0265-05-070 Bastrop/
Austin
SH 71 Actual $4,932,682 1 SEAL & OVERLAY
1063-01-026 Bee/
Corpus Christi
FM 673 Actual $227,014 8 ADD ILLUMINATION, SOLAR POWDER FLASHING BEACON & LT TURN LANE
0017-02-071 Bexar/
San Antonio
IH 35 Actual $8,385,286 11 RECONSTRUCT FRONTAGE ROADS / RAMPS, REPLACE FR RD BRIDGES @
0017-10-233 Bexar/
San Antonio
IH 35 Actual $939,261 6 WIDEN NARROW BRIDGE & APPROACHES
0100-02-057 Bexar/
San Antonio
US 181 Actual $976,495 6 WIDEN NARROW BRIDGE & APPROACHES
0915-00-135 Bexar/
San Antonio
VA Actual $713,342 8 DISTRICTWIDE TRAFFIC CONTROL DEVICES (FY2008) / 2010 - PROJECT 1
0915-00-140 Bexar/
San Antonio
VA Actual $870,771 8 DISTRICTWIDE TRAFFIC CONTROL DEVICES (FY2008) / 2010 - PROJECT 2
0915-12-399 Bexar/
San Antonio
CS Actual $1,794,056 9 REHABILITATE HISTORIC STAGE COACH STOP & CONSTRUCT A VISITOR
2440-01-020 Bexar/
San Antonio
FM 2536 Actual $11,525,779 7 REPLACE BRIDGE OVER UNION PACIFIC RAILROAD
0010-13-081 Bowie/
Atlanta
US 67 Actual $378,506 1 IMPROVE TRAFFIC SIGNAL AND SAFETY LIGHTING AT INTERSECTION
0062-01-032 Bowie/
Atlanta
SH 8 Actual $954,803 11 REALIGN SH 8 / US 67 INTERSECTION
0252-01-064 Burnet/
Austin
US 281 Actual $1,668,430 1 MILL & OVERLAY
0914-24-010 Burnet/
Austin
CR Actual $412,379 8 IMPROVE GURARDRAIL AND SAFETY TREAT
0872-03-009 Cameron/
Pharr
FM 733 Actual $1,351,213 1 RESTORE AND REHABILITATE PAVEMENT AND WIDEN
1801-01-042 Cameron/
Pharr
FM 1847 Actual $10,579,803 1 WIDEN TO 4 LANE DIVIDED
0083-07-037 Camp/
Atlanta
SH 11 Actual $1,655,438 1 SEAL COAT
0199-02-054 Cherokee/
Tyler
US 69 Actual $2,367,571 1 RESURFACE ROADWAY
0925-00-056 Childress/
Childress
VA Actual $1,198,730 1 STRIPING
0387-05-016 Collin/
Dallas
FM 982 Actual $7,173,041 1 RECONSTRUCT RURAL 2 LANE HIGHWAY TO 2 LANE RURAL WITH
1793-01-008 Colorado/
Yoakum
FM 1890 Actual $1,290,786 6 REPLACE BRIDGE AND APPROACHES
0845-03-045 Cooke/
Wichita Falls
FM 922 Actual $6,295,375 1 WIDEN ROAD AND EXTEND STRUCTURES
1047-02-045 Dallas/
Dallas
FM 1382 Actual $1,091,383 1 MILL, INLAY AND ADA RAMPS
2374-07-048 Dallas/
Dallas
IH 635 Actual $459,793 10 CONSTRUCT 2 LANE EB FRONTAGE ROAD
0924-06-199 El Paso/
El Paso
CS Actual $6,915,598 10 091824142CTION AND UPGRADING OF VINTON ROAD
0924-06-306 El Paso/
El Paso
VA Actual $500,000 1 TRAFFIC MANAGEMENT MAINTENANCE
2552-04-037 El Paso/
El Paso
LP 375 Actual $250,000 1 ABR TRANSFER FROM CONSTRUCTION TO MAINTENANCE
0913-28-049 Fayette/
Yoakum
CR Actual $1,094,941 6 REPLACE BRIDGE AND APPROACHES
0543-02-058 Fort Bend/
Houston
FM 359 Actual $500,000 10 LEFT AND RIGHT TURN LANES BY PERMIT
0912-34-097 Fort Bend/
Houston
CS Actual $282,565 9 RESTORATION OF SOUTHERN PACIFIC RAILROAD DEPOT
1499-01-023 Frio/
San Antonio
FM 1581 Actual $2,400,576 6 WIDEN NARROW BRIDGE & APPROACHES
0045-19-040 Grayson/
Paris
US 82 Actual $6,530,285 3 WIDEN FROM 2 - LANE TO 4 - LANE DIVIDED
0081-10-035 Grayson/
Paris
US 377 Actual $1,503,234 1 LEVEL UP EXISTING SHOULDERS WITH HOT MIXED ASPHALTIC
0145-04-034 Hale/
Lubbock
US 70 Actual $2,781,666 1 OVERLAY
0813-03-039 Hardin/
Beaumont
FM 421 Actual $2,538,043 11 RESTORE EXISTING ROADWAY AND ADD SHOULDERS
0920-03-063 Hardin/
Beaumont
CR Actual $625,277 6 REPLACE BRIDGE AND APPROACHES
0111-01-088 Harris/
Houston
FM 521 Actual $409,496 1 REHABILITATE INTERSECTIONS
0114-12-006 Harris/
Houston
US 290 Actual $5,252,715 1 EDGE DRAINS, ACP OVERLAY AND PAVEMENT MARKINGS
0502-01-204 Harris/
Houston
SH 225 Actual $1,239,355 1 INSTALL HIGH MAST ILLUMINATION
0912-72-062 Harris/
Houston
VA Actual $3,070,063 1 SHOULDER & EDGE REPAIR, FULL DEPTH REPAIR, BRIDGE & ARMOR
0912-72-109 Harris/
Houston
VA Actual $1,634,427 1 MISCELLANEOUS BRIDGE AND BRIDGE APPROACH REPAIRS
0912-72-173 Harris/
Houston
VA Actual $3,038,766 7 TRANSTAR 1ST FLOOR MULTIPURPOSE ROOM
0912-72-174 Harris/
Houston
VA Actual $2,625,000 7 TRANSTAR EMERGENCY OPERATIONS CENTER EXPANSION
0912-72-175 Harris/
Houston
VA Actual $1,968,750 7 TRANSTAR OPERATIONS AND MANAGEMENT
1685-01-086 Harris/
Houston
FM 1960 Actual $989,977 1 CRACK, SPALL AND FULL DEPTH REPAIR
1685-05-091 Harris/
Houston
SH 6 Actual $2,477,848 1 PLANNING, ONE COURSE SURFACE TREATMENT, ACP OVERLAY WITH
0914-33-042 Hays/
Austin
CR Actual $709,992 8 SAFETY TREAT FIXED OBJECTS
1776-01-028 Hays/
Austin
RM 967 Actual $366,198 1 1 COURSE SURFACE TREATMENT & OVERLAY
0048-09-028 Hill/
Waco
IH 35E Actual $4,787,647 1 PLANING, SEAL AND ACP OVERLAY
0117-06-042 Houston/
Lufkin
SH 21 Actual $1,604,202 1 HOT ASPHALT - RUBBER SURFACE TREATMENT
0947-01-018 Jasper/
Beaumont
FM 253 Actual $773,790 11 OVERLAY EXISTING ROADWAY
0920-38-173 Jefferson/
Beaumont
CS Actual $385,699 6 REPLACE BRIDGE AND APPROACHES
0072-04-033 Kendall/
San Antonio
US 87 Actual $767,586 1 ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS
0142-06-026 Kendall/
San Antonio
SH 27 Actual $350,670 1 ULTRATHIN BONDED WEARING COURSE AND PAVEMENT MARKINGS
1814-01-010 Kinney/
Laredo
FM 1908 Actual $3,559,817 11 RESTORATION OF AN EXISTING ROADWAY
0102-06-027 Kleberg/
Corpus Christi
SH 285 Actual $3,781,799 1 ADD PASSING LANES
0483-01-039 La Salle/
Laredo
SH 97 Actual $3,010,300 1 RESTORATION OF AN EXISTING HIGHWAY
0335-03-040 Leon/
Bryan
SH 7 Actual $1,216,072 1 REHABILLITATION OF EXISTING ROAD CONSISTING OF GRADING,
0643-01-049 Leon/
Bryan
FM 39 Actual $3,423,978 1 REHABILITATE EXISTING ROAD CONSISTING OF GRADING,
0177-03-088 Liberty/
Beaumont
US 59 Actual $699,801 8 INSTALL MEDIAN BARRIER
0593-01-089 Liberty/
Beaumont
SH 321 Actual $1,130,916 11 REPLACE BRIDGE AND APPROACHES
0014-10-059 McLennan/
Waco
BU 77-L Actual $1,611,006 1 MICROSURFACING
0903-28-036 Montague/
Wichita Falls
