Detail Letting Schedule for Bexar County (FY 2012)

 
 
Last Update: Monday, September 24, 2012
Bexar County (FY 2012)

CCSJ: 0017-10-257

District: San Antonio Let Date: DEC 2011
Highway: IH 35 Let Status: Actual
Project ID: CRX 17-10-257 CSJ: 0017-10-257
Description: RAILROAD GRADE CROSSING REPLANKING Handling
Code:
XX
Limits From: ON IH 35 SBFR NORTH OF TAMPICO Fund Cat: 10
Limits To: AT UPRR DOT# 764991 Estimate: $30,080
Length: 0.1 Miles Actual: $30,080
 
Back...

Totals for 0017-10-257
Length: 0.1 Miles
Estimate: $30,080
Actual: $30,080

CCSJ: 0017-10-258

District: San Antonio Let Date: DEC 2011
Highway: IH 35 Let Status: Actual
Project ID: CRX 17-10-258 CSJ: 0017-10-258
Description: RAILROAD GRADE CROSSING REPLANKING Handling
Code:
XX
Limits From: ON IH 35 NBFR NORTH OF W CAVALLOS Fund Cat: 10
Limits To: AT UPRR DOT# 764341 D Estimate: $30,080
Length: 0.1 Miles Actual: $30,080
 
Back...

Totals for 0017-10-258
Length: 0.1 Miles
Estimate: $30,080
Actual: $30,080

CCSJ: 0017-10-265

District: San Antonio Let Date: AUG 2012
Highway: IH 35 Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0017-10-265
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: IH 35 WESTBOUND FRONTAGE ROAD Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.1 Miles Actual: $212,667
 
Back...

Totals for 0017-10-265
Length: 0.1 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0017-10-266

District: San Antonio Let Date: AUG 2012
Highway: IH 35 Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0017-10-266
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: IH 35 EASTBOUND FRONTAGE ROAD Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 1.0 Miles Actual: $212,667
 
Back...

Totals for 0017-10-266
Length: 1.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0017-11-038

District: San Antonio Let Date: AUG 2012
Highway: SP 536 Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0017-11-038
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: SPUR 536 (PROBANDT) Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 1.0 Miles Actual: $212,667
 
Back...

Totals for 0017-11-038
Length: 1.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0025-02-190

District: San Antonio Let Date: DEC 2011
Highway: IH 10 Let Status: Actual
Project ID: IM 0104(376) CSJ: 0025-02-190
Description: BASE REPAIR, SEAL COAT, OVERLAY AND PAVEMENT MARKINGS - Handling
Code:
 
Limits From: FOSTER ROAD Fund Cat: 1
Limits To: LOOP 1604 Estimate: $3,491,831
Length: 4.3 Miles Actual: $2,561,314
 
Back...

Totals for 0025-02-190
Length: 4.3 Miles
Estimate: $3,491,831
Actual: $2,561,314

CCSJ: 0072-08-132

District: San Antonio Let Date: SEP 2011
Highway: LP 345 Let Status: Actual
Project ID: NH 2012(034) CSJ: 0072-08-132
Description: MILL, BASE REPAIR, SEAL COAT, OVERLAY, & PAVEMENT MARKINGS Handling
Code:
 
Limits From: IH 410 Fund Cat: 1
Limits To: PASADENA Estimate: $1,927,827
Length: 2.3 Miles Actual: $1,716,677
 
District: San Antonio Let Date: SEP 2011
Highway: LP 345 Let Status: Actual
Project ID: RW 72-8-135 CSJ: 0072-08-135
Description: UTILITY ADJUSTMENTS Handling
Code:
 
Limits From: IH 410 Fund Cat: ROW
Limits To: PASADENA Estimate:  
Length: 2.3 Miles Actual: $25,620
 
District: San Antonio Let Date: SEP 2011
Highway: LP 345 Let Status: Actual
Project ID: NH 2012(034) CSJ: 0072-09-012
Description: MILL, BASE REPAIR, SEAL COAT, OVERLAY, & PAVEMENT MARKINGS Handling
Code:
 
Limits From: PASADENA Fund Cat: 1
Limits To: IH 10 Estimate: $612,061
Length: 1.3 Miles Actual: $550,484
 
Back...

