AVERAGE LOW BID UNIT PRICE - CONSTRUCTION - STATEWIDE

Last Update: Friday, August 1, 2014
ITEMS 712 2001 TO 788 2003
Items Items Bid Code Range
0100 - 0193
0204 - 0292
0305 - 0368
0400 - 0499
0500 - 0560
0610 - 0690
0712 - 0788
0800 - 0800
1003 - 1146
2021 - 2271
3042 - 3285
4001 - 4679
5050 - 5997
6004 - 6986
7380 - 7642
8008 - 8999
9009 - 9059
712 2001 - 788 2003
Item No Description Units July 31, 2014 Twelve Month Moving Usage
Quantity Avg Bid Quantity Avg Bid
712 2001 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LF     6,924.000 1.08059 2
712 2002 JT / CRCK SEAL (POLY MOD ASPH EMULSION) LMI     53.300 1,192.44953 2
712 2005 JT / CRCK SEAL (RUBBER - ASPHALT) LMI     690.793 379.93697 2
720 2001 SPALLING REPAIR (HYDRAULIC CEMENT) CF 746.000 200.00000 746.000 200.00000 1
720 2003 SPALLING REPAIR (POLYMERIC) (SEMIRIGID) GAL     185.000 71.10811 2
730 2001 STRIP MOWING AC     130.000 250.92308 3
730 2002 FULL - WIDTH MOWING AC     1,918.990 76.13588 13
730 2003 SPOT MOWING AC 90.000 150.00000 164.120 212.56483 3
730 2113 FULL - WIDTH MOWING CYC 28.000 1,457.14286 173.000 1,588.18035 22
730 2119 STRIP MOWING CYC     6.000 1,200.00000 1
734 2001 LITTER REMOVAL AC     924.680 70.02314 2
734 2002 LITTER REMOVAL CYC 28.000 1,542.85714 194.000 1,557.57031 22
734 2003 LITTER REMOVAL (SPOT) AC 510.000 75.00000 510.000 75.00000 1
735 2001 DEBRIS REMOVAL (CNTR MEDIANS / MAINLANES CYC 7.000 2,800.00000 35.000 2,720.00000 4
735 2003 DEBRIS REMOVAL (FRONTAGE ROADS) CYC 11.000 1,709.09091 30.000 1,516.66667 4
735 2005 DEBRIS REMOVAL (ENTRANCE / EXIT RAMPS) CYC 7.000 1,400.00000 26.000 1,326.92308 3
735 2132 DEBRIS REMOVAL (STREET) CYC     39.000 1,703.08692 3
738 2001 CLEANING / SWEEPING (CENTER MEDIAN) CYC 51.000 1,898.03922 136.000 1,836.76471 5
738 2003 CLEANING / SWEEPING (OUTSIDE MAIN LANE) CYC 51.000 1,898.03922 204.000 1,442.15686 8
738 2004 CLEANING / SWEEPING (OUTSIDE MAIN LANE) MI 36.000 200.00000 36.000 200.00000 1
738 2005 CLEANING / SWEEPING (FRONTAGE ROAD) CYC 74.000 1,800.00000 186.000 1,606.45161 5
738 2006 CLEANING / SWEEPING (FRONTAGE ROAD) MI 36.000 200.00000 36.000 200.00000 1
738 2007 CLEANING / SWEEPING (ENTRANCE / EXIT RAMP) CYC 26.000 1,000.00000 102.000 925.49020 3
738 2224 CLEANING / SWEEPING (STREET) CYC     97.000 1,814.64495 5
738 2237 CLEAN / SWEEPING CYC     18.000 1,500.00000 1
738 2278 CLEANING / SWEEPING (BRIDGE) MI     .220 10,000.00000 1
740 2001 GRAFFITI REMOVAL (BLAST CLEANING) SF     15,343.000 .97000 1
740 2004 ANTI - GRAFFITI COATING (SACRIFICIAL) SF 700.000 14.28600 700.000 14.28600 1
740 2005 ANTI - GRAFFITI COATING (PERMANENT) SF 8,077.000 1.00000 719,489.000 .61481 13
751 2003 IRRIG SYS OPERATION AND REPAIR (SITE A MO 24.000 425.00000 24.000 425.00000 1
751 2008 PLANT BED MAINTENANCE (SITE A) CYC 1.000 12,370.37000 1.000 12,370.37000 1
751 2013 IRRIG SYS OPERATION & REPAIR (SITE B) MO 24.000 425.00000 24.000 425.00000 1
751 2018 PLANT BED MAINTENANCE (SITE B) CYC 4.000 2,400.00000 4.000 2,400.00000 1
751 2027 MOWING, TRIMMING, AND EDGING CYC     6.000 3,750.00000 1
751 2075 PLANT BED MAINTENANCE (SITE C) CYC 24.000 2,391.97500 24.000 2,391.97500 1
751 2078 IRRIG SYS OP & REPAIR (SITE C) MO 12.000 1,551.85167 12.000 1,551.85167 1
752 2018 TREE TRIMMING MI .160 5,000.00000 1.830 446.73770 2
752 2020 TREE TRIMMING / BRUSH REMOVAL MI     10.500 6,242.85714 2
752 2022 TREE REMOVAL (4" - 12" DIA) EA     600.000 179.84328 6
752 2023 TREE REMOVAL (12" - 18" DIA) EA 4.000 500.00000 64.000 981.45938 8
752 2024 TREE REMOVAL (18" - 24" DIA) EA 1.000 750.00000 40.000 1,587.13250 5
752 2025 TREE REMOVAL (24" - 30" DIA) EA 3.000 900.00000 11.000 1,891.26364 4
752 2026 TREE REMOVAL (30" - 36" DIA) EA     2.000 4,535.40000 1
752 2028 TREE REMOVAL (42" - 48" DIA) EA 2.000 1,000.00000 3.000 2,500.00000 2
752 2045 STUMP REMOVAL EA     7.000 200.00000 1
752 2046 TREE AND BRUSH REMOVAL AC     1.330 8,000.00000 1
760 2001 DITCH CLEANING AND RESHAPING (FOOT) LF 22,130.000 1.75000 281,059.000 1.72568 14
764 2001 DRAIN INLET CLEANING EA     87.000 107.92000 1
772 2001 POST AND CABLE FENCE (REMOVAL) LF     13,930.000 1.02764 2
772 2002 POST AND CABLE FENCE (REMV CONC ANCHOR) EA     4.000 1,000.00000 1
772 2003 POST AND CABLE FENCE (NEW INSTALLATION) LF     845.000 10.85680 2
772 2005 POST AND CABLE FENCE (REMV / REPL POSTS) EA 11.000 28.00000 11.000 28.00000 1
780 2001 EPOXY INJECTION (TY IX) LF 1,010.000 101.98020 1,325.000 87.19283 6
784 2002 REPAIRING STL BRIDGE MEMBER (DIAPHRAGM) EA 18.000 350.00000 18.000 350.00000 1
784 2003 REP STL BRIDGE MEMBER (TRUSS VERTICAL) EA 4.000 1,000.00000 4.000 1,000.00000 1
784 2007 REPAIR STL BRIDGE MEMBERS LS     1.000 47,500.00000 1
784 2008 REP STL BRIDGE MEMBER (BENT SWAY BRACE EA 2.000 4,500.00000 2.000 4,500.00000 1
784 2014 REP STL BRIDGE MEMBER (SPLICE PLATE) EA 2.000 6,000.00000 2.000 6,000.00000 1
784 2019 REP STL BRIDGE MEMBER (BATTEN PLATES) EA 5.000 3,200.00000 5.000 3,200.00000 1
784 2057 REP STL BRDG MEMB (TRUSS PORTAL BRACE) EA 4.000 8,500.00000 4.000 8,500.00000 1
784 2058 REP STL BRIDGE MEMBER (FLOORBEAM) EA 13.000 1,000.00000 46.000 519.34783 2
784 2064 REP STL BRIDGE MEMBER (STRINGER) EA     1.000 425.01000 1
784 2067 REPAIR STEEL BRIDGE MEMBERS (TYPE A1) EA 4.000 2,250.00000 4.000 2,250.00000 1
784 2068 REPAIR STEEL BRIDGE MEMBERS (TYPE A2) EA 16.000 2,500.00000 16.000 2,500.00000 1
784 2069 REPAIR STEEL BRIDGE MEMBERS (TYPE A3) EA 2.000 1,500.00000 2.000 1,500.00000 1
784 2071 REPAIR STEEL BRIDGE MEMBERS (TYPE B1) EA 18.000 300.00000 18.000 300.00000 1
784 2072 REPAIR STEEL BRIDGE MEMBERS (TYPE B2) EA 100.000 300.00000 100.000 300.00000 1
784 2105 REP STL BRIDGE MEMBER (STRAIGHTEN MEMB EA 3.000 17,500.00000 13.000 4,838.46154 2
784 2110 REP STL BRIDGE MEMBER (REPL RIVET / BOLT EA 3,276.000 75.00000 3,276.000 75.00000 1
784 2116 REP STL BRIDGE MEMBER (LATERAL BRACING EA     34.000 320.00000 1
784 2122 REP STL BRIDGE MEMBER (GUSSET PLATES) EA 127.000 6,000.00000 127.000 6,000.00000 1
784 2125 REP STEEL BRIDGE MEM (SUSPENSION CABLE) EA     2.000 67,000.00000 1
784 2126 REPAIR STEEL BRIDGE MEMBER (HANGER) EA 8.000 3,500.00000 75.000 909.33333 2
784 2152 REP STL BRIDGE MEMBER (LACING) EA 50.000 500.00000 50.000 500.00000 1
784 2153 REP STL BRIDGE MEMBER (PACK RUST TREATM LF 2,000.000 20.00000 2,000.000 20.00000 1
788 2001 CONCRETE BEAM REPAIR EA     1.000 8,500.00000 1
788 2002 CONCRETE BEAM REPAIR (CFRP) EA 1.000 16,500.00000 2.000 33,250.00000 2
788 2003 CONCRETE BEAM REP (STRAND SPLICE & CFRP EA 2.000 21,000.00000 3.000 39,000.00000 2