Letting Schedule for December, 2007 (FY 2008)

 
 
Last Update: Monday, February 2, 2009
December, 2007 (FY 2008) (see Links)
SEP 2007 | OCT 2007 | NOV 2007 | DEC 2007 | JAN 2008 | FEB 2008 | MAR 2008 | APR 2008 | MAY 2008 | JUN 2008 | JUL 2008 | AUG 2008
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0911-00-062 Angelina/
Lufkin
VA Actual $138,024 11 SHOULDER & CENTERLINE TEXTURING
3418-01-009 Angelina/
Lufkin
FM 1336 Actual $648,514 8 WIDEN PAVEMENT TO 26 FT
0249-02-022 Archer/
Wichita Falls
US 281 Actual $5,740,172 1 SPOT BASE REPAIR, MILL, SEAL COAT AND OVERLAY
0016-07-125 Bexar/
San Antonio
IH 35 Actual $6,610,139 11 RECONFIGURE INTERCHANGE
0017-10-231 Bexar/
San Antonio
IH 35 Actual $22,579,569 2 REPLACE WALTERS ST BRIDGE - ADD TURNAROUNDS, RECONST & WIDEN
0046-05-036 Bowie/
Atlanta
US 82 Actual $2,784,908 6 REPLACE BRIDGE & APPROACHES
0587-01-057 Brazoria/
Houston
FM 1495 Actual $466,099 1 MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND
0117-01-041 Brazos/
Bryan
SH 21 Actual $1,046,803 1 REHABILITATE EXISTING ROAD CONSISTING OF SUBGRADE WIDENING,
0506-04-020 Burleson/
Bryan
FM 2155 Actual $768,123 8 SAFETY WORK CONSISTING OF GRADING, STRUCTURES, SUBGRADE
0152-02-058 Caldwell/
Austin
US 183 Actual $6,118,561 6 CONSTRUCT GRADE SEPARATION
0420-03-013 Calhoun/
Yoakum
SH 172 Actual $1,859,949 11 RESTORE ROADWAY
0224-01-056 Clay/
Wichita Falls
US 287 Actual $709,834 8 INSTALL MEDIAN BARRIER
0239-06-010 Clay/
Wichita Falls
SH 59 Actual $2,618,946 1 WIDEN ROAD AND EXTEND STRUCTURES
0031-04-043 Collingsworth/
Childress
US 83 Actual $2,990,073 1 OVERLAY AND UNDERSEAL
2143-01-008 Cottle/
Childress
FM 2278 Actual $2,390,405 6 REPLACEMENT OF AN EXISTING BRIDGE FACILITY
0918-00-137 Dallas/
Dallas
VA Actual $642,425 1 ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER
0918-45-369 Dallas/
Dallas
CS Actual $2,116,402 7 WIDEN 4 - LANE FACILITY TO 6 - LANE FACILITY
0918-45-689 Dallas/
Dallas
VA Actual $738,225 5 SPREAD SYSTEM RADIO SYSTEM UPGRADE
1047-03-061 Dallas/
Dallas
FM 1382 Actual $1,730,444 1 MILL, LEVEL - UP, OVERLAY AND ADA RAMPS
0918-46-142 Denton/
Dallas
VA Actual $1,387,295 9 10 FT. WIDE CONCRETE PEDESTRIAN TRAIL
0310-01-038 Donley/
Childress
SH 70 Actual $1,540,382 1 OVERLAY
0001-05-015 El Paso/
El Paso
FM 259 Actual $2,300,725 1 2008 SEAL COAT PROGRAM
1046-03-001 El Paso/
El Paso
SS 601 Actual 365,818,000 10 CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES
0902-49-057 Erath/
Fort Worth
CR Actual $163,558 6 REPLACE BRIDGE AND APPROACHES
2105-01-043 Fort Bend/
Houston
FM 2234 Actual $3,381,847 1 BASE REPAIR AND OVERLAY
0912-73-083 Galveston/
Houston
CS Actual $1,125,442 9 LANDSCAPING BEAUTIFICATION
0925-09-024 Hall/
Childress
VA Actual $94,273 10 LANDSCAPE
0925-07-020 Hardeman/
Childress
CR Actual $1,043,783 6 REPLACE BRIDGE AND APPROACHES
0389-13-040 Harris/
Houston
SH 146 Actual $16,205,858 7 CONSTRUCT DIRECT CONNECTOR AND BRAIDED RAMP
0508-01-292 Harris/
Houston
IH 10 Actual $20,207,783 11 REPLACING PAVEMENT AND PARTIAL WIDEN
0912-71-427 Harris/
Houston
CS Actual $1,833,442 11 2 LANES ON NEW LOCATION
0912-71-655 Harris/
Houston
VA Actual $1,269,879 5 HIKE AND BIKE TRAIL (WEST HOUSTON PHASE 2)
1685-03-084 Harris/
Houston
FM 1960 Actual $3,073,385 1 MILLING, SHOULDER WIDENING & ASPHALT OVERLAY
0016-03-092 Hays/
Austin
IH 35 Actual $2,200,236 1 REVERSE EXISTING SB RAMPS
0030-05-059 Hemphill/
Amarillo
US 60 Actual $9,732,590 11 REHABILITATE EXISTING ROADWAY
0920-12-034 Jasper/
Beaumont
CR Actual $297,099 6 REPLACE BRIDGE AND APPROACHES
0028-06-068 Jefferson/
Beaumont
US 90 Actual $5,793,194 1 SEAL COAT
0028-13-128 Jefferson/
Beaumont
IH 10 Actual $258,146 11 RESTRIPE EXISTING ROADWAY
0200-14-072 Jefferson/
Beaumont
US 69 Actual $923,216 11 REPLACE GUARDRAIL & INSTALL MOWSTRIP
0739-02-139 Jefferson/
Beaumont
IH 10 Actual $5,646,455 11 OVERLAY EXISTING ROADWAY
0019-01-131 Johnson/
Fort Worth
SH 174 Actual $70,940 1 INSTALLATION OF SCHOOL ZONE FLASHERS
0443-02-013 Kaufman/
Dallas
SH 198 Actual $6,970,336 1 RECONSTRUCT TO 4 LANE UNDIVIDED URBAN
1135-03-016 Kerr/
San Antonio
FM 1341 Actual $3,505,451 4 REALIGN FARM TO MARKET ROAD ALONG EXISTING CITY STREET
0018-02-052 La Salle/
Laredo
IH 35 Actual $6,443,077 1 FOR THE CONSTRUCTION OF SEAL COAT TYPE OF WORK
0905-00-045 Lubbock/
Lubbock
VA Actual $644,397 1 MISCELLANEOUS CONSTRUCTION
0675-05-068 Madison/
Bryan
IH 45 Actual $2,214,446 1 SAFETY WORK CONSISTING OF THE INSTALLATION OF A MEDIAN
1753-01-016 Mason/
Austin
RM 1871 Actual $3,156,786 6 REPLACE BRIDGE AND APPROACHES
0392-06-008 Morris/
Atlanta
FM 997 Actual $1,944,729 8 SAFETY TREAT FIXED OBJECTS, ETC.
1052-02-070 Nueces/
Corpus Christi
FM 665 Actual $5,300,000 1 REHAB. AND WIDEN ROADWAY WEST BOUND DIRECTION
0306-01-049 Orange/
Beaumont
SH 87 Actual $76,200 6 REHAB BRIDGE AND APPROACHES
0904-00-127 Potter/
Amarillo
VA Actual $341,393 1 CRACK POURING
0907-13-004 Runnels/
San Angelo
VA Actual $968,267 1 TRANSPORTATION ENHANCEMENT - - DOWNTOWN WINTERS SIDEWALK IMPR
0053-17-024 Scurry/
Abilene
BU 84-G Actual $9,665,767 1 FLEX BASE, STORM_SEWER, CURB & GUTTER,
0039-01-071 Starr/
Pharr
US 83 Actual $7,581,194 1 DISTRICT WIDE OVERLAY
0364-01-131 Tarrant/
Fort Worth
SH 121 Actual $62,600 1 INSTALLATION OF FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL
0902-48-499 Tarrant/
Fort Worth
VA Actual $1,130,580 7 TRAVEL DEMAND MANAGEMENT WITH ADVANCED TRAVELER INFORMATION
0902-48-628 Tarrant/
Fort Worth
VA Actual $2,565,335 1 GUIDE SIGN REPLACEMENT, REMOVAL AND INSTALLATION ON IH 30
0297-03-022 Terry/
Lubbock
US 82 Actual $11,371,000 1 MILLING, GRADING, OVERLAY AND RPMS
0158-02-060 Tom Green/
San Angelo
US 67 Actual $2,761,498 6 REPLACE EXISTING BRIDGES
0907-00-074 Tom Green/
San Angelo
VA Actual $1,046,819 1 RETRACE PAVEMENT MARKINGS & REPLACE RAISED PAVEMENT MARKERS
0703-03-021 Tyler/
Beaumont
FM 256 Actual $1,061,766 11 UPGRADE BRIDGE RAIL
0523-01-025 Waller/
Houston
FM 1098 Actual $2,916,020 11 WIDEN TO 4 - LANE DIVIDED URBAN SECTION
0134-01-021 Young/
Wichita Falls
SH 251 Actual $5,160,856 1 2" HMAC OVERLAY (FULL WIDTH)
0038-04-059 Zapata/
Pharr
US 83 Actual $2,863,478 1 FY 2008 OVERLAY & SEALCOAT PROGRAM
0517-07-034 Zapata/
Pharr
SH 16 Actual $6,605,819 1 WIDEN TO 4 LANE DIVIDED URBAN


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract