SEP 2007 | OCT 2007 | NOV 2007 | DEC 2007 | JAN 2008 | FEB 2008 | MAR 2008 | APR 2008 | MAY 2008 | JUN 2008 | JUL 2008 | AUG 2008
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0176-03-129 Angelina/
Lufkin
BU 59-G Actual $664,494 10 CONCRETE PAVEMENT / JOINT REPAIRS AND OVERLAY
0320-01-059 Bell/
Waco
US 190 Actual $7,679,629 6 REPLACE RAILROAD UNDERPASS
2304-03-010 Bell/
Waco
FM 2484 Actual $325,840 1 ADD LEFT TURN LANES
0024-08-122 Bexar/
San Antonio
US 90 Actual $4,147,324 1 REPLACE NARROW BRIDGE & APPROACHES
2104-02-028 Bexar/
San Antonio
FM 1957 Actual $2,193,717 1 ULTRATHIN BONDED WEARING COURSE & PAVEMENT MARKINGS (TO
0049-12-069 Brazos/
Bryan
SH 6 Actual $8,150,790 3 PHASE 2 CONSTRUCTION TO ADD AND RELOCATE ENTRANCE AND EXIT
0049-12-073 Brazos/
Bryan
SH 6 Actual $7,446,378 1 SEAL COAT CONSISTING OF A ONE COURSE SURFACE TREATMENT AND
0923-00-052 Brown/
Brownwood
VA Actual $433,910 1 THERMOPLASTIC STRIPING
0116-03-057 Burleson/
Bryan
SH 21 Actual $976,131 1 REHABILITATE EXISTING BRIDGE FACILITY CONSISTING OF GRADING,
1140-02-032 Cameron/
Pharr
FM 802 Actual $6,676,151 10 WIDEN TO 6 LANE DIVIDED
0218-03-080 Cass/
Atlanta
US 59 Actual $6,212,836 1 SEAL COAT
0920-39-020 Chambers/
Beaumont
VA Actual $177,520 11 COUNTY ROAD SIGN REPLACEMENT
0027-02-030 Colorado/
Yoakum
FM 102 Actual $5,198,990 1 SEAL COAT
0032-04-029 Cottle/
Childress
US 83 Actual $1,121,504 6 REPLACE EXIST BRIDGE FACILITY
0925-15-004 Dickens/
Childress
CR Actual $774,123 6 REPLACE EXIST BRIDGE FACILITY
1773-01-009 Dickens/
Childress
FM 1868 Actual $1,476,916 6 REPLACE BRIDGE AND APPROACHES
0923-09-049 Eastland/
Brownwood
CR Actual $1,075,373 6 REPLACE BRIDGE AND APPROACHES
0906-06-047 Ector/
Odessa
CS Actual $49,650 8 ELIMINATION OF ROADWAY HAZARDS
0026-03-041 Fayette/
Yoakum
US 90 Actual $5,755,136 1 SEAL COAT
0098-03-033 Foard/
Childress
SH 6 Actual $6,186,104 6 REPLACE BRIDGE AND APPROACHES
0675-01-056 Freestone/
Bryan
IH 45 Actual $2,743,078 8 SAFETY WORK CONSISTING OF THE INSTALLATION OF A MEDIAN
0017-07-088 Frio/
San Antonio
IH 35 Actual $676,442 6 WIDEN NARROW BRIDGE & APPROACHES
0912-73-082 Galveston/
Houston
CS Actual $223,779 9 PEDESTRIAN BARRIER FENCING, LANDSCAPE, AND IRRIGATION
0912-73-127 Galveston/
Houston
VA Actual $593,050 1 COUNTY WIDE FULL DEPTH CONCRETE REPAIR AND SPALL REPAIR
0976-05-023 Galveston/
Houston
FM 1266 Actual $475,693 1 PLACE CONCRETE RIPRAP ON STEEP NON - MAINTAINABLE DITCH SLOPES
0508-01-309 Harris/
Houston
IH 10 Actual $3,468,680 6 FENDER SYSTEM AND SUPPORT COLUMN PROTECTION SYSTEM
0919-03-031 Harrison/
Atlanta
VA Actual $1,955,676 10 RECONSTRUCT PARKING & PROVIDE ADA ACCESS AT CADDO LAKE STATE
0039-17-157 Hidalgo/
Pharr
US 83 Actual $1,112,897 10 LANDSCAPE AND IRRIGATION IMPROVEMENTS
0083-04-027 Hopkins/
Paris
SH 11 Actual $3,793,226 1 REHABILITATE AND WIDEN
0086-11-039 Jim Wells/
Corpus Christi
SH 44 Actual $5,416,982 1 SEAL COAT ROADWAY EB & WB MAINLANES (2008 LOW CONTROL PROJECT)
0260-01-050 Johnson/
Wichita Falls
US 67 Actual $8,973,985 1 SEAL TRAVEL LANES AND SHOULDERS
0996-02-013 Limestone/
Waco
FM 638 Actual $1,610,108 6 REPLACE BRIDGE AND APPROACHES
0380-15-016 Lubbock/
Lubbock
SP 327 Actual $23,504,611 1 CONVERT NON - FREEWAY TO FREEWAY
0905-00-040 Lubbock/
Lubbock
VA Actual $6,153,094 1 PUMP STATION SAFETY UPGRADE
0905-00-042 Lubbock/
Lubbock
VA Actual $822,245 10 MISCELLANEOUS CONSTRUCTION
0013-02-019 Montague/
Wichita Falls
US 81 Actual $7,451,433 1 SEAL COAT
1062-03-042 Montgomery/
Houston
FM 1485 Actual $7,331,921 10 WIDEN TO 4 LANE DIVIDED (PTF)
0904-00-125 Potter/
Amarillo
VA Actual $257,386 1 CRACK POURING
0904-00-126 Potter/
Amarillo
VA Actual $322,087 1 CRACK POURING
2494-01-010 Potter/
Amarillo
RM 2381 Actual $5,622,816 1 REHAB AND WIDEN EXISTING ROADWAY
0101-08-002 San Patricio/
Corpus Christi
SH 89 Actual $5,258,317 1 OVERLAY ROADWAY
0191-01-064 Smith/
Tyler
US 69 Actual $11,338,450 1 CONSTRUCT GRADE - SEPARATED INTERCHANGE
0907-00-070 Tom Green/
San Angelo
VA Actual $1,648,187 1 INSTALL ILLUMINATION ASSEMBLIES
0914-04-175 Travis/
Austin
VA Actual $454,158 10 CONSTRUCT ROADWAY IMPROVMENTS, PARKING & DRAINAGE
0914-04-233 Travis/
Austin
CR Actual $297,931 8 INSTALL TRAFFIC SIGNAL
0160-06-022 Val Verde/
Laredo
US 277 Actual $2,272,431 1 REHABILITATION OF AN EXISTING ROADWAY
0095-06-062 Van Zandt/
Tyler
US 80 Actual $2,835,002 8 IMPROVE AND INTERCONNECT TRAFFIC SIGNALS
0523-02-035 Waller/
Houston
FM 362 Actual $884,320 1 RESHAPING AND STABILIZE EROSION AT MILLER DRAINAGE EASEMENT
0922-33-077 Webb/
Laredo
CR Actual $738,793 6 FOR THE CONSTRUCTION OF THE REPLACEMENT OF AN EXISTING
0804-04-022 Wichita/
Wichita Falls
FM 368 Actual $671,172 1 REPLACE BRIDGE AND APPROACHES
0043-05-102 Wilbarger/
Wichita Falls
US 287 Actual $1,177,482 6 REPLACE BRIDGE AND APPROACHES
0284-01-045 Young/
Wichita Falls
SH 79 Actual $122,398 1 NEW TRAFFIC SIGNAL
0276-04-022 Zavala/
Laredo
US 57 Actual $7,190,083 1 WIDEN RDWY TO PROVIDE PASSING LANES (SUPER 2)


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract