91318 11
416 6032 DRILL SHAFT (TRF SIG POLE) (36 IN) LF 431.000 228.96288 3,249.000 230.58822 33
416 6033 DRILL SHAFT (TRF SIG POLE) (42 IN) LF     17.400 275.00000 1
416 6034 DRILL SHAFT (TRF SIG POLE) (48 IN) LF 176.000 296.87500 1,366.400 340.65427 19
416 6052 DRILLED SHAFT (12 IN) LF 40.000 50.00000 40.000 50.00000 1
416 6055 DRILL SHAFT (TRF SIG POLE) (30 IN) (ROCK LF     44.000 240.00000 1
416 6056 DRILL SHAFT (TRF SIG POLE) (36IN) (ROCK) LF     52.000 320.00000 1
416 6089 DRILL SHAFT (92 IN) LF 126.000 1,000.00000 126.000 1,000.00000 1
420 2001 CL A CONC (MISC) CY     904.800 319.15427 15
420 2002 CL B CONC (FLUME) CY     465.550 449.12856 10
420 2003 CL C CONC (ABUT) CY     5,626.400 829.34583 68
420 2004 CL C CONC (BENT) CY     7,501.800 852.37921 34
420 2005 CL C CONC (FOOTING) CY     1,991.600 637.51201 5
420 2006 CL C CONC (RAIL FOUNDATION) CY     4,299.400 331.44035 18
420 2007 CL C CONC (CULV) CY     153.600 1,194.29688 4
420 2009 CL C CONC (HDWL) CY     6.000 3,000.00000 1
420 2010 CL C CONC (SIGN COLUMN) CY     1,202.030 583.39226 4
420 2011 CL C CONC (RETAINING WALL) CY     368.000 1,473.47826 3
420 2013 CL C CONC (MISC) CY     1,540.500 526.92981 23
420 2015 CL C CONC (CURB OUTLET) (TY II) EA     1.000 1,750.00000 1
420 2016 CL C CONC (COLLAR) EA     156.000 1,149.70474 13
420 2017 CL C CONC (BENT) (MASS PLACEMENT) CY     674.400 890.00000 1
420 2018 CL C CONC (FOOTING) (MASS PLACEMENT) CY     7,083.800 443.77123 5
420 2019 CL C CONC (CAP) CY     2,082.900 725.64257 10
420 2020 CL C CONC (CRASHWALL) CY     1,860.500 939.00430 5
420 2022 CL E CONC (SEAL) CY     62.000 236.45161 2
420 2023 CL F CONC (COLUMN) CY     25.700 1,000.00000 1
420 2025 CL F CONC (FOOTING) (MASS PLACEMENT) CY     43.600 790.21995 1
420 2028 CL H CONC (BENT) CY     77.600 6,000.00000 1
420 2029 CL S CONC (SLAB) CY     739.500 767.04191 12
420 2030 CL S CONC (PAN GIRD) CY     127.200 2,481.53994 1
420 2031 CL S CONC (SHEAR KEY) CY     225.300 171.84132 5
420 2033 CL S CONC (APPR SLAB) CY     4,990.170 461.37243 29
420 2034 CL S CONC (BRIDGE SDWLK) CY     572.700 418.86833 4
420 2035 CL S CONC (CIP SLAB SPAN) CY     88.200 609.78991 1
420 2036 CL A CONC (SEAL) CY     113.000 123.00000 1
420 2037 CL C CONC (VALLEY GUTTER) SY 136.000 78.00000 136.000 78.00000 1
420 2039 CL D CONC (MISC) CY     588.900 271.75249 5
420 2041 CL C CONC (ABUT) (HPC) CY     5,430.400 752.66195 34
420 2042 CL C CONC (BENT) (HPC) CY     12,606.500 797.13899 29
420 2050 CL F CONC (CAP) CY     10,622.700 583.12576 4
420 2051 CL C CONC (COLUMN) CY     9,951.400 719.00312 13
420 2055 CL C CONC (COLUMN) (MASS PLACEMENT) CY     4,107.100 608.23709 4
420 2059 CL C CONC (CAP) (MASS PLACEMENT) CY     3,372.200 548.21398 2
420 2060 CL B CONC (DITCH INTERCEPTOR STRUCTURE EA     2.000 3,200.00000 1
420 2061 CL S CONC (HPC) BAS CY     5,692.400 487.42941 11
420 2062 CL S CONC (HPC) REINF CONC SLAB SF     4,550.000 14.01000 1
420 2064 CL A CONC (PLUG) EA     9.000 728.85556 2
420 2068 CL S CONC (HPC) (SLAB) CY     1,074.900 867.23602 6
420 2069 CL S CONC (HPC) (SHEAR KEY) CY     97.000 435.34021 2
420 2072 CL H CONC (BENT) (MASS PLACEMENT) CY     608.600 650.00000 1
420 2077 CL C CONC (HPC) (CRASHWALL) CY     141.700 771.53994 1
420 2084 CL A CONC (CURB OUTLET) (TY I) EA     6.000 600.00000 1
420 2089 CL F CONC (CAP) (MASS PLACEMENT) CY     253.400 852.16255 2
420 2090 CL A CONC (COLLAR) EA     3.000 800.00000 2
420 2091 CL B CONC (MISC) CY     2.900 1,827.58621 2
420 2092 CL C CONC (CAP) (MASS PLACEMENT) (HPC) CY     4,717.900 761.24136 3
420 2093 CL C CONC (COLUMN) (MASS PLACE) (HPC) CY     5,099.200 654.87324 3
420 2094 CL C CONC (FOOTING) (MASS PLACE) (HPC) CY     725.100 500.00000 1
420 2104 CL A CONC (FLUME) CY     463.400 486.30703 5
420 2115 CL F CONC (COLUMN) (MASS PLACEMENT) CY     300.500 778.36998 1
420 2116 CL F CONC (SLAB) CY     85.000 840.00000 1
420 2117 CL C CONC (SIGN FOOTING) CY     296.790 401.21635 2
420 2120 CL C CONC (BUS STOP) CY     13.000 500.00000 1
420 2123 CL C CONC (FOOTING) (HPC) CY     1,186.400 600.00000 1
420 2124 CL S CONC (SLAB) SF     23,413.000 18.64362 6
420 2125 CL C CONC (VEH DEFL WALL) CY     218.400 480.00000 1
420 2213 CL H CONC (FASCIA PANEL) CY     77.700 1,500.00000 1
420 2221 CL S CONC (JUNCTION BOX) CY     148.400 976.58356 3
420 2223 CL C CONC (COLUMN) (HPC) CY     3,696.400 778.31916 6
420 2233 CL C CONC (CURB) CY     15.600 550.00000 1
420 2240 CL A CONC (SPANDREL) CY     72.000 525.00000 1
420 2243 CL E CONC (SEAL SLAB) CY     1,037.600 157.39668 2
420 2256 CL S CONC (APPR SLAB) (HPC) CY     3,819.100 488.27368 19
420 2260 CLASS A CONC EDGE CY     277.700 336.18999 1
420 2268 CL C CONC (RAIL FOUNDATION) (HPC) CY     19.000 130.00000 1
420 2269 CL C CONC (CAP) (HPC) CY     6,450.900 781.71455 5
420 2276 CL C CONC (WALL) CY     44.100 545.00000 1
420 2291 CL S CONC (BRIDGE MEDIAN) (HPC) CY     1,600.500 352.54489 4
420 2292 CL S CONC (BRIDGE SDWLK) (HPC) CY     805.500 454.99351 6