Letting Schedule for June, 2008 (FY 2008)

 
 
Last Update: Monday, February 2, 2009
June, 2008 (FY 2008) (see Links)
SEP 2007 | OCT 2007 | NOV 2007 | DEC 2007 | JAN 2008 | FEB 2008 | MAR 2008 | APR 2008 | MAY 2008 | JUN 2008 | JUL 2008 | AUG 2008
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
0911-00-063 Angelina/
Lufkin
VA Actual $116,376 11 INSTALLING RAISED PAVEMENT MARKERS
1165-01-022 Angelina/
Lufkin
FM 842 Actual $646,999 8 SAFETY TREAT FIXED OBJECTS
0133-04-039 Baylor/
Wichita Falls
US 82 Actual $565,205 1 HOT MIX OVERLAY
0232-04-013 Bell/
Waco
FM 2305 Actual $14,668,158 11 CONSTRUCT GRADE SEPARATED INTERCHANGE
0909-36-116 Bell/
Waco
VA Actual $845,000 10 CONSTRUCT / RECONSTRUCT ADA RAMPS
0521-04-267 Bexar/
San Antonio
IH 410 Actual $2,042,610 6 WIDEN NARROW BRIDGE & APPROACHES
0915-12-367 Bexar/
San Antonio
CS Actual $4,185,471 7 RECONSTRUCT & WIDEN NARROW PAVEMENT W / CLTL (CURB, SDWK, AND
0915-12-369 Bexar/
San Antonio
CS Actual $2,494,279 7 EXTEND ROADWAY ON NEW ALIGNMENT WITH CURBS, SDWLKS & DRAINAGE
0915-12-445 Bexar/
San Antonio
CS Actual $212,889 8 OVERLAY AND PAVEMENT MARKINGS
0915-12-449 Bexar/
San Antonio
VA Actual $1,000,000 7 PRELIMINARY ENGINEERING FOR BUS RAPID TRANSIT
0010-12-064 Bowie/
Atlanta
US 67 Actual $989,668 8 SAFETY TREAT FIXED OBJECTS, ETC.
1004-01-049 Brazoria/
Houston
FM 524 Actual $70,099 1 PE FOR HYDRAULIC STUDY
0117-02-032 Brazos/
Bryan
SH 21 Actual $528,301 4 MISCELLANEOUS CONSTRUCTION CONSISTING OF THE PREPARATION OF
0540-04-044 Brazos/
Bryan
FM 2154 Actual $13,948,854 11 WIDEN NON - FREEWAY FACILITY CONSISTING OF GRADING, STRUCTURES
0923-08-016 Coleman/
Brownwood
CR Actual $843,363 6 REPLACE BRIDGE AND APPROACHES
0047-06-132 Collin/
Dallas
US 75 Actual $1,559,000 7 REVERSE SB EXIT AND ENTERANCE RAMPS
0918-24-118 Collin/
Dallas
VA Actual $654,981 5 INTERSECTION IMPROVEMENTS
0915-17-050 Comal/
San Antonio
CS Actual $64,040 8 PLACE PAVEMENT MARKINGS AND SIGNING TO PROVIDE CONTINUOUS
0044-08-061 Cooke/
Wichita Falls
US 82 Actual $64,520 10 LANDSCAPING
0196-07-018 Dallas/
Dallas
SP 366 Actual $47,458,274 10 EXTENSION OVER TRINITY AS 6 LANES WITH RAMPS TO INDUSTRIAL &
0918-00-127 Dallas/
Dallas
VA Actual $1,145,000 1 NON SITE SPECIFIC TRAFFIC SIGNAL INSTALLATION
0918-00-139 Dallas/
Dallas
VA Actual $328,000 1 INSTALL UNINTERRUPTED POWER SUPPLY AT VARIOUS SIGNALIZED
0918-45-803 Dallas/
Dallas
CS Actual $176,872 8 INSTALL TRAFFIC SIGNAL AND ADD LEFT TURN LANES
0081-13-046 Denton/
Dallas
IH 35W Actual $1,734,110 5 INSTALLATION OF INCIDENT DETECTION AND RESPONSE SYSTEM
0135-10-048 Denton/
Dallas
US 377 Actual $1,624,317 1 FULL DEPTH CONCRETE REPAIR
0918-46-211 Denton/
Dallas
CR Actual $493,379 6 REPLACE BRIDGE AND APPROACHES
0923-09-045 Eastland/
Brownwood
CR Actual $1,048,440 6 REPLACE BRIDGE AND APPROACHES
0924-06-181 El Paso/
El Paso
CS Actual $1,799,362 1 RECONSTRUCT ASHFORD / RYDERWOOD
2121-04-081 El Paso/
El Paso
IH 10 Actual $1,050,631 11 RELOCATION OF THE EXISTING WEST BOUND ON - RAMP
0902-49-064 Erath/
Fort Worth
CS Actual $400,000 8 2008 RAILROAD CROSSING SIGNAL PROGRAM
0909-38-021 Falls/
Waco
CR Actual $1,636,050 6 REPLACE BRIDGE AND APPROACHES
0729-05-008 Fannin/
Paris
FM 815 Actual $800,000 8 INSTALL RAILROAD LIGHTS AND GATES
0912-34-124 Fort Bend/
Houston
VA Actual $1,848,532 11 INSTALL PIPE LINER
0920-03-067 Hardin/
Beaumont
CR Actual $341,315 6 REPLACE BRIDGE AND APPROACHES
0500-03-557 Harris/
Houston
IH 45 Actual $308,204 11 REPLACE PAVEMENT MARKINGS WITH MULTIPOLYMER AND INSTALL
0508-01-327 Harris/
Houston
IH 10 Actual $269,902 11 REPLACE PAVEMENT MARKINGS WITH MULTI POLYMER AND INSTALL
0912-00-309 Harris/
Houston
VA Actual $45,968 1 HORIZONTAL / ANGLE CORE DRILLING
0912-00-356 Harris/
Houston
VA Actual $1,875,000 7 VISION PLANNING STUDY
1290-05-015 Hunt/
Paris
SH 276 Actual $47,395 1 INSTALL FLASHING BEACON
0739-02-135 Jefferson/
Beaumont
IH 10 Actual $243,569 10 RELOCATE EXISTING OFF - RAMP
0173-03-033 Kaufman/
Dallas
SH 34 Actual $3,155,257 1 REHABILITATE EXISTING ROADWAY
1135-02-021 Kerr/
San Antonio
RM 783 Actual $1,489,145 6 REPLACE NARROW BRIDGE & APPROACHES
2294-01-014 Lee/
Austin
FM 2440 Actual $3,517,282 1 PAVEMENT REPAIR AND OVERLAY
1742-01-023 Nueces/
Corpus Christi
FM 1694 Actual $6,096,068 1 WIDEN AND ADD 3FT SHLDRS AND SEAL LANES
1334-01-015 Palo Pinto/
Fort Worth
FM 1195 Actual $2,631,223 1 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
2735-01-012 Palo Pinto/
Fort Worth
FM 2256 Actual $3,072,267 1 SAFETY TREAT FIXED OBJECTS; WIDEN LANES & CONSTRUCT PAVED
0049-06-073 Robertson/
Bryan
SH 6 Actual $710,014 4 MISCELLANEOUS CONSTRUCTION CONSISTING OF THE PREPARATION OF
0177-02-082 San Jacinto/
Lufkin
US 59 Actual $60,614 10 LANDSCAPE IMPROVEMENTS
0902-48-661 Tarrant/
Fort Worth
VA Actual $153,987 5 LAND USE / JOINT VENTURE WITH NORTH RICHLAND HILLS PHASE I
2079-01-038 Tarrant/
Fort Worth
FM 1220 Actual $2,765,797 1 PAVEMENT REPAIR, EDGE MILL AND 2" OVERLAY WITH INSTALLATION
0908-33-082 Taylor/
Abilene
CR Actual $8,800,000 8 UPGRADE RAILROAD SIGNALS
0125-02-029 Throckmorton/
Wichita Falls
US 183 Actual $637,284 10 LANDSCAPING
0125-03-036 Throckmorton/
Wichita Falls
US 183 Actual $2,585,895 1 OVERLAY AND ADD SET'S
0152-01-070 Travis/
Austin
US 183 Actual $508,543 6 REHABILITATE BRIDGE AND APPROACHES
0914-00-226 Travis/
Austin
VA Actual $60,000 7 DEVELOP PROJECT SPECIFIC RECOMMENDATIONS AND SOLUTIONS
0914-04-254 Travis/
Austin
CS Actual $200,000 8 RAILROAD GRADE CROSSING SIGNAL
0675-07-065 Walker/
Bryan
IH 45 Actual $10,102,410 1 UPGRADING OF FREEWAY FACILITY CONSISTING OF GRADING,
2262-01-013 Ward/
Odessa
FM 1776 Actual $2,086,558 6 BRIDGE REPLACEMENT
0913-09-036 Wharton/
Yoakum
CR Actual $631,981 6 REPLACE BRIDGE AND APPROACHES
0903-03-086 Wichita/
Wichita Falls
CS Actual $656,000 8 INSTALL TRAFFIC SIGNAL
0015-08-129 Williamson/
Austin
IH 35 Actual $5,261,829 1 SPOT FULL DEPTH REPAIR, MILL & OV
0204-04-042 Williamson/
Austin
US 79 Actual $16,986,053 10 UPGRADE TO 4 - LN DIVIDED
0903-27-022 Young/
Wichita Falls
CR Actual $493,468 6 REPLACE BRIDGE AND APPROACHES


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract