Letting Schedule for July, 2012 (FY 2012)

 
 
Last Update: Monday, September 24, 2012
July, 2012 (FY 2012) (see Links)
SEP 2011 | OCT 2011 | NOV 2011 | DEC 2011 | JAN 2012 | FEB 2012 | MAR 2012 | APR 2012 | MAY 2012 | JUN 2012 | JUL 2012 | AUG 2012
CCSJ County/
District
Highway Let Status Contract
Cost
Fund
Cat
Description
1234-02-011 Bastrop/
Austin
FM 1100 Actual $657,301 8 CONST. SIDEWALKS & CROSSWALKS ON - SYSTEM
0814-01-027 Baylor/
Wichita Falls
FM 422 Actual $3,332,047 3 REALIGNMENT OF ROADWAY
2452-02-082 Bexar/
San Antonio
LP 1604 Actual $3,175,995 3 CONSTRUCT BRIDGE BETWEEN FRONTAGE RDS
0909-28-034 Bosque/
Waco
CS Actual $416,885 8 CONSTRUCT ALTERNATE TRANSPORTATION ROUTE CONSISTING OF
0085-04-034 Bowie/
Atlanta
US 259 Actual $3,744,662 3 WIDEN TO ADD SHOULDERS AND RESURFACE 2 - LANE RURAL HIGHWAY
0912-31-203 Brazoria/
Houston
CS Actual $2,748,072 6 REPLACE BRIDGE AND APPROACHES (NBI# 12020D00561001)
0039-07-238 Cameron/
Pharr
US 77 Actual $1,535,078 1 OVERLAY_ (S.B. MAIN LANES)
0331-04-065 Cameron/
Pharr
PR 100 Actual $2,627,872 6 BRIDGE REPAIR
0921-06-253 Cameron/
Pharr
VA Actual $1,627,997 10 CONSTRUCT CURB RAMPS
0218-04-110 Cass/
Atlanta
US 59 Actual $404,794 3 CONSTRUCT OFFSET LEFT TURN LANES
0923-08-026 Coleman/
Brownwood
CR Actual $364,959 6 REPLACE BRIDGE AND APPROACHES
0047-06-148 Collin/
Dallas
US 75 Actual $149,916 1 ITS INTERAGENCY CONNECTION
0047-09-027 Collin/
Dallas
SH 5 Actual $3,522,660 1 REALIGN HIGHWAY AND REMOVE UNDERPASS
0918-24-125 Collin/
Dallas
CS Actual $649,934 6 REPLACE BRIDGE AND APPROACHES
0146-02-031 Cottle/
Childress
US 62 Actual $9,471,259 3 MILL & HOTMIX OVERLAY
0134-09-063 Denton/
Dallas
US 380 Actual $39,346,680 1 WIDEN TWO LANE RURAL HIGHWAY TO SIX LANE DIVIDED URBAN
0270-02-039 Dewitt/
Yoakum
SH 72 Actual $2,526,306 1 ACP OVERLAY
0359-03-024 Dewitt/
Yoakum
SH 119 Actual $1,522,783 1 ASPHALTIC CONCRETE PAVEMENT
0924-00-085 El Paso/
El Paso
VA Actual $932,968 1 METAL BEAM GUARD FENCE AND SGT UPGRADES
0924-06-426 El Paso/
El Paso
VA Actual $539,331 10 PLACEMENT OF NEW VEGETATION, SOIL MIX, IRRIGATION SYSTEM AND
0269-01-027 Fayette/
Yoakum
US 77 Actual $6,078,392 3 CONSTRUCT AUXILLARY LANES
0527-08-010 Fort Bend/
Houston
FM 1952 Actual $324,241 1 BASE REPAIR & OVERLAY
2105-01-045 Fort Bend/
Houston
FM 2234 Actual $830,894 3 ACCESS MANAGEMENT (MEDIANS) IN MISSOURI CITY
0500-01-140 Galveston/
Houston
IH 45 Actual $626,034 1 ASPHALT CONCRETE PAVEMENT OVERLAY
0913-22-039 Gonzales/
Yoakum
CR Actual $249,943 6 REPLACE BRIDGE AND APPROACHES
0045-03-045 Grayson/
Paris
SH 56 Actual $610,186 3 SIDEWALK RECONSTRUCTION WITH LANDSCAPE PLANTING
0067-05-042 Hale/
Lubbock
IH 27 Actual $19,949,214 1 INTERCHANGE RECONSTRUCTION
0200-10-069 Hardin/
Beaumont
US 69 Actual $120,176 11 INSTALLATION OF A TURN LANE AT INTERSECTION
0050-06-083 Harris/
Houston
US 290 Actual $2,824,350 3 INTERSECTION IMPROVEMENTS
0502-01-206 Harris/
Houston
SH 225 Actual $1,874,035 1 HIGH MAST ILLUMINATION
0912-72-174 Harris/
Houston
VA Actual $6,900,000 3 TRANSTAR EMERGENCY OPERATIONS CENTER EXPANSION
2941-01-022 Harris/
Houston
FM 2920 Actual $3,658,494 3 INTERSECTION IMPROVEMENTS
3510-05-017 Harris/
Houston
SH 99 Actual $31,203,250 3 CONSTRUCT 4 DIRECT CONNECTORS (SEGMENT E) (TOLL)
0096-07-042 Harrison/
Atlanta
US 80 Actual $375,287 3 CONSTRUCT TURN LANES
0039-04-095 Hidalgo/
Pharr
BU 83-S Actual $14,872,328 7 CONSTRUCT 4 LANE DIVIDED URBAN
0862-02-018 Hidalgo/
Pharr
FM 1427 Actual $3,777,778 1 REHABILITATE PAVEMENT & WIDEN TO 40'
0002-07-043 Hudspeth/
El Paso
IH 10 Actual $5,619,565 6 REPLACE DAMAGED BRIDGES, RAILS, METAL BEAM GUARD FENCE, AND
0641-01-033 Hunt/
Paris
SH 276 Actual $47,845,879 3 REPLACE BRIDGE AND APPROACHES
0920-38-153 Jefferson/
Beaumont
CS Actual $11,284,747 3 RECONSTRUCT FROM 2 LANES TO 4 LANES
0254-07-003 Jim Wells/
Corpus Christi
US 281 Actual $16,496,832 8 CONSTRUCT OVERPASS
0072-14-024 Kendall/
San Antonio
US 87 Actual $943,106 3 WIDEN NARROW BRIDGE AND APPROACHES
0915-15-085 Kerr/
San Antonio
CR Actual $364,308 6 REPLACE BRIDGE AND APPROACHES
0370-01-033 Lavaca/
Yoakum
US 77 Actual $9,709,623 3 CONSTRUCT AUXILLARY LANES
1337-01-022 Lipscomb/
Amarillo
SH 23 Actual $5,502,012 3 REHAB & WIDEN EXISTING RDWY
0783-02-084 Lubbock/
Lubbock
LP 289 Actual $26,923,573 3 WIDEN FREEWAY
0912-37-185 Montgomery/
Houston
CS Actual $2,237,466 6 REPLACE BRIDGE (NBI# 12170C00212001)
0118-08-060 Nacogdoches/
Lufkin
SH 21 Actual $7,883,682 3 REHABILITATE EXISTING ROADWAY AND ADD PAVED SHOULDERS
0998-03-024 Navarro/
Dallas
FM 416 Actual $2,482,686 8 PROVIDE ADDITIONAL PAVED SURFACE WIDTH
0102-02-095 Nueces/
Corpus Christi
US 77 Actual $11,246,984 3 CONSTRUCT MAIN LANES
0904-11-049 Randall/
Amarillo
PW Actual $394,527 10 CONSTRUCT NEW CAMP LOOP AND TWO PARKING LOTS AT THE JUNIPER
0159-04-034 Schleicher/
San Angelo
US 277 Actual $6,869,671 3 ADD SUPER 2 PASSING LANES
3315-01-016 Shelby/
Lufkin
LP 500 Actual $11,879,175 1 CONSTRUCTION OF NEW LOCATION 2 - LANE FACILITY
0008-04-047 Tarrant/
Fort Worth
SP 580 Actual $335,495 1 LANDSCAPING
0080-07-085 Tarrant/
Fort Worth
US 377 Actual $15,619,993 3 WIDEN 5 LANE DITCH SECTION TO 6 LANE DIVIDED WITH CURB AND
0159-01-039 Tom Green/
San Angelo
US 277 Actual $2,734,302 3 ADD SUPER 2 PASSING LANES
0159-02-072 Tom Green/
San Angelo
US 277 Actual $6,239,473 3 ADD SUPER 2 PASSING LANES
0113-13-146 Travis/
Austin
LP 360 Actual $125,000 3 INSTALL INTELLIGENT TRANSPORTATION SYSTEM
0914-04-267 Travis/
Austin
VA Actual $566,208 3 CONST TRAIL EXTENSION & CONNECTIVITY
0913-09-045 Wharton/
Yoakum
CR Actual $410,213 6 REPLACE BRIDGE AND APPROACHES
0143-03-042 Wilson/
San Antonio
US 87 Actual $5,259,623 3 WIDEN ROADWAY TO PROVIDE PASSING LANE


Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract