0911-00-062 | Angelina/ Lufkin |
VA | Actual | $138,024 | 11 | SHOULDER & CENTERLINE TEXTURING |
3418-01-009 | Angelina/ Lufkin |
FM 1336 | Actual | $648,514 | 8 | WIDEN PAVEMENT TO 26 FT |
0249-02-022 | Archer/ Wichita Falls |
US 281 | Actual | $5,740,172 | 1 | SPOT BASE REPAIR, MILL, SEAL COAT AND OVERLAY |
0016-07-125 | Bexar/ San Antonio |
IH 35 | Actual | $6,610,139 | 11 | RECONFIGURE INTERCHANGE |
0017-10-231 | Bexar/ San Antonio |
IH 35 | Actual | $22,579,569 | 2 | REPLACE WALTERS ST BRIDGE - ADD TURNAROUNDS, RECONST & WIDEN |
0046-05-036 | Bowie/ Atlanta |
US 82 | Actual | $2,784,908 | 6 | REPLACE BRIDGE & APPROACHES |
0587-01-057 | Brazoria/ Houston |
FM 1495 | Actual | $466,099 | 1 | MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND |
0117-01-041 | Brazos/ Bryan |
SH 21 | Actual | $1,046,803 | 1 | REHABILITATE EXISTING ROAD CONSISTING OF SUBGRADE WIDENING, |
0506-04-020 | Burleson/ Bryan |
FM 2155 | Actual | $768,123 | 8 | SAFETY WORK CONSISTING OF GRADING, STRUCTURES, SUBGRADE |
0152-02-058 | Caldwell/ Austin |
US 183 | Actual | $6,118,561 | 6 | CONSTRUCT GRADE SEPARATION |
0420-03-013 | Calhoun/ Yoakum |
SH 172 | Actual | $1,859,949 | 11 | RESTORE ROADWAY |
0224-01-056 | Clay/ Wichita Falls |
US 287 | Actual | $709,834 | 8 | INSTALL MEDIAN BARRIER |
0239-06-010 | Clay/ Wichita Falls |
SH 59 | Actual | $2,618,946 | 1 | WIDEN ROAD AND EXTEND STRUCTURES |
0031-04-043 | Collingsworth/ Childress |
US 83 | Actual | $2,990,073 | 1 | OVERLAY AND UNDERSEAL |
2143-01-008 | Cottle/ Childress |
FM 2278 | Actual | $2,390,405 | 6 | REPLACEMENT OF AN EXISTING BRIDGE FACILITY |
0918-00-137 | Dallas/ Dallas |
VA | Actual | $642,425 | 1 | ASBESTOS ABATEMENT ON BRIDGES IN ADVANCE OF OTHER |
0918-45-369 | Dallas/ Dallas |
CS | Actual | $2,116,402 | 7 | WIDEN 4 - LANE FACILITY TO 6 - LANE FACILITY |
0918-45-689 | Dallas/ Dallas |
VA | Actual | $738,225 | 5 | SPREAD SYSTEM RADIO SYSTEM UPGRADE |
1047-03-061 | Dallas/ Dallas |
FM 1382 | Actual | $1,730,444 | 1 | MILL, LEVEL - UP, OVERLAY AND ADA RAMPS |
0918-46-142 | Denton/ Dallas |
VA | Actual | $1,387,295 | 9 | 10 FT. WIDE CONCRETE PEDESTRIAN TRAIL |
0310-01-038 | Donley/ Childress |
SH 70 | Actual | $1,540,382 | 1 | OVERLAY |
0001-05-015 | El Paso/ El Paso |
FM 259 | Actual | $2,300,725 | 1 | 2008 SEAL COAT PROGRAM |
1046-03-001 | El Paso/ El Paso |
SS 601 | Actual | 365,818,000 | 10 | CONSTRUCT NEW SIX LANE DIVIDED ROAD AND INTERCHANGES |
0902-49-057 | Erath/ Fort Worth |
CR | Actual | $163,558 | 6 | REPLACE BRIDGE AND APPROACHES |
2105-01-043 | Fort Bend/ Houston |
FM 2234 | Actual | $3,381,847 | 1 | BASE REPAIR AND OVERLAY |
0912-73-083 | Galveston/ Houston |
CS | Actual | $1,125,442 | 9 | LANDSCAPING BEAUTIFICATION |
0925-09-024 | Hall/ Childress |
VA | Actual | $94,273 | 10 | LANDSCAPE |
0925-07-020 | Hardeman/ Childress |
CR | Actual | $1,043,783 | 6 | REPLACE BRIDGE AND APPROACHES |
0389-13-040 | Harris/ Houston |
SH 146 | Actual | $16,205,858 | 7 | CONSTRUCT DIRECT CONNECTOR AND BRAIDED RAMP |
0508-01-292 | Harris/ Houston |
IH 10 | Actual | $20,207,783 | 11 | REPLACING PAVEMENT AND PARTIAL WIDEN |
0912-71-427 | Harris/ Houston |
CS | Actual | $1,833,442 | 11 | 2 LANES ON NEW LOCATION |
0912-71-655 | Harris/ Houston |
VA | Actual | $1,269,879 | 5 | HIKE AND BIKE TRAIL (WEST HOUSTON PHASE 2) |
1685-03-084 | Harris/ Houston |
FM 1960 | Actual | $3,073,385 | 1 | MILLING, SHOULDER WIDENING & ASPHALT OVERLAY |
0016-03-092 | Hays/ Austin |
IH 35 | Actual | $2,200,236 | 1 | REVERSE EXISTING SB RAMPS |
0030-05-059 | Hemphill/ Amarillo |
US 60 | Actual | $9,732,590 | 11 | REHABILITATE EXISTING ROADWAY |
0920-12-034 | Jasper/ Beaumont |
CR | Actual | $297,099 | 6 | REPLACE BRIDGE AND APPROACHES |
0028-06-068 | Jefferson/ Beaumont |
US 90 | Actual | $5,793,194 | 1 | SEAL COAT |
0028-13-128 | Jefferson/ Beaumont |
IH 10 | Actual | $258,146 | 11 | RESTRIPE EXISTING ROADWAY |
0200-14-072 | Jefferson/ Beaumont |
US 69 | Actual | $923,216 | 11 | REPLACE GUARDRAIL & INSTALL MOWSTRIP |
0739-02-139 | Jefferson/ Beaumont |
IH 10 | Actual | $5,646,455 | 11 | OVERLAY EXISTING ROADWAY |
0019-01-131 | Johnson/ Fort Worth |
SH 174 | Actual | $70,940 | 1 | INSTALLATION OF SCHOOL ZONE FLASHERS |
0443-02-013 | Kaufman/ Dallas |
SH 198 | Actual | $6,970,336 | 1 | RECONSTRUCT TO 4 LANE UNDIVIDED URBAN |
1135-03-016 | Kerr/ San Antonio |
FM 1341 | Actual | $3,505,451 | 4 | REALIGN FARM TO MARKET ROAD ALONG EXISTING CITY STREET |
0018-02-052 | La Salle/ Laredo |
IH 35 | Actual | $6,443,077 | 1 | FOR THE CONSTRUCTION OF SEAL COAT TYPE OF WORK |
0905-00-045 | Lubbock/ Lubbock |
VA | Actual | $644,397 | 1 | MISCELLANEOUS CONSTRUCTION |
0675-05-068 | Madison/ Bryan |
IH 45 | Actual | $2,214,446 | 1 | SAFETY WORK CONSISTING OF THE INSTALLATION OF A MEDIAN |
1753-01-016 | Mason/ Austin |
RM 1871 | Actual | $3,156,786 | 6 | REPLACE BRIDGE AND APPROACHES |
0392-06-008 | Morris/ Atlanta |
FM 997 | Actual | $1,944,729 | 8 | SAFETY TREAT FIXED OBJECTS, ETC. |
1052-02-070 | Nueces/ Corpus Christi |
FM 665 | Actual | $5,300,000 | 1 | REHAB. AND WIDEN ROADWAY WEST BOUND DIRECTION |
0306-01-049 | Orange/ Beaumont |
SH 87 | Actual | $76,200 | 6 | REHAB BRIDGE AND APPROACHES |
0904-00-127 | Potter/ Amarillo |
VA | Actual | $341,393 | 1 | CRACK POURING |
0907-13-004 | Runnels/ San Angelo |
VA | Actual | $968,267 | 1 | TRANSPORTATION ENHANCEMENT - - DOWNTOWN WINTERS SIDEWALK IMPR |
0053-17-024 | Scurry/ Abilene |
BU 84-G | Actual | $9,665,767 | 1 | FLEX BASE, STORM_SEWER, CURB & GUTTER, |
0039-01-071 | Starr/ Pharr |
US 83 | Actual | $7,581,194 | 1 | DISTRICT WIDE OVERLAY |
0364-01-131 | Tarrant/ Fort Worth |
SH 121 | Actual | $62,600 | 1 | INSTALLATION OF FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL |
0902-48-499 | Tarrant/ Fort Worth |
VA | Actual | $1,130,580 | 7 | TRAVEL DEMAND MANAGEMENT WITH ADVANCED TRAVELER INFORMATION |
0902-48-628 | Tarrant/ Fort Worth |
VA | Actual | $2,565,335 | 1 | GUIDE SIGN REPLACEMENT, REMOVAL AND INSTALLATION ON IH 30 |
0297-03-022 | Terry/ Lubbock |
US 82 | Actual | $11,371,000 | 1 | MILLING, GRADING, OVERLAY AND RPMS |
0158-02-060 | Tom Green/ San Angelo |
US 67 | Actual | $2,761,498 | 6 | REPLACE EXISTING BRIDGES |
0907-00-074 | Tom Green/ San Angelo |
VA | Actual | $1,046,819 | 1 | RETRACE PAVEMENT MARKINGS & REPLACE RAISED PAVEMENT MARKERS |
0703-03-021 | Tyler/ Beaumont |
FM 256 | Actual | $1,061,766 | 11 | UPGRADE BRIDGE RAIL |
0523-01-025 | Waller/ Houston |
FM 1098 | Actual | $2,916,020 | 11 | WIDEN TO 4 - LANE DIVIDED URBAN SECTION |
0134-01-021 | Young/ Wichita Falls |
SH 251 | Actual | $5,160,856 | 1 | 2" HMAC OVERLAY (FULL WIDTH) |
0038-04-059 | Zapata/ Pharr |
US 83 | Actual | $2,863,478 | 1 | FY 2008 OVERLAY & SEALCOAT PROGRAM |
0517-07-034 | Zapata/ Pharr |
SH 16 | Actual | $6,605,819 | 1 | WIDEN TO 4 LANE DIVIDED URBAN |
|
|