Totals for 0072-08-132
Length: 5.9 Miles
Estimate: $2,539,888
Actual: $2,292,781

CCSJ: 0072-08-133

District: San Antonio Let Date: FEB 2012
Highway: IH 10 Let Status: Actual
Project ID: IM 0104(378) CSJ: 0072-08-133
Description: MILL, OVERLAY AND PAVEMENT MARKINGS Handling
Code:
 
Limits From: DOMINION DRIVE Fund Cat: 1
Limits To: LOOP 1604 Estimate: $2,595,277
Length: 2.2 Miles Actual: $1,974,468
 
Back...

Totals for 0072-08-133
Length: 2.2 Miles
Estimate: $2,595,277
Actual: $1,974,468

CCSJ: 0073-08-164

District: San Antonio Let Date: APR 2012
Highway: IH 37 Let Status: Actual
Project ID: IM 0372(086) CSJ: 0073-08-164
Description: MILL, BASE REPAIR, SEAL COAT, OVERLAY, SIGNS & PAVEMENT Handling
Code:
 
Limits From: 0.5 MI N OF SOUTHTON RD Fund Cat: 1
Limits To: 0.1 MI N OF US 181 Estimate: $980,940
Length: 1.4 Miles Actual: $888,348
 
District: San Antonio Let Date: APR 2012
Highway: IH 37 Let Status: Actual
Project ID: IM 0372(086) CSJ: 0073-09-032
Description: MILL, BASE REPAIR, SEAL COAT, OVERLAY, SIGNS & PAVEMENT Handling
Code:
 
Limits From: BEXAR COUNTY LINE Fund Cat: 1
Limits To: 0.5 MI N OF SOUTHTON RD Estimate: $3,764,491
Length: 11.9 Miles Actual: $2,985,092
 
Back...

Totals for 0073-08-164
Length: 13.3 Miles
Estimate: $4,745,431
Actual: $3,873,440

CCSJ: 0073-08-168

District: San Antonio Let Date: FEB 2012
Highway: US 281 Let Status: Actual
Project ID: NH 2012(288) CSJ: 0073-08-168
Description: LANDSCAPE DEVELOPMENT Handling
Code:
 
Limits From: 0.25 MILES N OF IH 410 Fund Cat: 10
Limits To: 0.3 MI S OF JONES MALTSBERGER RD Estimate: $699,893
Length: 1.1 Miles Actual: $662,704
 
Back...

Totals for 0073-08-168
Length: 1.1 Miles
Estimate: $699,893
Actual: $662,704

CCSJ: 0465-01-057

District: San Antonio Let Date: AUG 2012
Highway: SH 218 Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0465-01-057
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: SH 218 (PAT BOOKER RD) Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.1 Miles Actual: $212,667
 
Back...

Totals for 0465-01-057
Length: 0.1 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0521-04-273

District: San Antonio Let Date: DEC 2011
Highway: IH 410 Let Status: Actual
Project ID: IM 4104(377) CSJ: 0521-04-273
Description: ULTRA THIN BONDED WEARING COURSE & PVMT MRK Handling
Code:
 
Limits From: IH 10 Fund Cat: 1
Limits To: BLANCO Estimate: $1,947,481
Length: 2.6 Miles Actual: $1,815,375
 
Back...

Totals for 0521-04-273
Length: 2.6 Miles
Estimate: $1,947,481
Actual: $1,815,375

CCSJ: 0521-05-122

District: San Antonio Let Date: AUG 2012
Highway: IH 410 Let Status: Actual
Project ID: BOR 2003(33) CSJ: 0521-05-122
Description: RELOCATING ENTRANCE & EXIT RAMPS BETWEEN RR OVERPASSES Handling
Code:
 
Limits From: UPRR, 1.0 MI N OF IH 35 Fund Cat: 3
Limits To: FM 2536 Estimate: $1,466,692
Length: 0.8 Miles Actual: $1,468,825
 
Award Status
Bid Tabulations
Back...

Totals for 0521-05-122
Length: 0.8 Miles
Estimate: $1,466,692
Actual: $1,468,825

CCSJ: 0915-00-157

District: San Antonio Let Date: DEC 2011
Highway: VA Let Status: Actual
Project ID: STP 2012(161) CSJ: 0915-00-157
Description: DISTRICTWIDE GUIDESIGNS FY12 Handling
Code:
 
Limits From: DISTRICTWIDE GUIDESIGNS FY12 Fund Cat: 1
Limits To: . Estimate: $2,408,140
Length: 0.0 Miles Actual: $1,666,183
 
Back...

Totals for 0915-00-157
Length: 0.0 Miles
Estimate: $2,408,140
Actual: $1,666,183

CCSJ: 0915-00-158

District: San Antonio Let Date: FEB 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(311) CSJ: 0915-00-158
Description: DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS Handling
Code:
 
Limits From: DISTRICTWIDE TRAFFIC CNTRL FY 2012 Fund Cat: 1
Limits To: . Estimate: $1,169,568
Length: 0.0 Miles Actual: $1,113,075
 
Back...

Totals for 0915-00-158
Length: 0.0 Miles
Estimate: $1,169,568
Actual: $1,113,075

CCSJ: 0915-00-163

District: San Antonio Let Date: FEB 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(312) CSJ: 0915-00-163
Description: DISTRICTWIDE NON - SITE SPECIFIC TRAFFIC SIGNALS Handling
Code:
 
Limits From: DISTRICTWIDE TRAFFIC CNTRL FY 2012 Fund Cat: 1
Limits To: . Estimate: $1,004,553
Length: 0.0 Miles Actual: $942,876
 
Back...

Totals for 0915-00-163
Length: 0.0 Miles
Estimate: $1,004,553
Actual: $942,876

CCSJ: 0915-12-438

District: San Antonio Let Date: AUG 2012
Highway: VA Let Status: Actual
Project ID: HP 1102(121) CSJ: 0915-12-438
Description: PHASE 4 & 5 ENHANCE RDWYS, TRAILS, MRKRS THAT LEAD TO MISSIONS Handling
Code:
LC
Limits From: IN SA, MITCHELL ST TO S. ALAMO Fund Cat: 3
Limits To: MISSION TRAILS 'ESPADA' TO 'ALAMO' Estimate: $6,855,000
Length: 0.0 Miles Actual: $4,074,498
 
Back...

Totals for 0915-12-438
Length: 0.0 Miles
Estimate: $6,855,000
Actual: $4,074,498

CCSJ: 0915-12-470

District: San Antonio Let Date: JAN 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(119)MM CSJ: 0915-12-470
Description: WIDEN ROADWAY TO CONSTRUCT TURN LANES AND UPGRADE SIGNAL Handling
Code:
LC
Limits From: IN SAN ANTONIO ON HARRY WURZBACH RD Fund Cat: 3
Limits To: AT WINANS ROAD Estimate: $1,300,000
Length: 0.1 Miles Actual: $2,433,384
 
District: San Antonio Let Date: JAN 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(119)MM CSJ: 0915-12-471
Description: WIDEN ROADWAY TO CONSTRUCT TURN LANES AND UPGRADE SIGNAL Handling
Code:
LC
Limits From: IN SAN ANTONIO ON HARRY WURZBACH RD Fund Cat: 3
Limits To: AT BURR ROAD Estimate: $1,100,000
Length: 0.1 Miles Actual: $1,010,314
 
District: San Antonio Let Date: JAN 2012
Highway: CS Let Status: Actual
Project ID: PLD 1102(120) CSJ: 0915-12-480
Description: WIDEN ROADWAY TO EXTEND LEFT TURN LANES AND UPDATE SIGNAL Handling
Code:
LC
Limits From: IN SAN ANTONIO ON HARRY WURZBACH RD Fund Cat: 3
Limits To: AT RITTIMAN ROAD Estimate: $6,327,859
Length: 0.1 Miles Actual: $3,927,588
 
Back...

Totals for 0915-12-470
Length: 0.3 Miles
Estimate: $8,727,859
Actual: $7,371,286

CCSJ: 0915-12-485

District: San Antonio Let Date: SEP 2011
Highway: VA Let Status: Actual
Project ID: STP 1102(268)MM CSJ: 0915-12-485
Description: ALAMO AREA COMMUTE SOLUTION PGM - FY 2011 Handling
Code:
XX
Limits From: IN SAN ANTONIO/BEXAR CO AREA Fund Cat: 7
Limits To: . Estimate: $267,000
Length: 0.0 Miles Actual: $267,000
 
Back...

Totals for 0915-12-485
Length: 0.0 Miles
Estimate: $267,000
Actual: $267,000

CCSJ: 0915-12-486

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(191)SRS CSJ: 0915-12-486
Description: CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, IMPROVE PED BRIDGE Handling
Code:
LC
Limits From: GLASS ELEMENTARY SCHOOL Fund Cat: 8
Limits To: . Estimate: $407,271
Length: 0.0 Miles Actual: $297,339
 
District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 1102(192)SRS CSJ: 0915-12-487
Description: CONSTRUCT SIDEWALKS, INSTALL CROSSWALKS, IMPROVE PED BRIDGE Handling
Code:
LC
Limits From: NEFF MIDDLE SCHOOL Fund Cat: 3
Limits To: . Estimate: $499,898
Length: 0.0 Miles Actual: $842,105
 
Back...

Totals for 0915-12-486
Length: 0.0 Miles
Estimate: $907,169
Actual: $1,139,444

CCSJ: 0915-12-490

District: San Antonio Let Date: AUG 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(758)MM CSJ: 0915-12-490
Description: COSTS ASSOCIATED WITH BUS PURCHASES, ROW, CONSTRUCTION, Handling
Code:
TR
Limits From: MEDICAL CENTER Fund Cat: 7
Limits To: DOWNTOWN- VIA FREDRICKSBURG RD Estimate: $4,300,000
Length: 0.0 Miles Actual: $4,300,000
 
Back...

Totals for 0915-12-490
Length: 0.0 Miles
Estimate: $4,300,000
Actual: $4,300,000

CCSJ: 0915-12-491

District: San Antonio Let Date: AUG 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(801)MM CSJ: 0915-12-491
Description: ALAMO AREA COMMUTE SOLUTION PGM - FY 2012 Handling
Code:
XX
Limits From: IN SAN ANTONIO/BEXAR CO AREA Fund Cat: 7
Limits To: . Estimate: $267,000
Length: 0.0 Miles Actual: $267,000
 
Back...

Totals for 0915-12-491
Length: 0.0 Miles
Estimate: $267,000
Actual: $267,000

CCSJ: 0915-12-494

District: San Antonio Let Date: MAY 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(531) CSJ: 0915-12-494
Description: CONSTRUCT CURB RAMPS FOR ADA COMPLIANCE Handling
Code:
 
Limits From: IH 35 AND VARIOUS LOCATIONS_IN Fund Cat: 10
Limits To: BEXAR COUNTY Estimate: $2,889,842
Length: 0.0 Miles Actual: $2,893,180
 
Back...

Totals for 0915-12-494
Length: 0.0 Miles
Estimate: $2,889,842
Actual: $2,893,180

CCSJ: 0915-12-495

District: San Antonio Let Date: AUG 2012
Highway: VA Let Status: Actual
Project ID: STP 2013(198)MM CSJ: 0915-12-495
Description: FURNISH & INSTALL EQUIPMENT TO EXPAND TRAFFIC SIGNAL Handling
Code:
XX
Limits From: VARIOUS LOCATIONS IN SAN ANTONIO Fund Cat: 3
Limits To: . Estimate: $1,500,000
Length: 0.0 Miles Actual: $1,500,000
 
Back...

Totals for 0915-12-495
Length: 0.0 Miles
Estimate: $1,500,000
Actual: $1,500,000

CCSJ: 0915-12-497

District: San Antonio Let Date: JAN 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(406) CSJ: 0915-12-497
Description: PURCHASE AND INSTALL WRONG WAY SIGNS AND DETECTION EQUIPMENT Handling
Code:
XX
Limits From: VARIOUS LOCATIONS IN BEXAR COUNTY Fund Cat: 1
Limits To: . Estimate: $500,000
Length: 0.0 Miles Actual: $500,000
 
Back...

Totals for 0915-12-497
Length: 0.0 Miles
Estimate: $500,000
Actual: $500,000

CCSJ: 0915-12-498

District: San Antonio Let Date: APR 2012
Highway: VA Let Status: Actual
Project ID: STP 2012(585)MM CSJ: 0915-12-498
Description: COSTS ASSOCIATED WITH BUS PURCHASES, ROW, CONSTRUCTION, Handling
Code:
TR
Limits From: MEDICAL CENTER Fund Cat: 7
Limits To: DOWNTOWN - VIA FREDRICKSBURG RD Estimate: $10,100,000
Length: 0.0 Miles Actual: $10,100,000
 
Back...

Totals for 0915-12-498
Length: 0.0 Miles
Estimate: $10,100,000
Actual: $10,100,000

CCSJ: 0915-12-500

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-500
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: GUADALUPE STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-500
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-501

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-501
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: S ZARZAMORA STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-501
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-502

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-502
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: THOUSAND OAKS Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-502
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-503

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-503
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: SOUTH FLORES STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-503
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-504

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-504
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: SOUTH PRESA STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-504
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-505

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-505
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: WALZEM ROAD Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-505
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-506

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-506
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: ZARZAMORA STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-506
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 0915-12-507

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-507
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: HOEFGEN STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $150,000
Length: 0.0 Miles Actual: $150,000
 
Back...

Totals for 0915-12-507
Length: 0.0 Miles
Estimate: $150,000
Actual: $150,000

CCSJ: 0915-12-508

District: San Antonio Let Date: AUG 2012
Highway: CS Let Status: Actual
Project ID: STP 2012(401)FRS CSJ: 0915-12-508
Description: STUDY RAILROAD CROSSING TO MAKE SAFETY ENCHANCEMENTS Handling
Code:
XX
Limits From: S SAN MARCOS STREET Fund Cat: 8
Limits To: AT UPRR Estimate: $212,667
Length: 0.0 Miles Actual: $212,667
 
Back...

Totals for 0915-12-508
Length: 0.0 Miles
Estimate: $212,667
Actual: $212,667

CCSJ: 1890-02-007

District: San Antonio Let Date: FEB 2012
Highway: FM 1516 Let Status: Actual
Project ID: CRX 1890-2-7 CSJ: 1890-02-007
Description: RAILROAD GRADE CROSSING REPLANKING Handling
Code:
XX
Limits From: 0.08 MI S OF FM 1976 Fund Cat: 10
Limits To: AT UPRR DOT #764356T Estimate: $90,240
Length: 0.1 Miles Actual: $90,240
 
Back...

Totals for 1890-02-007
Length: 0.1 Miles
Estimate: $90,240
Actual: $90,240

CCSJ: 2452-01-043

District: San Antonio Let Date: JAN 2012
Highway: LP 1604 Let Status: Actual
Project ID: NH 2007(705) CSJ: 2452-01-043
Description: CONSTRUCT INTERCHANGE (PHASE 1A - SH 151 ML'S) Handling
Code:
 
Limits From: AT SH 151 Fund Cat: 1
Limits To: . Estimate: $16,222,283
Length: 0.4 Miles Actual: $14,882,513
 
District: San Antonio Let Date: JAN 2012
Highway: LP 1604 Let Status: Actual
Project ID: RW 2452-1-48 CSJ: 2452-01-048
Description: RIGHT OF WAY UTILITIES ADJUSTMENTS Handling
Code:
 
Limits From: AT SH 151 Fund Cat: ROW
Limits To: . Estimate:  
Length: 0.4 Miles Actual: $244,327
 
Back...

Totals for 2452-01-043
Length: 0.8 Miles
Estimate: $16,222,283
Actual: $15,126,840

CCSJ: 2452-02-081

District: San Antonio Let Date: SEP 2011
Highway: LP 1604 Let Status: Actual
Project ID: NH 2012(038) CSJ: 2452-02-081
Description: CONSTRUCT EB TO WB LP 1604 TURNAROUND Handling
Code:
 
Limits From: AT IH 10 Fund Cat: 1
Limits To: . Estimate: $1,715,817
Length: 0.6 Miles Actual: $1,684,204
 
Back...

Totals for 2452-02-081
Length: 0.6 Miles
Estimate: $1,715,817
Actual: $1,684,204

CCSJ: 2452-02-082

District: San Antonio Let Date: JUL 2012
Highway: LP 1604 Let Status: Actual
Project ID: C 2452-2-82 CSJ: 2452-02-082
Description: CONSTRUCT BRIDGE BETWEEN FRONTAGE RDS Handling
Code:
 
Limits From: AT VANCE JACKSON Fund Cat: 3
Limits To: . Estimate: $2,731,612
Length: 0.0 Miles Actual: $3,175,995
 
Bid Tabulations
Back...

Totals for 2452-02-082
Length: 0.0 Miles
Estimate: $2,731,612
Actual: $3,175,995


Handling Code Definition
XX Project not processed through statewide letting
TR Transfer of funds
LC Project let through local entity
NC Project not charged against district apportionment



Let Status Definition
Tentative Estimated letting date for this project
Approved Project has administrative approval to be let
Actual Project was let to contract