CS Actual $727,881 6 REPLACE BRIDGE AND APPROACHES
0177-05-104 Montgomery/
Houston
US 59 Actual $844,789 2 CONSTRUCT DETENTION FACILITY WITH CHANNEL IMPROVEMENTS
0912-37-166 Montgomery/
Houston
CR Actual $2,742,837 6 REPLACE BRIDGE AND APPROACHES
0912-37-181 Montgomery/
Houston
VA Actual $937,795 1 BASE REPAIR, CRACK SEAL AND PAVEMENT MARKINGS
1417-01-027 Montgomery/
Houston
FM 1484 Actual $1,946,739 1 BASE REPAIR, ONE COARSE SURFACE TREATMENT AND ASPHLT OVERLAY
0006-03-130 Nolan/
Abilene
IH 20 Actual $197,891 1 SIGNAL UPGRADE
0916-00-059 Nueces/
Corpus Christi
VA Actual $561,563 1 TRAFFIC MANAGMENT
0710-02-053 Orange/
Beaumont
FM 105 Actual $1,436,990 11 OVERLAY EXISTING ROADWAY
0246-02-043 Panola/
Atlanta
US 79 Actual $972,548 6 REHABILITATE BRIDGE AND APPROACHES
0008-02-068 Parker/
Fort Worth
US 180 Actual $80,000 1 INSTALLATION OF A FULL TRAFFIC - ACTUATED TRAFFIC SIGNAL
0314-01-075 Parker/
Fort Worth
IH 20 Actual $89,000 1 ABATEMENT OF ASBESTOS IN THE PAINT FOR REHABILITATION
0904-11-037 Randall/
Amarillo
VA Actual $973,140 11 REHABILITATE EXISTING ROADWAY
0118-12-013 San Augustine/
Lufkin
FM 353 Actual $720,362 8 SAFETY TREAT FIXED OBJECTS AND REMOVE TREES
0492-04-030 Smith/
Tyler
FM 756 Actual $1,163,006 1 RESTORE PAVEMENT & RESURFACE ROADWAY
0910-16-095 Smith/
Tyler
VA Actual $3,077,328 9 SEGMENT 1 - TYLER HIKE & BIKE TRAIL TRANSPORTATION ENHANCEMENT
0902-48-627 Tarrant/
Fort Worth
VA Actual $1,447,784 1 GUIDE SIGN REPLACEMENT, REMOVAL AND INSTALLATION ON SH 121
0982-03-011 Throckmorton/
Wichita Falls
SH 222 Actual $788,040 6 REPLACE BRIDGE AND APPROACHES
0919-30-042 Titus/
Atlanta
CR Actual $158,005 6 REPLACE BRIDGE AND APPROACHES
0907-00-075 Tom Green/
San Angelo
VA Actual $94,491 1 SHOULDER TEXTURING
0265-01-103 Travis/
Austin
SH 71 Actual $2,329,660 1 PAVEMENT REPAIR, 1 COURSE SURFACE TREATMENT & 2" OVERLAY
0683-02-052 Travis/
Austin
RM 620 Actual $2,666,774 1 FULL DEPTH REPAIR, UNDERSEAL & OVERLAY
0914-04-064 Travis/
Austin
CR Actual $2,344,310 6 REPLACE BRIDGE & APPROACHES
0914-04-232 Travis/
Austin
CR Actual $1,225,109 8 RESURFACING
3136-01-159 Travis/
Austin
LP 1 Actual $3,997,805 1 PAVEMENT REPAIR, 2" MILL, 1 COURSE SURFACE TREATMENT & 2" OV
1828-02-012 Tyler/
Beaumont
FM 1943 Actual $1,194,855 6 REPLACE BRIDGE AND APPROACHES
0022-06-046 Val Verde/
Laredo
US 90 Actual $4,259,434 6 FOR THE CONSTRUCTION OF THE REHABILITATION OF A
2323-01-017 Wichita/
Wichita Falls
FM 2384 Actual $170,000 8 2007 FEDERAL SIGNAL PROGRAM
0043-05-100 Wilbarger/
Wichita Falls
US 287 Actual $8,679,974 11 12 INCH CONCRETE PAVEMENT
0903-30-026 Wilbarger/
Wichita Falls
CR Actual $985,312 6 REPLACE BRIDGE AND APPROACHES
0015-09-155 Williamson/
Austin
IH 35 Actual $7,890,589 6 FRT RD IMPROVEMENTS & TURNAROUND


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract