Detail Letting Schedule for Bexar County (FY 2012)
Detail Letting Schedule for Bexar County (FY 2012) | ||||
Last Update: Monday, September 24, 2012 |
Bexar County (FY 2012) |
CCSJ: 0017-10-257 | |||
District: | San Antonio | Let Date: | DEC 2011 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CRX 17-10-257 | CSJ: | 0017-10-257 |
Description: | RAILROAD GRADE CROSSING REPLANKING | Handling Code: |
XX |
Limits From: | ON IH 35 SBFR NORTH OF TAMPICO | Fund Cat: | 10 |
Limits To: | AT UPRR DOT# 764991 | Estimate: | $30,080 |
Length: | 0.1 Miles | Actual: | $30,080 |
Back... |
Totals for 0017-10-257 | ||
---|---|---|---|
Length: | 0.1 Miles | ||
Estimate: | $30,080 | ||
Actual: | $30,080 | ||
CCSJ: 0017-10-258 | |||
District: | San Antonio | Let Date: | DEC 2011 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | CRX 17-10-258 | CSJ: | 0017-10-258 |
Description: | RAILROAD GRADE CROSSING REPLANKING | Handling Code: |
XX |
Limits From: | ON IH 35 NBFR NORTH OF W CAVALLOS | Fund Cat: | 10 |
Limits To: | AT UPRR DOT# 764341 D | Estimate: | $30,080 |
Length: | 0.1 Miles | Actual: | $30,080 |
Back... |
Totals for 0017-10-258 | ||
Length: | 0.1 Miles | ||
Estimate: | $30,080 | ||
Actual: | $30,080 | ||
CCSJ: 0017-10-265 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0017-10-265 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | IH 35 WESTBOUND FRONTAGE ROAD | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.1 Miles | Actual: | $212,667 |
Back... |
Totals for 0017-10-265 | ||
Length: | 0.1 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0017-10-266 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | IH 35 | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0017-10-266 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | IH 35 EASTBOUND FRONTAGE ROAD | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 1.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0017-10-266 | ||
Length: | 1.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0017-11-038 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | SP 536 | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0017-11-038 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | SPUR 536 (PROBANDT) | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 1.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0017-11-038 | ||
Length: | 1.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0025-02-190 | |||
District: | San Antonio | Let Date: | DEC 2011 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(376) | CSJ: | 0025-02-190 |
Description: | BASE REPAIR, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS - | Handling Code: |
|
Limits From: | FOSTER ROAD | Fund Cat: | 1 |
Limits To: | LOOP 1604 | Estimate: | $3,491,831 |
Length: | 4.3 Miles | Actual: | $2,561,314 |
Back... |
Totals for 0025-02-190 | ||
Length: | 4.3 Miles | ||
Estimate: | $3,491,831 | ||
Actual: | $2,561,314 | ||
CCSJ: 0072-08-132 | |||
District: | San Antonio | Let Date: | SEP 2011 |
Highway: | LP 345 | Let Status: | Actual |
Project ID: | NH 2012(034) | CSJ: | 0072-08-132 |
Description: | MILL, BASE REPAIR, SEAL COAT, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | IH 410 | Fund Cat: | 1 |
Limits To: | PASADENA | Estimate: | $1,927,827 |
Length: | 2.3 Miles | Actual: | $1,716,677 |
District: | San Antonio | Let Date: | SEP 2011 |
Highway: | LP 345 | Let Status: | Actual |
Project ID: | RW 72-8-135 | CSJ: | 0072-08-135 |
Description: | UTILITY ADJUSTMENTS | Handling Code: |
|
Limits From: | IH 410 | Fund Cat: | ROW |
Limits To: | PASADENA | Estimate: | |
Length: | 2.3 Miles | Actual: | $25,620 |
District: | San Antonio | Let Date: | SEP 2011 |
Highway: | LP 345 | Let Status: | Actual |
Project ID: | NH 2012(034) | CSJ: | 0072-09-012 |
Description: | MILL, BASE REPAIR, SEAL COAT, OVERLAY, & PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | PASADENA | Fund Cat: | 1 |
Limits To: | IH 10 | Estimate: | $612,061 |
Length: | 1.3 Miles | Actual: | $550,484 |
Back... |
Totals for 0072-08-132 | ||
Length: | 5.9 Miles | ||
Estimate: | $2,539,888 | ||
Actual: | $2,292,781 | ||
CCSJ: 0072-08-133 | |||
District: | San Antonio | Let Date: | FEB 2012 |
Highway: | IH 10 | Let Status: | Actual |
Project ID: | IM 0104(378) | CSJ: | 0072-08-133 |
Description: | MILL, OVERLAY AND PAVEMENT MARKINGS | Handling Code: |
|
Limits From: | DOMINION DRIVE | Fund Cat: | 1 |
Limits To: | LOOP 1604 | Estimate: | $2,595,277 |
Length: | 2.2 Miles | Actual: | $1,974,468 |
Back... |
Totals for 0072-08-133 | ||
Length: | 2.2 Miles | ||
Estimate: | $2,595,277 | ||
Actual: | $1,974,468 | ||
CCSJ: 0073-08-164 | |||
District: | San Antonio | Let Date: | APR 2012 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 0372(086) | CSJ: | 0073-08-164 |
Description: | MILL, BASE REPAIR, SEAL COAT, OVERLAY, SIGNS & PAVEMENT | Handling Code: |
|
Limits From: | 0.5 MI N OF SOUTHTON RD | Fund Cat: | 1 |
Limits To: | 0.1 MI N OF US 181 | Estimate: | $980,940 |
Length: | 1.4 Miles | Actual: | $888,348 |
District: | San Antonio | Let Date: | APR 2012 |
Highway: | IH 37 | Let Status: | Actual |
Project ID: | IM 0372(086) | CSJ: | 0073-09-032 |
Description: | MILL, BASE REPAIR, SEAL COAT, OVERLAY, SIGNS & PAVEMENT | Handling Code: |
|
Limits From: | BEXAR COUNTY LINE | Fund Cat: | 1 |
Limits To: | 0.5 MI N OF SOUTHTON RD | Estimate: | $3,764,491 |
Length: | 11.9 Miles | Actual: | $2,985,092 |
Back... |
Totals for 0073-08-164 | ||
Length: | 13.3 Miles | ||
Estimate: | $4,745,431 | ||
Actual: | $3,873,440 | ||
CCSJ: 0073-08-168 | |||
District: | San Antonio | Let Date: | FEB 2012 |
Highway: | US 281 | Let Status: | Actual |
Project ID: | NH 2012(288) | CSJ: | 0073-08-168 |
Description: | LANDSCAPE DEVELOPMENT | Handling Code: |
|
Limits From: | 0.25 MILES N OF IH 410 | Fund Cat: | 10 |
Limits To: | 0.3 MI S OF JONES MALTSBERGER RD | Estimate: | $699,893 |
Length: | 1.1 Miles | Actual: | $662,704 |
Back... |
Totals for 0073-08-168 | ||
Length: | 1.1 Miles | ||
Estimate: | $699,893 | ||
Actual: | $662,704 | ||
CCSJ: 0465-01-057 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | SH 218 | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0465-01-057 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | SH 218 (PAT BOOKER RD) | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.1 Miles | Actual: | $212,667 |
Back... |
Totals for 0465-01-057 | ||
Length: | 0.1 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0521-04-273 | |||
District: | San Antonio | Let Date: | DEC 2011 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | IM 4104(377) | CSJ: | 0521-04-273 |
Description: | ULTRA THIN BONDED WEARING COURSE & PVMT MRK | Handling Code: |
|
Limits From: | IH 10 | Fund Cat: | 1 |
Limits To: | BLANCO | Estimate: | $1,947,481 |
Length: | 2.6 Miles | Actual: | $1,815,375 |
Back... |
Totals for 0521-04-273 | ||
Length: | 2.6 Miles | ||
Estimate: | $1,947,481 | ||
Actual: | $1,815,375 | ||
CCSJ: 0521-05-122 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | IH 410 | Let Status: | Actual |
Project ID: | BOR 2003(33) | CSJ: | 0521-05-122 |
Description: | RELOCATING ENTRANCE & EXIT RAMPS BETWEEN RR OVERPASSES | Handling Code: |
|
Limits From: | UPRR, 1.0 MI N OF IH 35 | Fund Cat: | 3 |
Limits To: | FM 2536 | Estimate: | $1,466,692 |
Length: | 0.8 Miles | Actual: | $1,468,825 |
Award Status Bid Tabulations Back... |
Totals for 0521-05-122 | ||
Length: | 0.8 Miles | ||
Estimate: | $1,466,692 | ||
Actual: | $1,468,825 | ||
CCSJ: 0915-00-157 | |||
District: | San Antonio | Let Date: | DEC 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(161) | CSJ: | 0915-00-157 |
Description: | DISTRICTWIDE GUIDESIGNS FY12 | Handling Code: |
|
Limits From: | DISTRICTWIDE GUIDESIGNS FY12 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $2,408,140 |
Length: | 0.0 Miles | Actual: | $1,666,183 |
Back... |
Totals for 0915-00-157 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,408,140 | ||
Actual: | $1,666,183 | ||
CCSJ: 0915-00-158 | |||
District: | San Antonio | Let Date: | FEB 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(311) | CSJ: | 0915-00-158 |
Description: | DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2012 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,169,568 |
Length: | 0.0 Miles | Actual: | $1,113,075 |
Back... |
Totals for 0915-00-158 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,169,568 | ||
Actual: | $1,113,075 | ||
CCSJ: 0915-00-163 | |||
District: | San Antonio | Let Date: | FEB 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(312) | CSJ: | 0915-00-163 |
Description: | DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS | Handling Code: |
|
Limits From: | DISTRICTWIDE TRAFFIC CNTRL FY 2012 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,004,553 |
Length: | 0.0 Miles | Actual: | $942,876 |
Back... |
Totals for 0915-00-163 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,004,553 | ||
Actual: | $942,876 | ||
CCSJ: 0915-12-438 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | HP 1102(121) | CSJ: | 0915-12-438 |
Description: | PHASE 4 & 5 ENHANCE RDWYS, TRAILS, MRKRS THAT LEAD TO MISSIONS | Handling Code: |
LC |
Limits From: | IN SA, MITCHELL ST TO S. ALAMO | Fund Cat: | 3 |
Limits To: | MISSION TRAILS 'ESPADA' TO 'ALAMO' | Estimate: | $6,855,000 |
Length: | 0.0 Miles | Actual: | $4,074,498 |
Back... |
Totals for 0915-12-438 | ||
Length: | 0.0 Miles | ||
Estimate: | $6,855,000 | ||
Actual: | $4,074,498 | ||
CCSJ: 0915-12-470 | |||
District: | San Antonio | Let Date: | JAN 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1102(119)MM | CSJ: | 0915-12-470 |
Description: | WIDEN ROADWAY TO CONSTRUCT TURN LANES AND UPGRADE SIGNAL | Handling Code: |
LC |
Limits From: | IN SAN ANTONIO ON HARRY WURZBACH RD | Fund Cat: | 3 |
Limits To: | AT WINANS ROAD | Estimate: | $1,300,000 |
Length: | 0.1 Miles | Actual: | $2,433,384 |
District: | San Antonio | Let Date: | JAN 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1102(119)MM | CSJ: | 0915-12-471 |
Description: | WIDEN ROADWAY TO CONSTRUCT TURN LANES AND UPGRADE SIGNAL | Handling Code: |
LC |
Limits From: | IN SAN ANTONIO ON HARRY WURZBACH RD | Fund Cat: | 3 |
Limits To: | AT BURR ROAD | Estimate: | $1,100,000 |
Length: | 0.1 Miles | Actual: | $1,010,314 |
District: | San Antonio | Let Date: | JAN 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | PLD 1102(120) | CSJ: | 0915-12-480 |
Description: | WIDEN ROADWAY TO EXTEND LEFT TURN LANES AND UPDATE SIGNAL | Handling Code: |
LC |
Limits From: | IN SAN ANTONIO ON HARRY WURZBACH RD | Fund Cat: | 3 |
Limits To: | AT RITTIMAN ROAD | Estimate: | $6,327,859 |
Length: | 0.1 Miles | Actual: | $3,927,588 |
Back... |
Totals for 0915-12-470 | ||
Length: | 0.3 Miles | ||
Estimate: | $8,727,859 | ||
Actual: | $7,371,286 | ||
CCSJ: 0915-12-485 | |||
District: | San Antonio | Let Date: | SEP 2011 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 1102(268)MM | CSJ: | 0915-12-485 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2011 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $267,000 |
Length: | 0.0 Miles | Actual: | $267,000 |
Back... |
Totals for 0915-12-485 | ||
Length: | 0.0 Miles | ||
Estimate: | $267,000 | ||
Actual: | $267,000 | ||
CCSJ: 0915-12-486 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1102(191)SRS | CSJ: | 0915-12-486 |
Description: | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, IMPROVE PED BRIDGE | Handling Code: |
LC |
Limits From: | GLASS ELEMENTARY SCHOOL | Fund Cat: | 8 |
Limits To: | . | Estimate: | $407,271 |
Length: | 0.0 Miles | Actual: | $297,339 |
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 1102(192)SRS | CSJ: | 0915-12-487 |
Description: | CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, IMPROVE PED BRIDGE | Handling Code: |
LC |
Limits From: | NEFF MIDDLE SCHOOL | Fund Cat: | 3 |
Limits To: | . | Estimate: | $499,898 |
Length: | 0.0 Miles | Actual: | $842,105 |
Back... |
Totals for 0915-12-486 | ||
Length: | 0.0 Miles | ||
Estimate: | $907,169 | ||
Actual: | $1,139,444 | ||
CCSJ: 0915-12-490 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(758)MM | CSJ: | 0915-12-490 |
Description: | COSTS ASSOCIATED WITH BUS PURCHASES, ROW, CONSTRUCTION, | Handling Code: |
TR |
Limits From: | MEDICAL CENTER | Fund Cat: | 7 |
Limits To: | DOWNTOWN- VIA FREDRICKSBURG RD | Estimate: | $4,300,000 |
Length: | 0.0 Miles | Actual: | $4,300,000 |
Back... |
Totals for 0915-12-490 | ||
Length: | 0.0 Miles | ||
Estimate: | $4,300,000 | ||
Actual: | $4,300,000 | ||
CCSJ: 0915-12-491 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(801)MM | CSJ: | 0915-12-491 |
Description: | ALAMO AREA COMMUTE SOLUTION PGM - FY 2012 | Handling Code: |
XX |
Limits From: | IN SAN ANTONIO/BEXAR CO AREA | Fund Cat: | 7 |
Limits To: | . | Estimate: | $267,000 |
Length: | 0.0 Miles | Actual: | $267,000 |
Back... |
Totals for 0915-12-491 | ||
Length: | 0.0 Miles | ||
Estimate: | $267,000 | ||
Actual: | $267,000 | ||
CCSJ: 0915-12-494 | |||
District: | San Antonio | Let Date: | MAY 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(531) | CSJ: | 0915-12-494 |
Description: | CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE | Handling Code: |
|
Limits From: | IH 35 AND VARIOUS LOCATIONS_IN | Fund Cat: | 10 |
Limits To: | BEXAR COUNTY | Estimate: | $2,889,842 |
Length: | 0.0 Miles | Actual: | $2,893,180 |
Back... |
Totals for 0915-12-494 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,889,842 | ||
Actual: | $2,893,180 | ||
CCSJ: 0915-12-495 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2013(198)MM | CSJ: | 0915-12-495 |
Description: | FURNISH & INSTALL EQUIPMENT TO EXPAND TRAFFIC SIGNAL | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN SAN ANTONIO | Fund Cat: | 3 |
Limits To: | . | Estimate: | $1,500,000 |
Length: | 0.0 Miles | Actual: | $1,500,000 |
Back... |
Totals for 0915-12-495 | ||
Length: | 0.0 Miles | ||
Estimate: | $1,500,000 | ||
Actual: | $1,500,000 | ||
CCSJ: 0915-12-497 | |||
District: | San Antonio | Let Date: | JAN 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(406) | CSJ: | 0915-12-497 |
Description: | PURCHASE AND INSTALL WRONG WAY SIGNS AND DETECTION EQUIPMENT | Handling Code: |
XX |
Limits From: | VARIOUS LOCATIONS IN BEXAR COUNTY | Fund Cat: | 1 |
Limits To: | . | Estimate: | $500,000 |
Length: | 0.0 Miles | Actual: | $500,000 |
Back... |
Totals for 0915-12-497 | ||
Length: | 0.0 Miles | ||
Estimate: | $500,000 | ||
Actual: | $500,000 | ||
CCSJ: 0915-12-498 | |||
District: | San Antonio | Let Date: | APR 2012 |
Highway: | VA | Let Status: | Actual |
Project ID: | STP 2012(585)MM | CSJ: | 0915-12-498 |
Description: | COSTS ASSOCIATED WITH BUS PURCHASES, ROW, CONSTRUCTION, | Handling Code: |
TR |
Limits From: | MEDICAL CENTER | Fund Cat: | 7 |
Limits To: | DOWNTOWN - VIA FREDRICKSBURG RD | Estimate: | $10,100,000 |
Length: | 0.0 Miles | Actual: | $10,100,000 |
Back... |
Totals for 0915-12-498 | ||
Length: | 0.0 Miles | ||
Estimate: | $10,100,000 | ||
Actual: | $10,100,000 | ||
CCSJ: 0915-12-500 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-500 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | GUADALUPE STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-500 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-501 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-501 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | S ZARZAMORA STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-501 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-502 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-502 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | THOUSAND OAKS | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-502 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-503 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-503 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | SOUTH FLORES STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-503 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-504 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-504 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | SOUTH PRESA STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-504 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-505 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-505 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | WALZEM ROAD | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-505 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-506 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-506 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | ZARZAMORA STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-506 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 0915-12-507 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-507 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | HOEFGEN STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $150,000 |
Length: | 0.0 Miles | Actual: | $150,000 |
Back... |
Totals for 0915-12-507 | ||
Length: | 0.0 Miles | ||
Estimate: | $150,000 | ||
Actual: | $150,000 | ||
CCSJ: 0915-12-508 | |||
District: | San Antonio | Let Date: | AUG 2012 |
Highway: | CS | Let Status: | Actual |
Project ID: | STP 2012(401)FRS | CSJ: | 0915-12-508 |
Description: | STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS | Handling Code: |
XX |
Limits From: | S SAN MARCOS STREET | Fund Cat: | 8 |
Limits To: | AT UPRR | Estimate: | $212,667 |
Length: | 0.0 Miles | Actual: | $212,667 |
Back... |
Totals for 0915-12-508 | ||
Length: | 0.0 Miles | ||
Estimate: | $212,667 | ||
Actual: | $212,667 | ||
CCSJ: 1890-02-007 | |||
District: | San Antonio | Let Date: | FEB 2012 |
Highway: | FM 1516 | Let Status: | Actual |
Project ID: | CRX 1890-2-7 | CSJ: | 1890-02-007 |
Description: | RAILROAD GRADE CROSSING REPLANKING | Handling Code: |
XX |
Limits From: | 0.08 MI S OF FM 1976 | Fund Cat: | 10 |
Limits To: | AT UPRR DOT #764356T | Estimate: | $90,240 |
Length: | 0.1 Miles | Actual: | $90,240 |
Back... |
Totals for 1890-02-007 | ||
Length: | 0.1 Miles | ||
Estimate: | $90,240 | ||
Actual: | $90,240 | ||
CCSJ: 2452-01-043 | |||
District: | San Antonio | Let Date: | JAN 2012 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | NH 2007(705) | CSJ: | 2452-01-043 |
Description: | CONSTRUCT INTERCHANGE (PHASE 1A - SH 151 ML'S) | Handling Code: |
|
Limits From: | AT SH 151 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $16,222,283 |
Length: | 0.4 Miles | Actual: | $14,882,513 |
District: | San Antonio | Let Date: | JAN 2012 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | RW 2452-1-48 | CSJ: | 2452-01-048 |
Description: | RIGHT OF WAY UTILITIES ADJUSTMENTS | Handling Code: |
|
Limits From: | AT SH 151 | Fund Cat: | ROW |
Limits To: | . | Estimate: | |
Length: | 0.4 Miles | Actual: | $244,327 |
Back... |
Totals for 2452-01-043 | ||
Length: | 0.8 Miles | ||
Estimate: | $16,222,283 | ||
Actual: | $15,126,840 | ||
CCSJ: 2452-02-081 | |||
District: | San Antonio | Let Date: | SEP 2011 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | NH 2012(038) | CSJ: | 2452-02-081 |
Description: | CONSTRUCT EB TO WB LP 1604 TURNAROUND | Handling Code: |
|
Limits From: | AT IH 10 | Fund Cat: | 1 |
Limits To: | . | Estimate: | $1,715,817 |
Length: | 0.6 Miles | Actual: | $1,684,204 |
Back... |
Totals for 2452-02-081 | ||
Length: | 0.6 Miles | ||
Estimate: | $1,715,817 | ||
Actual: | $1,684,204 | ||
CCSJ: 2452-02-082 | |||
District: | San Antonio | Let Date: | JUL 2012 |
Highway: | LP 1604 | Let Status: | Actual |
Project ID: | C 2452-2-82 | CSJ: | 2452-02-082 |
Description: | CONSTRUCT BRIDGE BETWEEN FRONTAGE RDS | Handling Code: |
|
Limits From: | AT VANCE JACKSON | Fund Cat: | 3 |
Limits To: | . | Estimate: | $2,731,612 |
Length: | 0.0 Miles | Actual: | $3,175,995 |
Bid Tabulations Back... |
Totals for 2452-02-082 | ||
Length: | 0.0 Miles | ||
Estimate: | $2,731,612 | ||
Actual: | $3,175,995 |
|
|