Letting Schedule for Houston District (FY 2008)

 
 
Last Update: Monday, February 2, 2009
Houston District (FY 2008)
Brazoria | Fort Bend | Galveston | Harris | Montgomery | Waller

Brazoria County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0587-01-057 FM 1495 Actual DEC 2007 $466,099 1 MILL, ONE - COURSE SURFACE TREATMENT, ASPHALT OVERLAY AND
0598-02-042 SH 288 Actual AUG 2008 $9,343,968 11 NB AND SB FRONTAGE ROADS AND BRIDGES OVER HICKORY SLOUGH
0598-03-023 SH 288 Actual NOV 2007 $367,728 10 LANDSCAPE DEVELOPMENT
0912-31-137 VA Actual SEP 2007 $1,149,986 9 BEAUTIFICATION
1004-01-049 FM 524 Actual JUN 2008 $70,099 1 PE FOR HYDRAULIC STUDY

Fort Bend County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0543-02-058 FM 359 Actual JAN 2008 $500,000 10 LEFT AND RIGHT TURN LANES BY PERMIT
0912-34-093 CR Actual SEP 2007 $922,828 6 REPLACE BRIDGE
0912-34-097 CS Actual JAN 2008 $282,565 9 RESTORATION OF SOUTHERN PACIFIC RAILROAD DEPOT
0912-34-124 VA Actual JUN 2008 $1,848,532 11 INSTALL PIPE LINER
1415-02-030 FM 1464 Actual SEP 2007 $25,977,030 1 WIDEN 2 LANES UNDIVIDED TO 4 LANES DIVIDED
2105-01-043 FM 2234 Actual DEC 2007 $3,381,847 1 BASE REPAIR AND OVERLAY
3048-01-012 FM 2977 Actual SEP 2007 $2,116,094 1 BASE REPAIR AND OVERLAY

Galveston County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0912-73-082 CS Actual OCT 2007 $223,779 9 PEDESTRIAN BARRIER FENCING, LANDSCAPE, AND IRRIGATION
0912-73-083 CS Actual DEC 2007 $1,125,442 9 LANDSCAPING BEAUTIFICATION
0912-73-127 VA Actual OCT 2007 $593,050 1 COUNTY WIDE FULL DEPTH CONCRETE REPAIR AND SPALL REPAIR
0912-73-136 CS Actual SEP 2007 $4,500,000 5 INTERMODAL CENTER AND PARKING GARAGE (ORIGINALLY ON THE
0976-05-023 FM 1266 Actual OCT 2007 $475,693 1 PLACE CONCRETE RIPRAP ON STEEP NON - MAINTAINABLE DITCH SLOPES

Harris County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0110-07-021 SP 261 Actual SEP 2007 $293,066 10 LANDSCAPE DEVELOPMENT
0111-01-088 FM 521 Actual JAN 2008 $409,496 1 REHABILITATE INTERSECTIONS
0114-12-006 US 290 Actual JAN 2008 $5,252,715 1 EDGE DRAINS, ACP OVERLAY AND PAVEMENT MARKINGS
0271-14-216 IH 610 Actual FEB 2008 $37,000 10 INSTALL PIER PROTECTION FOR EXISTING BRIDGE COLUMNS,
0271-15-085 IH 610 Actual NOV 2007 $1,255,955 10 LANDSCAPE DEVELOPMENT
0271-16-128 IH 610 Actual MAR 2008 $873,510 11 LANDSCAPE DEVELOPMENT
0389-13-040 SH 146 Actual DEC 2007 $16,205,858 7 CONSTRUCT DIRECT CONNECTOR AND BRAIDED RAMP
0389-15-014 BS 146D Actual JUL 2008 $3,059,787 6 REPLACE BRIDGE AND APPROACHES
0500-03-551 IH 45 Actual SEP 2007 $583,753 1 BASE REPAIR, MILLING AND OVERLAY
0500-03-552 IH 45 Actual APR 2008 $170,011 1 CLEAN AND PAINT EXISTING STRUCTURE
0500-03-557 IH 45 Actual JUN 2008 $308,204 11 REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER AND INSTALL
0502-01-204 SH 225 Actual JAN 2008 $1,239,355 1 INSTALL HIGH MAST ILLUMINATION
0508-01-292 IH 10 Actual DEC 2007 $20,207,783 11 REPLACING PAVEMENT AND PARTIAL WIDEN
0508-01-298 IH 10 Actual NOV 2007 $19,270,604 6 CONSTRUCT AUXILIARY LANES, MILLING, AND OVERLAY ON FRONTAGE
0508-01-309 IH 10 Actual OCT 2007 $3,468,680 6 FENDER SYSTEM AND SUPPORT COLUMN PROTECTION SYSTEM
0508-01-322 IH 10 Actual NOV 2007 $1,045,497 10 LANDSCAPE DEVELOPMENT
0508-01-325 IH 10 Actual SEP 2007 $1,148,288 10 LANDSCAPE DEVELOPMENT
0508-01-327 IH 10 Actual JUN 2008 $269,902 11 REPLACE PAVEMENT MARKINGS WITH MULTI POLYMER AND INSTALL
0598-01-084 SH 288 Actual SEP 2007 $367,603 1 DRAINAGE IMPROVEMETS (INLETS, EXTENSIONS AND DRAINS)
0912-00-215 VA Actual SEP 2007 $1,500,000 5 FY 2000 BIKE RACKS ON METRO BUSES
0912-00-309 VA Actual JUN 2008 $45,968 1 HORIZONTAL / ANGLE CORE DRILLING
0912-00-319 VA Actual NOV 2007 $700,138 1 REPAIR / REPLACE HIGH MAST FOUNDATIONS (ASR DAMAGE) AND BRIDGE
0912-00-323 VA Actual NOV 2007 $480,245 1 REPLACE EXISTING DETECTOR LOOPS WITH VIVDS
0912-00-328 VA Actual SEP 2007 $255,000 5 ITS - COMMUNICATIONS (3 YEAR)
0912-00-343 VA Actual SEP 2007 $2,211,154 10 LANDSCAPE DEVELOPMENT
0912-00-344 VA Actual SEP 2007 $8,377,285 5 VOLUNTARY MOBILE EMISSIONS REDUCTION ACTIVITIES
0912-00-346 VA Actual SEP 2007 $1,001,475 11 DESIGN / CONSTRUCT STREETSCAPE IMPROVEMENTS FOR PEDESTRIAN
0912-00-347 VA Actual SEP 2007 $400,000 5 PARK AND RIDE SERVICES TO HOUSTON: OPERATING COSTS FOR YEAR 1
0912-00-351 VA Actual APR 2008 $858,865 11 PAVEMENT MARKINGS
0912-00-354 VA Actual FEB 2008 $1,875,000 9 PLANNING AND FEASIBILITY STUDIES FOR LIVABLE CENTERS
0912-00-356 VA Actual JUN 2008 $1,875,000 7 VISION PLANNING STUDY
0912-70-011 VA Actual JUL 2008 $1,373,789 11 LANDSCAPE DEVELOPMENT
0912-71-427 CS Actual DEC 2007 $1,833,442 11 2 LANES ON NEW LOCATION
0912-71-655 VA Actual DEC 2007 $1,269,879 5 HIKE AND BIKE TRAIL (WEST HOUSTON PHASE 2)
0912-71-700 CS Actual JUL 2008 $3,326,644 9 MKT / SP RAILROAD TO TRAIL
0912-71-800 CS Actual JUL 2008 $1,347,373 9 PHASE I SHARED USE PATH
0912-72-002 CS Actual JUL 2008 $2,870,554 6 REPLACE BRIDGE AND APPROACHES
0912-72-007 CS Actual MAR 2008 $7,836,892 5 RIGHT TURN LANES AND DRAINAGE IMPROVEMENTS
0912-72-048 CS Actual SEP 2007 $491,964 11 CORRIDOR INTERMODAL FACILITY
0912-72-062 VA Actual JAN 2008 $3,070,063 1 SHOULDER & EDGE REPAIR, FULL DEPTH REPAIR, BRIDGE & ARMOR
0912-72-069 CS Actual SEP 2007 $751,106 11 CONSTRUCT PEDESTRIAN / BICYCLE TRAIL
0912-72-074 VA Actual NOV 2007 $422,156 10 MIDTOWN LIVABLE COMMUNITIES INITIATIVE (PHASE III)
0912-72-082 VA Actual NOV 2007 $398,374 1 MISCELLANEOUS DRAINAGE REPAIRS
0912-72-083 VA Actual AUG 2008 $1,122,979 5 HARRIS COUNTY SIGNAL PROJECT PHASE 2
0912-72-085 VA Actual AUG 2008 $1,105,213 5 HARRIS COUNTY SIGNAL PROJECT PHASE 2
0912-72-086 VA Actual AUG 2008 $1,234,249 5 HARRIS COUNTY SIGNAL PROJECT PHASE 2
0912-72-108 VA Actual MAY 2008 $390,964 11 MISCELLANEOUS BRIDGE REPAIRS
0912-72-109 VA Actual JAN 2008 $1,634,427 1 MISCELLANEOUS BRIDGE AND BRIDGE APPROACH REPAIRS
0912-72-145 VA Actual SEP 2007 $135,000 5 PEDESTRIAN IMPROVEMENTS
0912-72-146 VA Actual SEP 2007 $224,000 5 PEDESTRIAN IMPROVEMENTS
0912-72-147 CS Actual SEP 2007 $1,472,800 5 DESIGN AND CONSTRUCTION OF UPTOWN PEDESTRIAN / TRANSIT
0912-72-148 VA Actual NOV 2007   10 LANDSCAPE - OST / ALMEDA CORRIDORS REDEVELOPMENT AUTHORITY IN
0912-72-149 CS Actual SEP 2007 $1,502,212 10 1 - STORY 300 - VEHICLE PARKING GARAGE
0912-72-150 VA Actual SEP 2007 $1,250,000 7 2007 TRANSTAR CAPITAL UPGRADE FOR PURCHASE OF SOFTWARE AND
0912-72-152 CS Actual SEP 2007 $1,839,250 5 UPTOWN INTERSECTION IMPROVEMENT PROGRAM - 2 INTERSECTIONS
0912-72-154 VA Actual SEP 2007 $2,341,875 5 SIGNATURE BUS SERVICE & PARK AND RIDE SERVICE ALONG IH 10
0912-72-159 VA Actual FEB 2008 $449,753 1 REPLACEMENT, ADDITION OR REMOVAL OF VERTICAL CLEARANCE SIGNS
0912-72-160 VA Actual MAR 2008 $1,760,877 11 LANDSCAPE DEVELOPMENT
0912-72-165 CS Actual FEB 2008 $1,575,000 7 ITS UPGRADES (FY 2009)
0912-72-166 CS Actual FEB 2008 $1,653,750 7 ITS UPGRADES (FY 2010)
0912-72-167 VA Actual FEB 2008 $1,823,259 7 ITS CAPITAL UPGRADES (FY 2011)
0912-72-169 VA Actual FEB 2008 $607,753 7 INSTALL EMERGENCY GENERATOR
0912-72-170 VA Actual FEB 2008 $206,636 7 UPGRADE TELEPHONE SWITCH
0912-72-171 VA Actual FEB 2008 $230,946 7 INSTALL TELECONFERENCING, VIDEOCONFERENCING AND MANAGEMENT
0912-72-172 VA Actual FEB 2008 $2,625,000 7 TRANSTAR COMPUTER ROOM EXPANSION
0912-72-173 VA Actual JAN 2008 $3,038,766 7 TRANSTAR 1ST FLOOR MULTIPURPOSE ROOM
0912-72-174 VA Actual JAN 2008 $2,625,000 7 TRANSTAR EMERGENCY OPERATIONS CENTER EXPANSION
0912-72-175 VA Actual JAN 2008 $1,968,750 7 TRANSTAR OPERATIONS AND MANAGEMENT
0912-72-178 VA Actual APR 2008 $888,968 11 PAVEMENT MARKINGS
1685-01-086 FM 1960 Actual JAN 2008 $989,977 1 CRACK, SPALL AND FULL DEPTH REPAIR
1685-03-084 FM 1960 Actual DEC 2007 $3,073,385 1 MILLING, SHOULDER WIDENING & ASPHALT OVERLAY
1685-05-091 SH 6 Actual JAN 2008 $2,477,848 1 PLANNING, ONE COURSE SURFACE TREATMENT, ACP OVERLAY WITH
3256-01-091 BW 8 Actual FEB 2008 $142,831 1 REPAIR BRIDGE

Montgomery County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0177-05-104 US 59 Actual JAN 2008 $844,789 2 CONSTRUCT DETENTION FACILITY WITH CHANNEL IMPROVEMENTS
0177-05-107 US 59 Actual MAY 2008 $1,299,419 10 LANDSCAPE DEVELOPMENT
0523-10-039 FM 1488 Actual NOV 2007 $477,445 10 PREPARE ROW FOR WIDEN TO 4 LANES (PTF)
0912-37-166 CR Actual JAN 2008 $2,742,837 6 REPLACE BRIDGE AND APPROACHES
0912-37-181 VA Actual JAN 2008 $937,795 1 BASE REPAIR, CRACK SEAL AND PAVEMENT MARKINGS
1062-03-042 FM 1485 Actual OCT 2007 $7,331,921 10 WIDEN TO 4 LANE DIVIDED (PTF)
1417-01-026 FM 1484 Actual JUL 2008 $21,175,679 1 WIDEN TO 4 LANE DIVIDED (PTF)
1417-01-027 FM 1484 Actual JAN 2008 $1,946,739 1 BASE REPAIR, ONE COARSE SURFACE TREATMENT AND ASPHLT OVERLAY
2897-01-013 FM 830 Actual JUL 2008 $185,825 11 WIDEN FOR LEFT AND RIGHT TURN LANES
3538-01-033 SH 242 Actual NOV 2007 $623,438 1 ADD RIGHT TURN LANES ALONG SH 242

Waller County

CCSJ Highway Let Status Letting
Date
Contract
Cost
Fund
Cat
Description
0523-01-025 FM 1098 Actual DEC 2007 $2,916,020 11 WIDEN TO 4 - LANE DIVIDED URBAN SECTION
0523-02-033 FM 362 Actual MAR 2008 $1,782,964 11 REPLACE BRIDGE AND APPROACHES
0523-02-035 FM 362 Actual OCT 2007 $884,320 1 RESHAPING AND STABILIZE EROSION AT MILLER DRAINAGE EASEMENT
1418-01-009 FM 1489 Actual SEP 2007 $155,531 1 SEAL COAT, 1 - 1 / 2" OVERLAY AND PAVEMENT MARKINGS


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract